| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Litman Excavating INC | R3Craig Edward Susany INC | R4Shelly & Sands INC | R5R C Construction Company And Son | R6INC Swank Construction Company LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,530 FT | $22.75 | $30.86 | $28.00 | $25.50 | $55.00 | $35.00 | 17% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 498 FT | $56.50 | $65.00 | $72.00 | $100 | $125 | $180 | 13% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 718 FT | $33.00 | $21.00 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Litman Excavating INC | R3Craig Edward Susany INC | R4Shelly & Sands INC | R5R C Construction Company And Son | R6INC Swank Construction Company LLC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $2,000 | $4,000 | $8,125 | $2,500 | $20,000 |
| 202E23000 PAVEMENT REMOVED | 351 SY | $7.00 | $18.00 | $10.00 | $15.00 | $20.00 | $30.00 |
| 202E32000 CURB REMOVED | 244 FT | $2.50 | $10.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $72.00 |
| $55.00 |
| $125 |
| $70.00 |
| 11% |
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 80 EACH | $220 | $175 | $90.00 | $225 | $425 | $575 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $12,350 | $10,000 | $10,000 | $10,000 | $25,000 | $30,000 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $208 | $300 | $300 | $265 | $375 | $255 | 6% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 314 FT | $34.25 | $35.00 | $105 | $113 | $100 | $110 | 5% |
| 304E20000 AGGREGATE BASE | 89 CY | $99.00 | $60.00 | $110 | $90.00 | $100 | $135 | 4% |
| 609E26000 CURB, TYPE 6 | 244 FT | $30.00 | $55.00 | $30.00 | $35.00 | $25.00 | $45.00 | 3% |
| 203E20000 EMBANKMENT | 64 CY | $110 | $20.00 | $25.00 | $45.00 | $20.00 | $50.00 | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 250 FT | $28.00 | $29.00 | $30.00 | $27.50 | $45.00 | $33.00 | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $6,600 | $18,500 | $20,000 | $12,500 | $45,000 | $45,000 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 41 CY | $146 | $80.00 | $84.00 | $125 | $225 | $175 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 29 CY | $155 | $300 | $420 | $145 | $25.00 | $400 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $4,200 | $3,278 | $5,000 | $5,000 | $12,500 | $1,800 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (17 CY | $245 | $633 | $400 | $350 | $450 | $335 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 8 CY | $500 | $400 | $300 | $535 | $450 | $2,000 | 2% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 70 CY | $55.00 | $50.00 | $10.00 | $25.00 | $30.00 | $30.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 13 CY | $275 | $748 | $440 | $478 | $450 | $430 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,562 | $6,100 | $12,000 | $2,624 | $15,000 | $1,000 | 2% |
| $5.00 |
| $20.00 |
| $12.00 |
| 202E38000 GUARDRAIL REMOVED | 250 FT | $6.00 | $5.75 | $2.00 | $2.00 | $5.00 | $24.00 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $1,450 | $2,500 | $100 | $2,500 | $12,000 | $10,000 |
| 204E10000 SUBGRADE COMPACTION | 365 SY | $1.40 | $4.75 | $3.00 | $7.00 | $2.00 | $6.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 272 SY | $4.00 | $10.00 | $5.00 | $8.75 | $10.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 271 FT | $4.00 | $5.50 | $7.00 | $5.00 | $40.00 | $10.00 |
| 407E10000 TACK COAT | 58 GAL | $5.00 | $2.50 | $4.00 | $2.00 | $10.00 | $3.25 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $11.00 | $46.00 | $8.00 | $10.00 | $25.00 | $13.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $19,900 | $13,743 | $21,000 | $18,400 | $25,000 | $30,000 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 2 SNMT | $1,600 | $1,725 | $1,000 | $1,000 | $2,500 | $4,000 |
| 616E10000 WATER | 10 MGAL | $10.00 | $20.00 | $1.00 | $20.00 | $1.00 | $30.00 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $108 | $145 | $180 | $135 | $25.00 | $150 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 142 FT | $5.00 | $18.00 | $5.00 | $7.00 | $25.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 10 FT | $16.00 | $10.00 | $5.00 | $25.00 | $25.00 | $30.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $230 | $300 | $125 | $250 | $275 | $800 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $850 | $7,500 | $5,000 | $6,500 | $12,500 | $25,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,530 FT | $22.75 | $35k | 15% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 498 FT | $56.5 | $28k | 12% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 718 FT | $33 | $24k | 10% |
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 80 EACH | $220 | $18k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $12,350 | $12k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 59 CY | $208 | $12k | 5% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 314 FT | $34.25 | $11k | 5% |
| 304E20000 AGGREGATE BASE | 89 CY | $99 | $9k | 4% |
| 609E26000 CURB, TYPE 6 | 244 FT | $30 | $7k | 3% |
| 203E20000 EMBANKMENT | 64 CY | $110 | $7k | 3% |