D10-Lighting FY2021
D10 County · est $0.3M
Bid dateThursday, October 1—
D10 County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Miller Cable Company | R3Perram Electric INC | R4Asplundh Construction LLC | R5M P Dory CO | % of bid |
|---|---|---|---|---|---|---|---|
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 27,843 FT | $1.70 | $1.70 | $2.17 | $3.33 | $3.50 | 23% |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 1,705 FT | $10.00 | $10.00 | $5.55 | $7.24 | $5.75 | 8% |
| 625E10490 LIGHT POLE, CONVENTIONAL :35' MOUNTING HEIGHT WITH | 7 EACH | $2,000 | $2,550 | $1,985 | $2,326 | $2,100 | 7% |
| Item | Quantity | R1Complete General Construction Company | R2Miller Cable Company | R3Perram Electric INC | R4Asplundh Construction LLC | R5M P Dory CO |
|---|---|---|---|---|---|---|
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $500 | $20.00 | $400 | $17,546 | $750 |
| 659E31000 LIME | 0.2 ACRE | $200 | $20.00 | $100 | $3,258 | $150 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $3.00 | $120 | $1.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1,640 FT |
| $8.00 |
| $12.00 |
| $10.60 |
| $5.50 |
| $9.75 |
| 6% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 :2" | 457 FT | $25.00 | $16.00 | $49.75 | $41.90 | $45.00 | 6% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,000 | $2,200 | $1,870 | $1,215 | $2,000 | 5% |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $5,000 | $6,350 | $8,450 | $8,488 | $12,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | $22,181 | $10,000 | 5% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 22 EACH | $450 | $360 | $465 | $437 | $550 | 5% |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 9,694 FT | $1.00 | $0.90 | $0.55 | $0.51 | $1.00 | 5% |
| 625E10490 LIGHT POLE, CONVENTIONAL :35' MOUNTING HEIGHT WITH | 3 EACH | $2,550 | $3,275 | $2,590 | $2,827 | $2,580 | 4% |
| 625E00450 CONNECTION, FUSED PULL APART | 64 EACH | $110 | $100 | $90.50 | $75.91 | $120 | 3% |
| 625E23410 NO. 12 AWG POLE AND BRACKET CABLE | 5,594 FT | $1.10 | $1.00 | $0.80 | $0.93 | $1.50 | 3% |
| 625E17951 BRACKET ARM, 6', AS PER PLAN | 5 EACH | $1,200 | $1,300 | $1,320 | $538 | $1,500 | 3% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 13 EACH | $425 | $350 | $455 | $418 | $535 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $9,600 | $11,950 | $5,465 | $9,500 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $1,200 | $900 | $1,045 | $1,226 | $1,750 | 2% |
| 659E10000 SEEDING AND MULCHING | 800 SY | $5.00 | $1.00 | $2.00 | $7.09 | $5.00 | 2% |
| 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN | 16 EACH | $250 | $200 | $340 | $507 | $500 | 2% |
| 625E32000 GROUND ROD | 15 EACH | $260 | $265 | $270 | $203 | $350 | 2% |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 22 EACH | $120 | $100 | $94.00 | $113 | $120 |
| 625E31510 PULL BOX REMOVED | 5 EACH | $225 | $200 | $340 | $549 | $600 |
| 625E39520 PULL BOX CLEANED | 5 EACH | $200 | $25.00 | $170 | $119 | $200 |
| 625E75506 LUMINAIRE REMOVED | 22 EACH | $45.00 | $25.00 | $85.00 | $126 | $30.00 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $900 | $450 | $1,020 | $2,537 | $2,000 |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 11 EACH | $320 | $200 | $510 | $629 | $500 |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 2,057 FT | $0.85 | $0.25 | $0.65 | $2.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $80.00 | $80.00 | $70.00 | $80.50 | $80.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,856 | $1,246 | $10,000 | $2,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $1,231 | $500 | $5,000 | $500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 27,843 FT | $1.7 | $47k | 21% |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 1,705 FT | $10 | $17k | 7% |
| 625E10490 LIGHT POLE, CONVENTIONAL :35' MOUNTING HEIGHT WITH | 7 EACH | $2,000 | $14k | 6% |
| 625E29002 TRENCH, 24" DEEP | 1,640 FT | $8 | $13k | 6% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04 :2" | 457 FT | $25 | $11k | 5% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,000 | $10k | 4% |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $5,000 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 22 EACH | $450 | $10k | 4% |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 9,694 FT | $1 | $10k | 4% |