STA-/SUM-SIGNS FY2021(Systematic)
STA County · est $1.0M
Bid dateThursday, October 1—
STA County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 41 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2Cleveland Barricading Systems LLC | R3Trafftech INC | R4M P Dory CO | % of bid |
|---|---|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 17,656 FT | $9.00 | $6.30 | $7.25 | $10.00 | 18% |
| 630E80100 SIGN, FLAT SHEET | 11,945.3 SF | $10.00 | $8.17 | $10.75 | $12.00 | 14% |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 2 EACH | $58,750 | $52,000 | $56,000 | $52,000 | 13% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 120 EACH | $545 | $250 | $475 |
| Item | Quantity | R1Lake Erie Construction Company | R2Cleveland Barricading Systems LLC | R3Trafftech INC | R4M P Dory CO |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $4,200 | $4,000 | $1,000 | $5,000 |
| 608E10000 4" CONCRETE WALK | 80 SF | $23.50 | $33.25 | $35.00 | $50.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E32000 GROUND ROD | 10 EACH | $275 | $445 | $195 | $350 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $500 |
| 7% |
| 630E72330 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10 | 3 EACH | $18,825 | $16,400 | $15,000 | $17,000 | 6% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 11 EACH | $4,950 | $6,800 | $5,200 | $7,500 | 6% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 3,467.8 SF | $15.00 | $15.75 | $18.00 | $17.00 | 6% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 423 EACH | $75.00 | $75.00 | $48.00 | $125 | 4% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $14,300 | $12,000 | $12,500 | $12,500 | 3% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,717 SF | $14.00 | $16.75 | $15.00 | $17.50 | 3% |
| 630E72331 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10, A | 1 EACH | $22,150 | $18,600 | $17,000 | $19,500 | 3% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 89 EACH | $235 | $395 | $50.00 | $200 | 2% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,065 EACH | $10.00 | $8.50 | $15.00 | $14.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $42,000 | $20,000 | $20,000 | 2% |
| 630E35501 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 6, AS | 1 EACH | $19,200 | $15,800 | $22,000 | $22,500 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $16,500 | $62,500 | $50,000 | $25,000 | 2% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,552 EACH | $10.00 | $14.20 | $32.00 | $15.00 | 2% |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 35 EACH | $295 | $178 | $185 | $375 | 1% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 14 EACH | $720 | $1,525 | $875 | $475 | 1% |
| 630E08600 SIGN POST REFLECTOR (RED) | 247 EACH | $35.00 | $23.00 | $20.00 | $35.00 | 1% |
| 698.5 FT |
| $8.00 |
| $6.55 |
| $6.00 |
| $9.50 |
| 630E02101 GROUND MOUNTED SUPPORT, NO. 2 POST, AS PER PLAN | 8.5 FT | $14.00 | $12.50 | $25.00 | $17.50 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 56 FT | $14.50 | $6.30 | $30.00 | $15.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN (C | 282 FT | $15.00 | $9.50 | $30.00 | $15.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, A | 28.8 FT | $15.00 | $6.70 | $30.00 | $15.00 |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 141 FT | $22.00 | $17.10 | $16.00 | $14.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 38 FT | $24.00 | $16.35 | $17.00 | $14.50 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 34 FT | $28.00 | $20.40 | $23.00 | $18.50 |
| 630E08600 SIGN POST REFLECTOR( YELLOW) | 87 EACH | $35.00 | $23.00 | $20.00 | $35.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 14 EACH | $265 | $234 | $375 | $225 |
| 630E72120 OVERHEAD SIGN SUPPORT, TYPE TC-9.11, DESIGN 3 | 1 EACH | $8,550 | $7,200 | $6,800 | $7,500 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 3 EACH | $225 | $175 | $285 | $350 |
| 630E79200 SIGN ATTACHMENT ASSEMBLY, MAST ARM | 6 EACH | $425 | $655 | $450 | $350 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 4 EACH | $265 | $48.00 | $175 | $125 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 18 SF | $12.00 | $9.60 | $25.00 | $15.00 |
| 630E80600 SIGN, DOUBLE FACED, MILE MARKER | 2 EACH | $185 | $32.50 | $25.00 | $35.00 |
| 630E82000 SIGN BACKING ASSEMBLY | 3 EACH | $120 | $69.00 | $85.00 | $150 |
| 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER | 38 EACH | $20.00 | $9.20 | $25.00 | $50.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 90 EACH | $10.00 | $18.20 | $75.00 | $50.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 17 EACH | $145 | $19.30 | $75.00 | $35.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 14 EACH | $265 | $385 | $300 | $100 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $245 | $272 | $250 | $400 |
| 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL | 4 EACH | $225 | $220 | $350 | $400 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 8 EACH | $395 | $980 | $200 | $400 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 429 EACH | $15.00 | $17.00 | $15.00 | $20.00 |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 2 EACH | $165 | $66.00 | $75.00 | $125 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $1,420 | $875 | $1,500 | $1,000 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $2,925 | $2,500 | $4,500 | $1,500 |
| 630E89803 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $2,120 | $2,500 | $4,500 | $1,000 |
| 630E89806 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $950 | $440 | $1,200 | $500 |
| 630E89808 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 2 EACH | $950 | $440 | $1,200 | $500 |
| 631E97700 SIGN LIGHTING MISC.: REMOVAL OF SIGN SERVICE | 1 EACH | $550 | $3,350 | $850 | $1,000 |
| 632E30201 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 85 FT | $7.00 | $42.00 | $8.50 | $20.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $100 | $60.00 | $75.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,150 | $5,500 | $9,000 | $7,500 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $1,800 | $1,200 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,810 | $17,200 | $1,500 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 17,656 FT | $9 | $159k | 16% |
| 630E80100 SIGN, FLAT SHEET | 11,945.3 SF | $10 | $119k | 12% |
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 2 EACH | $58,750 | $118k | 12% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 120 EACH | $545 | $65k | 7% |
| 630E72330 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 10 | 3 EACH | $18,825 | $56k | 6% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 11 EACH | $4,950 | $54k | 6% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 3,467.8 SF | $15 | $52k | 5% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 423 EACH | $75 | $32k | 3% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $14,300 | $29k | 3% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,717 SF | $14 | $24k | 2% |