JEF-TR 62-02.87 -ODNR Brush Creek
JEF County · est $0.2M
Bid dateThursday, April 9—
JEF County · est $0.2M
Bid form · ODOT
| Item |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 14items by winning bid’s extended amount.
| Item | Quantity | R1Dennison Bridge INC | R2Alan Stone CO INC | R3Craig Edward Susany INC | R4Ohio-west Virginia Excavating CO | R5Shelly & Sands INC | R6Lockhart Concrete CO | R7R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,360 FT | $29.00 | $24.00 | $25.00 | $40.00 | $30.00 | $21.75 | $65.00 | 26% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 723 FT | $50.00 | $42.00 | $70.00 | $57.00 | $65.00 | $107 | $125 | 24% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 533 FT |
| $60.00 |
| $53.00 |
| $70.00 |
| $67.00 |
| $65.00 |
| $135 |
| $125 |
| 21% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER, UN | 400 FT | $50.00 | $69.00 | $70.00 | $63.00 | $70.00 | $107 | $100 | 13% |
| 304E20000 AGGREGATE BASE | 40 CY | $130 | $110 | $100 | $225 | $100 | $60.00 | $150 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $26,500 | $4,000 | $4,000 | $10,000 | $22,000 | $25,000 | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $3,000 | $2,900 | $5,000 | $5,200 | $3,750 | $34,900 | $20,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3,200 | $5,000 | $1,200 | $6,300 | $10,000 | $12,500 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,200 | $10,000 | $3,200 | $2,050 | $14,500 | $10,000 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 143 SY | $8.00 | $16.00 | $9.00 | $15.00 | $18.00 | $3.00 | $20.00 | 1% |
| 203E10000 EXCAVATION | 40 CY | $25.00 | $24.00 | $50.00 | $45.00 | $45.00 | $30.00 | $25.00 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 240 SY | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 | $3.00 | $2.00 | 0% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $6,000 | $2,000 | $4,000 | $16,050 | $1,000 | $2,500 | 0% |
| Qty |
|---|
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,360 FT | $29 | $39k | 26% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 723 FT | $50 | $36k | 24% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 533 FT | $60 | $32k | 21% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER, UN | 400 FT | $50 | $20k | 13% |
| 304E20000 AGGREGATE BASE | 40 CY | $130 | $5k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $5k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $3,000 | $3k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $3k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $2k | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 143 SY | $8 | $1k | 1% |