D10-GR CAL2021 DD
D10 County · est $0.6M
Bid dateThursday, June 18—
D10 County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5%
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E13000 GUARDRAIL, TYPE 5 | 8,500 FT | $15.8 | $134k | 23% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | R3Pdk Construction INC | % of bid |
|---|---|---|---|---|---|
| 606E13000 GUARDRAIL, TYPE 5 | 8,500 FT | $15.80 | $15.00 | $18.00 | 25% |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 60 EACH | $2,050 | $2,000 | $2,100 | 23% |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 30 EACH | $1,760 | $1,700 | $1,800 | 10% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $4,120 | $4,200 | $4,200 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $38,375 | $20,000 | $100,000 | 7% |
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | R3Pdk Construction INC |
|---|---|---|---|---|
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 50 FT | $2.40 | $3.00 | $3.00 |
| 202E38500 BRIDGE RAILING REMOVED | 50 FT | $2.00 | $7.50 | $3.00 |
| 202E38700 GUARDRAIL POST REMOVED | 5 EACH | $2.00 | $10.00 | $5.00 |
| 202E42806 ANCHOR ASSEMBLY REMOVED FOR REUSE | 15 EACH | $50.00 | $200 | $50.00 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 2 EACH | $95.00 | $100 | $80.00 |
| 202E47200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 202E38000 GUARDRAIL REMOVED | 9,500 FT | $1.80 | $2.00 | $1.50 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,000 FT | $16.40 | $16.00 | $19.00 | 3% |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 100 EACH | $160 | $200 | $130 | 3% |
| 614E13600 MAINTENANCE OF TRAFFIC, ONE LANE CLOSURE ON A TWO | 120 EACH | $125 | $250 | $125 | 3% |
| 606E27851 ANCHOR ASSEMBLY REBUILT, TYPE E, AS PER PLAN | 10 EACH | $1,320 | $1,750 | $1,100 | 2% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 20 EACH | $645 | $750 | $700 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016 | 5 EACH | $2,120 | $2,200 | $2,100 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, NCHRP350 | 5 EACH | $2,120 | $2,150 | $2,100 | 2% |
| 614E13900 MAINTENANCE OF TRAFFIC FOR SHOULDER CLOSURE | 75 EACH | $125 | $125 | $80.00 | 2% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 5 EACH | $1,845 | $1,700 | $1,850 | 2% |
| 606E18501 GUARDRAIL POST, 9 FEET, AS PER PLAN | 100 EACH | $65.00 | $55.00 | $60.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,340 | $5,000 | $5,000 | 1% |
| 517E72300 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 50 FT | $78.00 | $85.00 | $100 | 1% |
| 606E98000 GUARDRAIL, MISC.:TUBULAR BACKUP | 50 FT | $75.00 | $125 | $100 | 1% |
| 614E13800 MAINTENANCE OF TRAFFIC, ONE LANE CLOSURE ON A 4 LA | 30 EACH | $115 | $500 | $100 | 1% |
| 1 EACH |
| $80.00 |
| $100 |
| $100 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 5 EACH | $225 | $150 | $300 |
| 202E98100 REMOVAL MISC.:IMPACT ATTENUATOR REMOVED FOR REUSE, | 1 EACH | $200 | $500 | $200 |
| 606E13050 GUARDRAIL, TYPE 5A | 50 FT | $20.40 | $25.00 | $22.00 |
| 606E15500 GUARDRAIL, BARRIER DESIGN, TYPE 5 | 100 FT | $27.80 | $25.00 | $25.00 |
| 606E16051 GUARDRAIL REBUILT, TYPE MGS, AS PER PLAN | 50 FT | $12.80 | $15.00 | $10.00 |
| 606E16501 GUARDRAIL REBUILT, TYPE 5, AS PER PLAN | 50 FT | $11.40 | $15.00 | $9.00 |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 100 FT | $21.20 | $25.00 | $22.00 |
| 606E17901 GUARDRAIL POST, AS PER PLAN | 10 EACH | $42.00 | $50.00 | $35.00 |
| 606E19001 GUARDRAIL POST, STEEL, AS PER PLAN | 10 EACH | $55.00 | $55.00 | $45.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $820 | $900 | $850 |
| 606E27841 ANCHOR ASSEMBLY REBUILT, TYPE B, AS PER PLAN | 2 EACH | $1,050 | $1,500 | $800 |
| 606E27847 ANCHOR ASSEMBLY REBUILT, MGS TYPE B, AS PER PLAN | 1 EACH | $1,075 | $1,500 | $900 |
| 606E27861 ANCHOR ASSEMBLY REBUILT, MGS TYPE E, AS PER PLAN | 1 EACH | $1,370 | $1,850 | $1,100 |
| 606E32160 BRIDGE TERMINAL ASSEMBLY, TYPE TST | 1 EACH | $1,385 | $1,350 | $1,500 |
| 606E32171 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE TST, AS PER | 1 EACH | $1,050 | $1,350 | $1,000 |
| 606E35000 BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $1,020 | $1,350 | $1,500 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $1,960 | $1,950 | $1,800 |
| 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $750 | $1,350 | $800 |
| 606E35012 MGS BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1 | 1 EACH | $900 | $1,950 | $900 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $360 | $400 | $400 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $385 | $400 | $425 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 2 EACH | $775 | $700 | $650 |
| 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4 | 2 EACH | $550 | $800 | $500 |
| 606E50000 SPECIAL - RESHAPING BERM | 50 FT | $1.20 | $10.00 | $2.00 |
| 606E60070 IMPACT ATTENUATOR REBUILT, TYPE 1 (BIDIRECTIONAL), | 1 EACH | $2,450 | $3,850 | $2,200 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 75 EACH | $5.00 | $8.00 | $7.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $45.00 | $75.00 | $50.00 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E | 60 EACH | $2,050 | $123k | 21% |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 30 EACH | $1,760 | $53k | 9% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $4,120 | $41k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $38,375 | $38k | 7% |
| 202E38000 GUARDRAIL REMOVED | 9,500 FT | $1.8 | $17k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,000 FT | $16.4 | $16k | 3% |
| 202E42206 ANCHOR ASSEMBLY REMOVED | 100 EACH | $160 | $16k | 3% |
| 614E13600 MAINTENANCE OF TRAFFIC, ONE LANE CLOSURE ON A TWO | 120 EACH | $125 | $15k | 3% |
| 606E27851 ANCHOR ASSEMBLY REBUILT, TYPE E, AS PER PLAN | 10 EACH | $1,320 | $13k | 2% |