HAS-SR 258-01.18
HAS County · est $0.3M
Bid dateThursday, May 7—
HAS County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Dennison Bridge INC | R3Craig Edward Susany INC | R4Shelly & Sands INC | R5Ohio-west Virginia Excavating CO | R6Lockhart Concrete CO | R7R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $18,000 | $30,000 | $23,500 | $8,550 | $35,000 | $30,000 | 12% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 985 FT | $23.00 | $30.00 | $26.00 | $30.00 | $29.00 | $22.00 | $35.00 | 11% |
| Item | Quantity | R1Alan Stone CO INC | R2Dennison Bridge INC | R3Craig Edward Susany INC | R4Shelly & Sands INC | R5Ohio-west Virginia Excavating CO | R6Lockhart Concrete CO | R7R C Construction Company And Son |
|---|---|---|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 241 SY | $9.00 | $16.00 | $12.00 | $20.00 | $23.00 | $12.00 | $40.00 |
| 202E38000 GUARDRAIL REMOVED | 200 FT | $3.00 | $2.00 | $2.00 | $2.00 | $5.77 | $3.00 | $5.00 |
| 202E75000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $22,000 |
| $10,000 |
| $10,000 |
| $10,000 |
| $15,200 |
| $31,700 |
| $12,500 |
| 11% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 541 FT | $37.00 | $50.00 | $56.00 | $65.00 | $45.00 | $122 | $125 | 10% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 290 FT | $56.00 | $75.00 | $87.00 | $89.00 | $81.00 | $122 | $125 | 8% |
| 511E81300 CONCRETE, MISC.: 8"x24"x57" PRECAST CONCRETE LAGGI | 84 EACH | $170 | $200 | $173 | $225 | $133 | $300 | $200 | 7% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 202 SY | $58.00 | $100 | $70.00 | $70.00 | $136 | $200 | $175 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $270 | $300 | $400 | $325 | $248 | $242 | $450 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (26 CY | $310 | $350 | $400 | $325 | $325 | $462 | $475 | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 21 CY | $380 | $450 | $400 | $450 | $494 | $500 | $450 | 4% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $7,800 | $5,000 | $10,000 | $17,500 | $12,865 | $19,000 | $15,000 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $1,000 | $100 | $7,500 | $5,350 | $1,000 | $3,500 | 3% |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), 24" | 2 EACH | $2,700 | $2,000 | $2,000 | $2,485 | $2,700 | $950 | $2,500 | 3% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 241 CY | $21.00 | $65.00 | $45.00 | $35.00 | $44.00 | $30.00 | $50.00 | 2% |
| 659E00300 TOPSOIL | 96 CY | $51.00 | $20.00 | $30.00 | $45.00 | $123 | $30.00 | $50.00 | 2% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 131.25 FT | $35.00 | $32.00 | $31.00 | $33.00 | $46.40 | $28.00 | $45.00 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 47 CY | $90.00 | $130 | $100 | $175 | $158 | $50.00 | $200 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 220 FT | $19.00 | $14.00 | $22.00 | $35.00 | $58.00 | $32.00 | $30.00 | 2% |
| 304E20000 AGGREGATE BASE | 56 CY | $74.00 | $125 | $80.00 | $90.00 | $99.00 | $50.00 | $125 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $2,500 | $3,000 | $4,800 | $900 | $12,500 | $12,500 | 2% |
| 140 FT |
| $2.00 |
| $2.00 |
| $2.00 |
| $4.50 |
| $3.80 |
| $3.00 |
| $20.00 |
| 203E10000 EXCAVATION | 24 CY | $14.00 | $25.00 | $17.00 | $20.00 | $35.00 | $30.00 | $20.00 |
| 203E20000 EMBANKMENT | 88 CY | $15.00 | $30.00 | $17.00 | $22.00 | $98.00 | $30.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 341 SY | $3.00 | $3.00 | $3.00 | $6.00 | $2.00 | $2.00 | $2.00 |
| 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 68.75 FT | $44.00 | $37.00 | $36.00 | $41.50 | $57.20 | $31.00 | $50.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $50.00 | $30.00 | $88.00 | $60.00 | $500 | $20.00 |
| 659E10000 SEEDING AND MULCHING | 866 SY | $2.00 | $3.00 | $4.00 | $2.80 | $1.50 | $2.00 | $10.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.12 TON | $3,500 | $500 | $500 | $652 | $1,750 | $700 | $1,200 |
| 659E31000 LIME | 0.18 ACRE | $840 | $100 | $75.00 | $152 | $1,950 | $600 | $800 |
| 659E35000 WATER | 5 MGAL | $21.00 | $10.00 | $1.00 | $1.00 | $500 | $50.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $330 | $300 | $150 | $300 | $185 | $750 | $275 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 720 FT | $4.00 | $3.00 | $2.00 | $2.00 | $4.40 | $3.00 | $10.00 |
| 304E20001 AGGREGATE BASE, AS PER PLAN | 46 CY | $80.00 | $125 | $80.00 | $90.00 | $108 | $50.00 | $150 |
| 407E10000 TACK COAT | 17 GAL | $4.00 | $10.00 | $3.00 | $2.50 | $40.50 | $2.50 | $10.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $25.00 | $10.00 | $5.00 | $14.00 | $64.50 | $125 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 3 EACH | $8.00 | $10.00 | $7.00 | $7.50 | $12.00 | $10.00 | $20.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 16 FT | $29.00 | $20.00 | $7.00 | $27.50 | $17.50 | $12.00 | $40.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $48.00 | $75.00 | $42.00 | $45.00 | $57.00 | $50.00 | $175 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $100 | $50.00 | $25.00 | $95.00 | $92.00 | $75.00 | $175 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.21 MILE | $4,100 | $4,000 | $5,000 | $3,850 | $4,500 | $3,800 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $7,400 | $7,000 | $7,500 | $6,990 | $8,000 | $5,200 | $12,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 5 EACH | $51.00 | $10.00 | $22.00 | $10.00 | $55.00 | $12.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 5 EACH | $53.00 | $20.00 | $34.00 | $15.00 | $57.00 | $14.00 | $20.00 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.19 MILE | $9,400 | $9,000 | $9,000 | $8,900 | $10,200 | $8,500 | $12,500 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $14.00 | $10.00 | $13.00 | $12.50 | $14.50 | $5.00 | $50.00 |
| 616E10000 WATER | 10 MGAL | $21.00 | $10.00 | $1.00 | $15.00 | $500 | $5.00 | $1.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 143 FT | $6.00 | $10.00 | $6.00 | $7.00 | $13.00 | $15.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 7 FT | $31.00 | $20.00 | $15.00 | $30.00 | $64.00 | $25.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $3,100 | $7,500 | $2,607 | $4,350 | $14,900 | $16,500 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $970 | $500 | $500 | $3,300 | $1,375 | $650 | $100 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 10% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 985 FT | $23 | $23k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $22,000 | $22k | 9% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 541 FT | $37 | $20k | 8% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 290 FT | $56 | $16k | 7% |
| 511E81300 CONCRETE, MISC.: 8"x24"x57" PRECAST CONCRETE LAGGI | 84 EACH | $170 | $14k | 6% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 202 SY | $58 | $12k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $270 | $10k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (26 CY | $310 | $8k | 3% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 21 CY | $380 | $8k | 3% |