ATH-SR 329-07.32
ATH County · est $0.5M
Bid dateThursday, March 26—
ATH County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3R C Construction Company And Son | R4INC D G M INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X162 | 1,562 FT | $81.00 | $82.00 | $60.00 | $122 | 25% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 839 FT | $85.00 | $115 | $150 | $115 | 14% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 807 FT | $82.00 | $83.00 | $90.00 | $110 | 13% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $100 | $130 | $150 | $141 | 10% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $30,000 | $5,300 | $10,000 | $2,000 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 59 CY | $425 | $330 | $450 |
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3R C Construction Company And Son | R4INC D G M INC |
|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 109 SY | $15.00 | $9.00 | $20.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 32 FT | $8.00 | $5.00 | $5.00 | $1.00 |
| 203E10000 EXCAVATION | 56 CY | $14.00 | $51.00 | $20.00 | $30.00 |
| 203E20000 EMBANKMENT | 85 CY | $20.00 | $22.00 | $20.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $340 |
| 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $30,000 | $10,000 | $8,000 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $35,000 | $25,000 | $51,250 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 102 CY | $140 | $110 | $185 | $85.00 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $550 | $380 | $375 | $500 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $11,500 | $7,200 | $10,000 | $1,000 | 2% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL 2 | 31 EACH | $325 | $320 | $425 | $550 | 2% |
| 530E00400 SPECIAL - STRUCTURES - PRECAST CONCRETE PANEL 1 | 22 EACH | $425 | $410 | $425 | $685 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 400 FT | $23.00 | $31.00 | $25.00 | $24.00 | 2% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 127 SY | $70.00 | $140 | $175 | $85.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,670 | $920 | $2,500 | $11,000 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 275 FT | $25.00 | $23.00 | $38.00 | $23.00 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,500 | $5,000 | $10,000 | $3,000 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,200 | $2,000 | $2,500 | $2,000 | 1% |
| 154 SY |
| $6.00 |
| $4.00 |
| $2.00 |
| $8.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 1 EACH | $2,350 | $2,600 | $2,800 | $3,200 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 2 SY | $100 | $220 | $1,000 | $150 |
| 601E27000 DUMPED ROCK FILL, TYPE C | 18 CY | $125 | $74.00 | $85.00 | $120 |
| 659E10000 SEEDING AND MULCHING | 510 SY | $5.00 | $4.00 | $5.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $600 | $2,100 | $1,200 | $650 |
| 659E31000 LIME | 0.11 ACRE | $75.00 | $770 | $800 | $80.00 |
| 659E35000 WATER | 3 MGAL | $1.00 | $11.00 | $1.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $30.00 | $38.00 | $10.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 6 FT | $40.00 | $42.00 | $25.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $360 | $275 | $200 |
| 304E20000 AGGREGATE BASE | 26 CY | $85.00 | $130 | $85.00 | $100 |
| 407E20000 NON-TRACKING TACK COAT | 113 GAL | $3.00 | $4.00 | $10.00 | $5.00 |
| 408E10000 PRIME COAT | 80 GAL | $25.00 | $32.00 | $20.00 | $15.00 |
| 617E10100 COMPACTED AGGREGATE | 5 CY | $130 | $150 | $85.00 | $150 |
| 621E00100 RPM | 14 EACH | $200 | $250 | $275 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $8.00 | $58.00 | $50.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 7 EACH | $8.50 | $9.00 | $25.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.2 MILE | $3,850 | $11,300 | $12,500 | $4,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.1 MILE | $7,250 | $11,500 | $12,500 | $7,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 9 EACH | $11.00 | $12.00 | $25.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 9 EACH | $15.00 | $16.00 | $25.00 | $20.00 |
| 616E10000 WATER | 1 MGAL | $20.00 | $11.00 | $1.00 | $1.00 |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 10 CY | $400 | $500 | $450 | $800 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 148 FT | $5.00 | $11.00 | $25.00 | $15.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 5 FT | $300 | $100 | $25.00 | $110 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,900 | $4,000 | $17,000 | $15,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X162 | 1,562 FT | $81 | $127k | 23% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 839 FT | $85 | $71k | 13% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 36" DIAMETER, UN | 807 FT | $82 | $66k | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $100 | $52k | 10% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $30,000 | $30k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 59 CY | $425 | $25k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,000 | $15k | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 102 CY | $140 | $14k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 22 CY | $550 | $12k | 2% |