| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Dennison Bridge INC | R5Craig Edward Susany INC | R6R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,000 | $36,000 | $40,535 | $40,000 | $55,000 | $35,000 | 15% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,140 FT | $30.00 | $23.00 | $25.00 | $28.00 | $26.00 | $40.00 | 14% |
| 511E81300 CONCRETE, MISC.: 8"X24"X57" PRECAST CONCRETE LAGGI | 114 EACH | $215 | $200 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Dennison Bridge INC | R5Craig Edward Susany INC | R6R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,800 | $3,670 | $2,700 | $100 | $100 | $12,500 |
| 202E38000 GUARDRAIL REMOVED | 250 FT | $4.00 | $3.00 | $3.50 | $2.00 | $3.00 | $5.00 |
| 203E98300 ROADWAY, MISC.: CHANNEL SHAPING | 250 FT | $5.00 | $6.50 | $9.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $250 |
| $180 |
| $250 |
| $250 |
| 10% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 380 FT | $55.00 | $49.00 | $78.00 | $70.00 | $100 | $150 | 8% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 608 FT | $30.00 | $36.00 | $53.00 | $55.00 | $60.00 | $150 | 7% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 30 CY | $500 | $350 | $425 | $400 | $400 | $450 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 398 CY | $37.00 | $26.00 | $17.00 | $35.00 | $36.00 | $100 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 56 CY | $215 | $280 | $316 | $300 | $330 | $375 | 5% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 124 SY | $85.00 | $180 | $160 | $200 | $180 | $175 | 4% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 250 FT | $40.00 | $34.00 | $38.00 | $36.00 | $44.00 | $45.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $26,900 | $10,000 | $13,500 | $10,000 | $15,000 | 4% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 72 CY | $110 | $310 | $170 | $125 | $110 | $200 | 3% |
| 304E20000 AGGREGATE BASE | 69 CY | $110 | $91.00 | $95.00 | $120 | $110 | $175 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,200 | $4,500 | $2,702 | $5,000 | $10,500 | $18,000 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (14 CY | $275 | $400 | $344 | $400 | $500 | $525 | 2% |
| 202E23000 PAVEMENT REMOVED | 289 SY | $12.50 | $16.00 | $10.00 | $18.00 | $10.00 | $20.00 | 1% |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 2 CY | $1,800 | $1,840 | $4,250 | $1,250 | $10,000 | $2,500 | 1% |
| 203E20000 EMBANKMENT | 120 CY | $28.00 | $14.00 | $20.00 | $25.00 | $36.00 | $50.00 | 1% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 10 CY | $325 | $530 | $496 | $600 | $600 | $525 | 1% |
| 621E00100 RPM | 7 EACH | $400 | $400 | $375 | $50.00 | $400 | $650 | 1% |
| $20.00 |
| $9.00 |
| $50.00 |
| 204E10000 SUBGRADE COMPACTION | 316 SY | $5.00 | $2.50 | $5.00 | $3.00 | $4.00 | $2.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 250 SY | $10.00 | $6.00 | $6.10 | $8.00 | $6.00 | $25.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $200 | $320 | $250 | $300 | $125 | $275 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 520 FT | $3.00 | $4.00 | $2.50 | $4.00 | $4.00 | $30.00 |
| 407E10000 TACK COAT | 47 GAL | $7.00 | $4.00 | $2.00 | $4.00 | $4.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 33 GAL | $8.00 | $69.00 | $20.00 | $25.00 | $65.00 | $20.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $20.00 | $26.00 | $5.00 | $5.00 | $10.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $10.00 | $8.00 | $10.00 | $10.00 | $10.00 | $20.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 14 FT | $17.00 | $27.00 | $15.00 | $30.00 | $20.00 | $30.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $52.00 | $48.00 | $50.00 | $50.00 | $50.00 | $150 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $52.00 | $79.00 | $50.00 | $80.00 | $100 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1 EACH | $25.00 | $16.00 | $25.00 | $20.00 | $10.00 | $50.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.1 MILE | $6,000 | $6,040 | $5,750 | $6,000 | $20,000 | $12,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.05 MILE | $11,000 | $11,600 | $10,975 | $12,000 | $40,000 | $21,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.05 MILE | $8,500 | $8,610 | $8,200 | $6,000 | $40,000 | $21,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.1 MILE | $4,500 | $4,410 | $4,200 | $3,000 | $20,000 | $12,500 |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 12 FT | $165 | $45.00 | $190 | $80.00 | $26.00 | $40.00 |
| 507E00400 STEEL PILES, MISC.: STEEL PILES W18X76, FURNISHED | 60 FT | $41.00 | $42.00 | $45.00 | $40.00 | $41.00 | $65.00 |
| 511E81300 CONCRETE, MISC.: 8"X24"X45" PRECAST CONCRETE LAGGI | 3 EACH | $125 | $260 | $250 | $150 | $250 | $250 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 200 FT | $5.00 | $7.50 | $5.00 | $10.00 | $10.00 | $20.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 10 FT | $5.00 | $23.00 | $25.00 | $20.00 | $10.00 | $20.00 |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 32 FT | $70.00 | $48.00 | $132 | $100 | $102 | $160 |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 20 FT | $125 | $77.00 | $112 | $130 | $551 | $160 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $2,940 | $4,200 | $3,000 | $5,000 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,000 | $37k | 13% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,140 FT | $30 | $34k | 12% |
| 511E81300 CONCRETE, MISC.: 8"X24"X57" PRECAST CONCRETE LAGGI | 114 EACH | $215 | $25k | 9% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 380 FT | $55 | $21k | 8% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 608 FT | $30 | $18k | 7% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 30 CY | $500 | $15k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 398 CY | $37 | $15k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 56 CY | $215 | $12k | 4% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 124 SY | $85 | $11k | 4% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 250 FT | $40 | $10k | 4% |