BRO-SR 52-19.99
BRO County · est $0.1M
Bid dateThursday, August 13—
BRO County · est $0.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Sunesis Construction CO | % of bid |
|---|---|---|---|---|
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 3 EACH | $6,700 | $4,975 | 16% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 71 CY | $280 | $240 | 16% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $13,219 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,000 | $20,581 | 7% |
| 608E10000 4" CONCRETE WALK | 1,040 SF | $8.00 | $10.12 | 7% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (Average Depth | 907 SY | $9.00 | $10.94 | 7% |
| 609E58000 9" CONCRETE TRAFFIC ISLAND | 68 SY | $110 | $227 | 6% |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH |
| Item | Quantity | R1Axis Civil Construction LLC | R2Sunesis Construction CO |
|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 15 SY | $30.00 | $78.40 |
| 202E30000 WALK REMOVED | 70 SF | $5.00 | $4.20 |
| 203E10000 EXCAVATION | 32 CY | $30.00 | $228 |
| 203E20000 EMBANKMENT | 26 CY | $30.00 | $49.43 |
| 204E10000 SUBGRADE COMPACTION | 15 SY | $5.00 | $35.92 |
| 608E13020 7" CONCRETE WALK | 141 SF | $12.00 | $16.88 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $75.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,450 |
| $850 |
| 4% |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1.00 | $1.00 | 3% |
| 632E90010 PEDESTAL, MISC.:14', TRANSFORMER BASE | 3 EACH | $1,250 | $200 | 3% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.31 MILE | $11,775 | $12,518 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $2,775 | 3% |
| 644E00300 CENTER LINE | 0.31 MILE | $10,350 | $11,245 | 3% |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 205 FT | $12.14 | $7.75 | 2% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 920 FT | $2.50 | $2.40 | 2% |
| 608E52000 CURB RAMP | 96 SF | $22.00 | $13.69 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $22.34 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,165 | 2% |
| 608E53020 DETECTABLE WARNING | 64 SF | $30.00 | $22.06 | 2% |
| 659E00300 TOPSOIL | 47 CY | $40.00 | $82.48 | 2% |
| $203 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 425 SY | $2.00 | $6.72 |
| 659E14000 REPAIR SEEDING AND MULCHING | 21 SY | $3.00 | $15.47 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $500 | $620 |
| 659E31000 LIME | 0.1 ACRE | $500 | $443 |
| 659E35000 WATER | 2 MGAL | $5.00 | $1.39 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 4 CY | $450 | $303 |
| 304E20000 AGGREGATE BASE | 3 CY | $200 | $213 |
| 407E10000 TACK COAT | 11 GAL | $5.00 | $15.00 |
| 609E26000 CURB, TYPE 6 | 14 FT | $50.00 | $125 |
| 620E60000 DELINEATOR, POST SURFACE MOUNTED, TYPE D | 4 EACH | $145 | $135 |
| 625E32000 GROUND ROD | 3 EACH | $230 | $300 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 20 FT | $18.00 | $11.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 41 FT | $19.50 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 3 EACH | $27.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $85.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $40.00 | $25.00 |
| 644E00104 EDGE LINE, 6" | 0.06 MILE | $5,175 | $10,495 |
| 644E00500 STOP LINE, 24" | 17 FT | $11.75 | $7.90 |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 182 FT | $5.90 | $7.75 |
| 630E80100 SIGN, FLAT SHEET | 19 SF | $26.00 | $25.00 |
| 644E00404 CHANNELIZING LINE, 12" | 137 FT | $3.50 | $1.25 |
| 644E01300 LANE ARROW | 3 EACH | $190 | $150 |
| 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I | 0.06 MILE | $7,850 | $10,560 |
| 616E10000 WATER | 1 MGAL | $2.00 | $178 |
| 614E23400 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 740.06, | 137 FT | $7.85 | $3.25 |
| 614E30400 WORK ZONE ARROW, CLASS I, 740.06, TYPE I | 3 EACH | $250 | $170 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $900 | $1,660 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 3 EACH | $6,700 | $20k | 14% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 71 CY | $280 | $20k | 14% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $14k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,000 | $9k | 6% |
| 608E10000 4" CONCRETE WALK | 1,040 SF | $8 | $8k | 6% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (Average Depth | 907 SY | $9 | $8k | 6% |
| 609E58000 9" CONCRETE TRAFFIC ISLAND | 68 SY | $110 | $7k | 5% |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $1,450 | $4k | 3% |
| 832E30000 EROSION CONTROL | 4,000 EACH | $1 | $4k | 3% |
| 632E90010 PEDESTAL, MISC.:14', TRANSFORMER BASE | 3 EACH | $1,250 | $4k | 3% |