| Item | Quantity | R1Vernon Nagel INC | R2E S Wagner Company | R3Geddis Paving & Excavating INC | % of bid |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 22,181 CY | $9.75 | $8.62 | $18.50 | 24% |
| 203E40001 BORROW, AS PER PLAN | 25,312 CY | $7.50 | $11.75 | $19.50 | 21% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 3,065 CY | $35.00 | $23.50 | $32.50 | 12% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,530 CY | $48.00 | $67.00 | $62.00 | 8% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1.00 | $1.00 | $1.00 |
| Item | Quantity | R1Vernon Nagel INC | R2E S Wagner Company | R3Geddis Paving & Excavating INC |
|---|---|---|---|---|
| 202E32000 CURB REMOVED | 37 FT | $5.00 | $12.00 | $8.00 |
| 202E38000 GUARDRAIL REMOVED | 932 FT | $2.00 | $1.60 | $1.60 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $145 | $145 | $145 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $105 | $105 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $70.00 | $70.00 | $70.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 861 CY | $35.00 | $34.00 | $37.50 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,400 FT | $20.00 | $15.00 | $70.00 | 3% |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 534 SY | $44.00 | $74.00 | $50.00 | 3% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $29,796 | $14,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $40,000 | $20,000 | 2% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN, WITH STEEL POSTS | 937.5 FT | $20.00 | $19.20 | $19.20 | 2% |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (PERFORATED) | 2,237 FT | $7.00 | $2.00 | $1.15 | 2% |
| 607E15000 FENCE, TYPE 47 | 1,530 FT | $9.50 | $9.50 | $9.50 | 2% |
| 659E10000 SEEDING AND MULCHING | 15,500 SY | $0.88 | $0.50 | $0.50 | 2% |
| 609E24510 CURB, TYPE 4-C | 677 FT | $19.00 | $16.00 | $18.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,500 | $5,149 | $13,000 | 1% |
| 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A | 7,098 SY | $1.75 | $0.87 | $0.90 | 1% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 533 SY | $20.00 | $11.00 | $16.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $29,500 | $30,000 | 1% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 30 CY | $280 | $400 | $470 | 1% |
| 202E75001 FENCE REMOVED, AS PER PLAN | 100 FT | $3.00 | $2.90 | $2.90 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,340 | $2,340 | $2,340 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $980 | $980 | $980 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,050 | $2,050 | $2,050 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $470 | $470 | $470 |
| 601E21100 SLOPE PROTECTION, MISC.:: REMOVE, STORE AND RE-PLA | 115 SY | $20.00 | $74.00 | $90.50 |
| 659E00300 TOPSOIL | 107 CY | $25.00 | $31.00 | $105 |
| 659E14000 REPAIR SEEDING AND MULCHING | 775 SY | $0.50 | $2.78 | $0.50 |
| 659E15000 INTER-SEEDING | 775 SY | $0.25 | $0.25 | $0.25 |
| 659E20000 COMMERCIAL FERTILIZER | 2.25 TON | $580 | $580 | $580 |
| 659E35000 WATER | 86 MGAL | $1.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 970 SY | $1.80 | $1.80 | $1.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,500 | $2,200 | $935 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $1,500 | $4,500 | $3,400 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,350 | $7,500 | $8,600 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 184 FT | $17.00 | $33.00 | $38.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 8 EACH | $250 | $800 | $1,200 |
| 304E20000 AGGREGATE BASE | 31 CY | $55.00 | $70.00 | $120 |
| 407E20000 NON-TRACKING TACK COAT | 17 GAL | $2.00 | $1.00 | $1.00 |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 9 CY | $500 | $600 | $600 |
| 609E24511 CURB, TYPE 4-C, AS PER PLAN | 12 FT | $43.00 | $56.00 | $45.50 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 240 LB | $1.25 | $5.00 | $3.50 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 1 EACH | $10.00 | $8.65 | $10.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 11 EACH | $10.00 | $8.65 | $10.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 17 FT | $15.00 | $20.00 | $23.50 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $50.00 | $65.00 | $76.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $15.00 | $15.00 | $17.50 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.6 MILE | $3,000 | $3,000 | $5,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $65.00 | $57.00 | $90.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 270 FT | $1.50 | $0.36 | $2.40 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,000 | $2,520 | $3,320 |
| 614E12400 WORK ZONE IMPACT ATTENUATOR, MISC.: REMOVE AND DEL | 19 EACH | $55.00 | $200 | $95.00 |
| 614E12500 REPLACEMENT SIGN | 4 EACH | $125 | $300 | $130 |
| 614E12600 REPLACEMENT DRUM | 4 EACH | $60.00 | $75.00 | $35.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 28 EACH | $6.00 | $5.00 | $11.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 27 EACH | $12.00 | $10.00 | $27.50 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.6 MILE | $3,000 | $3,000 | $12,000 |
| 616E10000 WATER | 200 MGAL | $5.00 | $28.00 | $1.00 |
| 622E90000 BARRIER, MISC.: REMOVE AND DELIVER PORTABLE CONCRE | 700 FT | $6.35 | $9.00 | $10.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $9,800 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 22,181 CY | $9.75 | $216k | 23% |
| 203E40001 BORROW, AS PER PLAN | 25,312 CY | $7.5 | $190k | 20% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 3,065 CY | $35 | $107k | 11% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,530 CY | $48 | $73k | 8% |
| 832E30000 EROSION CONTROL | 50,000 EACH | $1 | $50k | 5% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 861 CY | $35 | $30k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,400 FT | $20 | $28k | 3% |
| 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2 | 534 SY | $44 | $23k | 2% |
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $20,000 | $20k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 2% |