ROS-CR 213A/VAR Guardrail FY 2021
ROS County · est $0.3M
Bid dateThursday, October 15—
ROS County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 16items by winning bid’s extended amount.
| Item | Quantity | R1Pdk Construction INC | R2Cuyahoga Fence LLC | R3M P Dory CO | R4Lake Erie Construction Company | % of bid |
|---|---|---|---|---|---|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 7,262.5 FT | $15.32 | $17.00 | $17.00 | $16.80 | 43% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,993.75 FT | $13.38 | $15.50 | $14.50 | $15.20 | 16% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 62 EACH | $600 | $750 | $700 | $725 | 15% |
| 209E70000 BORROW | 500 CY | $40.00 | $38.00 | $25.00 | $51.50 | 8% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 10,031.25 FT |
| $1.10 |
| $1.40 |
| $2.80 |
| $2.00 |
| 4% |
| 606E26101 ANCHOR ASSEMBLY, TYPE E, AS PER PLAN | 5 EACH | $2,000 | $2,000 | $2,050 | $2,170 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $5,500 | $5,000 | $10,000 | $3,285 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,700 | $2,500 | $1,000 | $2,450 | 2% |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 250 FT | $18.40 | $25.00 | $17.50 | $20.40 | 2% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 8 EACH | $525 | $650 | $700 | $825 | 2% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,900 | $3,500 | $1,850 | $1,600 | 1% |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 117 STA | $16.00 | $25.00 | $50.00 | $30.00 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 179 EACH | $6.50 | $7.25 | $8.00 | $7.50 | 0% |
| 606E20000 FLARED END SECTION | 15 EACH | $40.00 | $26.00 | $40.00 | $35.00 | 0% |
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $90.00 | $100 | $150 | $135 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 7,262.5 FT | $15.32 | $111k | 43% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,993.75 FT | $13.38 | $40k | 16% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 62 EACH | $600 | $37k | 15% |
| 209E70000 BORROW | 500 CY | $40 | $20k | 8% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 10,031.25 FT | $1.1 | $11k | 4% |
| 606E26101 ANCHOR ASSEMBLY, TYPE E, AS PER PLAN | 5 EACH | $2,000 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $5,500 | $6k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,700 | $5k | 2% |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 250 FT | $18.4 | $5k | 2% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 8 EACH | $525 | $4k | 2% |