| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 657 FT | $87.00 | $72.00 | $95.00 | $110 | 15% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X104 | 1,142 FT | $50.00 | $67.00 | $50.00 | $55.00 | 15% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 643 FT | $79.00 | $63.00 | $71.00 | $90.00 | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 101 CY | $285 | $317 | $300 | $450 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 123 CY | $225 | $251 | $240 | $325 | 7% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 230 FT | $107 | $89.00 |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4R C Construction Company And Son INC |
|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 461 SY | $9.00 | $18.00 | $15.00 | $20.00 |
| 202E38001 GUARDRAIL REMOVED, AS PER PLAN | 550 FT | $2.00 | $2.50 | $9.00 | $5.00 |
| 203E20000 EMBANKMENT | 146 CY | $10.00 | $32.50 | $15.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 524 SY | $5.00 | $5.00 | $3.00 | $2.00 |
| 606E26150 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $150 |
| $125 |
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $35,500 | $39,500 | $25,000 | 5% |
| 530E00400 SPECIAL - STRUCTURES- PRECAST CONCRETE PANEL | 55 EACH | $315 | $555 | $330 | $425 | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 86 CY | $175 | $102 | $87.00 | $225 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 470 FT | $23.00 | $26.20 | $21.00 | $20.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $16,200 | $32,000 | $15,000 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 152 SY | $65.00 | $62.00 | $83.00 | $125 | 3% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 500 FT | $19.20 | $21.40 | $21.00 | $25.00 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $9,500 | $2,750 | $10,800 | $10,000 | 2% |
| 601E27000 DUMPED ROCK FILL, TYPE C | 70 CY | $100 | $85.00 | $85.00 | $85.00 | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $7,000 | $2,800 | $14,800 | $10,000 | 2% |
| 203E10000 EXCAVATION | 231 CY | $30.00 | $18.00 | $20.00 | $20.00 | 2% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 17 CY | $400 | $461 | $525 | $450 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,500 | $5,325 | $2,900 | $4,500 | 2% |
| 304E20000 AGGREGATE BASE | 86 CY | $65.00 | $137 | $120 | $85.00 | 1% |
| 1 EACH |
| $2,325 |
| $2,575 |
| $2,500 |
| $2,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $985 | $1,100 | $1,100 | $1,800 |
| 659E10000 SEEDING AND MULCHING | 782 SY | $3.25 | $5.00 | $3.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $605 | $700 | $680 | $1,200 |
| 659E31000 LIME | 0.16 ACRE | $75.00 | $100 | $170 | $800 |
| 659E35000 WATER | 5 MGAL | $1.00 | $2.00 | $2.00 | $1.00 |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 24 FT | $40.00 | $23.00 | $66.00 | $10.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 7 FT | $30.00 | $33.00 | $66.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $171 | $390 | $275 |
| 407E20000 NON-TRACKING TACK COAT | 176 GAL | $3.00 | $3.50 | $5.00 | $10.00 |
| 408E10000 PRIME COAT | 78 GAL | $25.00 | $9.00 | $2.00 | $20.00 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $110 | $165 | $170 | $85.00 |
| 621E00100 RPM | 12 EACH | $225 | $250 | $240 | $750 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $20.00 | $13.00 | $79.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 12 EACH | $7.50 | $9.00 | $8.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.22 MILE | $3,500 | $3,900 | $3,700 | $6,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.11 MILE | $6,650 | $7,400 | $7,000 | $6,800 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,720 | $2,950 | $2,900 | $2,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 10 EACH | $10.00 | $31.00 | $30.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $15.00 | $33.00 | $34.00 | $20.00 |
| 616E10000 WATER | 1 MGAL | $20.00 | $11.00 | $110 | $1.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 261 FT | $3.50 | $7.00 | $11.00 | $20.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 2 FT | $750 | $111 | $310 | $20.00 |
| 530E00200 SPECIAL - STRUCTURES - PRECONSTRUCTION CONDITION S | 1 LS | $500 | $3,125 | $4,000 | $12,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,625 | $6,690 | $4,500 | $18,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $1,600 | $4,800 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 657 FT | $87 | $57k | 13% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X104 | 1,142 FT | $50 | $57k | 13% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 643 FT | $79 | $51k | 12% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 101 CY | $285 | $29k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 123 CY | $225 | $28k | 6% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 230 FT | $107 | $25k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $18,000 | $18k | 4% |
| 530E00400 SPECIAL - STRUCTURES- PRECAST CONCRETE PANEL | 55 EACH | $315 | $17k | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 86 CY | $175 | $15k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 470 FT | $23 | $11k | 2% |