D04-GR FY2021 (Systematic)
D04 County · est $0.9M
Bid dateThursday, December 17—
D04 County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 33,750 FT | $15.12 |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2Shook Company LLC | R3Cuyahoga Fence LLC | % of bid |
|---|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 33,750 FT | $15.12 | $16.50 | $15.75 | 61% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 41 EACH | $2,200 | $2,150 | $1,875 | 11% |
| 202E38000 GUARDRAIL REMOVED | 36,550 FT | $1.60 | $1.00 | $1.40 | 7% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 44 EACH | $875 | $1,000 | $875 | 5% |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (50 MPH/ | 1 EACH | $26,720 | $25,000 |
| Item | Quantity | R1Lake Erie Construction Company | R2Shook Company LLC | R3Cuyahoga Fence LLC |
|---|---|---|---|---|
| 626E00110 BARRIER REFLECTOR, TYPE 2, 2-WAY | 71 EACH | $7.00 | $6.00 | $7.00 |
| 614E11000 MAINTAINING TRAFFIC (I-480) | 1 LS | $350 | $1,000 | $2,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $26,000 |
| 3% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $4,250 | $4,100 | $4,500 | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 10 EACH | $1,850 | $2,000 | $2,100 | 2% |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 600 FT | $25.60 | $23.00 | $18.50 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $37.00 | $50.00 | $75.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC (SR 21) | 1 LS | $8,500 | $7,500 | $2,500 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $8,230 | $3,500 | $35,000 | 1% |
| 606E50000 SPECIAL - RESHAPING BERM | 36,550 FT | $0.16 | $0.10 | $0.10 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,600 | $7,922 | $8,500 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 416 EACH | $7.50 | $6.00 | $7.00 | 0% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | 0% |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN | 825 FT | $2.40 | $1.25 | $1.60 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,400 | $1,000 | $500 | 0% |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $400 | $300 | $400 | 0% |
| 614E11000 MAINTAINING TRAFFIC (I-77) | 1 LS | $900 | $1,000 | $2,500 | 0% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 1 EACH | $875 | $650 | $650 | 0% |
| $510k |
| 61% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 41 EACH | $2,200 | $90k | 11% |
| 202E38000 GUARDRAIL REMOVED | 36,550 FT | $1.6 | $58k | 7% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 44 EACH | $875 | $39k | 5% |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL) (50 MPH/ | 1 EACH | $26,720 | $27k | 3% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 6 EACH | $4,250 | $26k | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 10 EACH | $1,850 | $19k | 2% |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 600 FT | $25.6 | $15k | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 250 HOUR | $37 | $9k | 1% |
| 614E11000 MAINTAINING TRAFFIC (SR 21) | 1 LS | $8,500 | $9k | 1% |