HEN-US 6-16.77 Slide Repair
HEN County · est $0.3M
Bid dateThursday, August 27—
HEN County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Vernon Nagel INC | R2Beaver Excavating Company | R3Geddis Paving & Excavating INC | % of bid |
|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 3,215 CY | $16.00 | $25.00 | $28.50 | 19% |
| 203E20000 EMBANKMENT | 2,305 CY | $18.00 | $32.50 | $39.00 | 15% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 493 CY | $75.00 | $70.00 | $69.00 | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 11" | 58 CY | $260 | $260 | $275 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 660 FT | $20.00 | $25.00 | $46.50 |
| Item | Quantity | R1Vernon Nagel INC | R2Beaver Excavating Company | R3Geddis Paving & Excavating INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,500 | $10,000 | $4,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $200 | $150 | $170 |
| 202E23000 PAVEMENT REMOVED | 188 SY | $12.00 | $20.00 | $33.00 |
| 202E32000 CURB REMOVED | 42 FT | $5.00 | $5.00 | $26.50 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 73 FT | $3.00 | $5.00 | $7.50 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN, NO. 8 STONE | 179 CY | $65.00 | $85.00 | $40.00 | 4% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $8,500 | $11,200 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $19,000 | $10,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | 4% |
| 253E02000 PAVEMENT REPAIR | 4 CY | $2,300 | $2,300 | $400 | 3% |
| 611E04600 12" CONDUIT, TYPE C, 706.01, 706.42, OR 707.45 | 79 FT | $100 | $90.00 | $87.00 | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 143 FT | $52.00 | $50.00 | $55.00 | 3% |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC | 904 SY | $8.00 | $2.00 | $1.35 | 3% |
| 442E20100 ASPHALT CONCRETE INTERMEDIATE COURSE, 9.5 MM, TYPE | 10 CY | $635 | $635 | $400 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,860 SY | $3.25 | $1.60 | $1.60 | 2% |
| 606E15101 GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN | 188 FT | $32.00 | $30.20 | $30.20 | 2% |
| 659E00300 TOPSOIL | 207 CY | $25.00 | $20.00 | $83.50 | 2% |
| 614E12391 WORK ZONE IMPACT ATTENUATOR, 24"-36" WIDE HAZARDS, | 2 EACH | $2,565 | $2,340 | $2,790 | 2% |
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 8 CY | $635 | $635 | $400 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $4,750 | $3,000 | 2% |
| 188 FT |
| $3.00 |
| $2.30 |
| $2.30 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 1 EACH | $250 | $115 | $115 |
| 203E35110 GRANULAR MATERIAL, TYPE B | 66 CY | $75.00 | $50.00 | $66.50 |
| 204E10000 SUBGRADE COMPACTION | 188 SY | $0.25 | $3.50 | $0.35 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 1 EACH | $2,670 | $2,525 | $3,025 |
| 690E76002 SPECIAL - 12" COMPOST FILTER SOCK FOR PERIMETER CO | 205 FT | $2.75 | $7.00 | $7.10 |
| 601E20011 CRUSHED AGGREGATE SLOPE PROTECTION, AS PER PLAN | 2 CY | $120 | $300 | $245 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT, | 35 SY | $120 | $90.00 | $105 |
| 659E14000 REPAIR SEEDING AND MULCHING | 93 SY | $1.60 | $1.60 | $1.60 |
| 659E15000 INTER-SEEDING | 93 SY | $1.00 | $1.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1 TON | $600 | $600 | $600 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $1.00 |
| 671E15050 EROSION CONTROL MAT, TYPE F | 1,860 SY | $2.50 | $2.50 | $2.50 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $200 | $100 | $515 |
| 602E20000 CONCRETE MASONRY | 1 CY | $275 | $650 | $775 |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 126 FT | $15.00 | $10.00 | $29.00 |
| 611E00401 4" CONDUIT, TYPE E, AS PER PLAN, PERFORATED 707.31 | 355 FT | $13.00 | $10.00 | $29.00 |
| 611E00407 4" CONDUIT, TYPE F, AS PER PLAN, NON-PERFORATED 70 | 46 FT | $13.00 | $30.00 | $29.00 |
| 611E04400 12" CONDUIT, TYPE B, 706.01 OR 706.02 | 4 FT | $100 | $200 | $135 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $3,500 | $2,500 | $3,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $250 | $400 | $650 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $2,500 | $1,000 | $6,100 |
| 304E20000 AGGREGATE BASE, 6" | 32 CY | $104 | $90.00 | $85.00 |
| 407E20000 NON-TRACKING TACK COAT | 16 GAL | $1.80 | $1.80 | $1.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 1,019 LB | $0.35 | $0.35 | $2.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $15.00 | $50.00 | $3.00 |
| 630E80100 SIGN, FLAT SHEET | 1 SF | $40.00 | $40.00 | $50.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $25.00 | $25.00 | $10.00 |
| 630E85600 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND REERECTIO | 1 EACH | $1,000 | $1,000 | $3,210 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $65.00 | $125 | $85.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 660 FT | $2.50 | $2.50 | $0.80 |
| 614E12600 REPLACEMENT DRUM | 8 EACH | $56.00 | $56.00 | $35.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 726.01 | 12 EACH | $8.00 | $8.00 | $12.50 |
| 614E13350 OBJECT MARKER, ONE WAY | 11 EACH | $16.00 | $39.00 | $23.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $950 | $950 | $2,350 |
| 659E35000 WATER | 8 MGAL | $1.00 | $50.00 | $1.10 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,000 | $2,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 3,215 CY | $16 | $51k | 16% |
| 203E20000 EMBANKMENT | 2,305 CY | $18 | $41k | 13% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 493 CY | $75 | $37k | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 11" | 58 CY | $260 | $15k | 5% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 660 FT | $20 | $13k | 4% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN, NO. 8 STONE | 179 CY | $65 | $12k | 4% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $10,000 | $10k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $10,000 | $10k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 253E02000 PAVEMENT REPAIR | 4 CY | $2,300 | $9k | 3% |