ATH-SR 144-01.99
ATH County · est $0.5M
Bid dateThursday, June 18—
ATH County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2R C Construction Company And Son INC | R3Shelly & Sands INC | R4Alan Stone CO INC | R5Allard Excavation LLC | R6George J Igel & CO INC | R7Litman Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 530E00400 SPECIAL - STRUCTURES PRE-CAST CONCRETE PANEL NO. 1 | 255 EACH | $270 | $155 | $325 | $239 | $282 | $265 | $325 | 18% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X89 | 1,456 FT | $38.00 | $45.00 | $43.00 | $43.00 | $43.02 | $45.00 | $50.00 | 15% |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2R C Construction Company And Son INC | R3Shelly & Sands INC | R4Alan Stone CO INC | R5Allard Excavation LLC | R6George J Igel & CO INC | R7Litman Excavating INC |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $650 | $2,500 | $5,500 | $4,000 | $4,200 | $2,500 | $12,000 |
| 202E38000 GUARDRAIL REMOVED | 350 FT | $6.00 | $2.00 | $2.80 | $3.00 | $3.86 | $5.00 | $5.00 |
| 202E98100 REMOVAL MISC.: PILE EXTRACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE |
| 824 FT |
| $59.00 |
| $100 |
| $97.00 |
| $88.00 |
| $96.00 |
| $95.00 |
| $90.00 |
| 13% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $77.00 | $110 | $125 | $110 | $118 | $165 | $120 | 11% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $36,700 | $20,000 | $33,706 | $43,000 | $51,000 | $48,000 | $4,025 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $25,295 | $10,000 | $10,000 | $25,000 | $42,323 | $20,000 | $20,000 | 7% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 183 CY | $91.00 | $100 | $100 | $199 | $88.25 | $85.00 | $90.00 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 74 CY | $217 | $425 | $285 | $340 | $285 | $295 | $275 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 57 CY | $206 | $250 | $235 | $280 | $235 | $245 | $480 | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 134 SY | $86.50 | $100 | $85.00 | $73.50 | $66.95 | $69.00 | $150 | 3% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 16 CY | $497 | $300 | $400 | $370 | $419 | $550 | $575 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 350 FT | $21.16 | $36.00 | $24.50 | $26.00 | $20.10 | $21.30 | $20.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,730 | $14,000 | $3,305 | $3,400 | $5,700 | $4,500 | $12,000 | 2% |
| 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL) | 2 EACH | $2,765 | $1,500 | $2,150 | $2,700 | $1,900 | $2,100 | $3,000 | 1% |
| 304E20000 AGGREGATE BASE | 60 CY | $74.30 | $75.00 | $85.00 | $90.50 | $92.50 | $90.00 | $80.00 | 1% |
| 203E10000 EXCAVATION | 198 CY | $19.00 | $20.00 | $20.00 | $16.00 | $17.10 | $50.00 | $36.00 | 1% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $3,650 | $8,500 | $13,000 | $5,800 | $15,000 | $10,000 | $25,000 | 1% |
| 621E00100 RPM | 16 EACH | $210 | $400 | $200 | $238 | $200 | $210 | $225 | 1% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $3,100 | $4,000 | $11,000 | $6,200 | $2,645 | $12,000 | $10,000 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 36 EACH |
| $38.50 |
| $500 |
| $200 |
| $212 |
| $366 |
| $85.00 |
| $1,000 |
| 203E20000 EMBANKMENT | 116 CY | $25.50 | $20.00 | $15.00 | $15.50 | $17.10 | $22.50 | $26.00 |
| 204E10000 SUBGRADE COMPACTION | 376 SY | $1.50 | $2.00 | $5.00 | $3.50 | $3.25 | $4.50 | $5.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 915 SY | $3.00 | $5.00 | $2.85 | $2.50 | $2.15 | $3.00 | $6.00 |
| 605E31100 AGGREGATE DRAINS | 130 FT | $21.50 | $10.00 | $15.00 | $24.50 | $16.90 | $22.00 | $20.00 |
| 407E20000 NON-TRACKING TACK COAT | 20 GAL | $2.20 | $10.00 | $4.00 | $95.50 | $4.00 | $4.00 | $5.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 16 EACH | $53.00 | $50.00 | $12.00 | $34.50 | $9.00 | $12.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 BIDIRECTIONAL | 6 EACH | $11.00 | $20.00 | $8.50 | $9.00 | $10.00 | $10.50 | $28.60 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $3,200 | $9,500 | $2,950 | $3,600 | $2,950 | $3,100 | $3,245 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $5,600 | $9,500 | $5,290 | $6,300 | $5,290 | $5,600 | $5,820 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 291 FT | $9.00 | $10.00 | $3.50 | $8.00 | $6.50 | $3.00 | $9.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 10 FT | $37.90 | $10.00 | $20.00 | $28.00 | $82.80 | $20.00 | $11.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $160 | $275 | $325 | $316 | $250 | $270 | $600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $850 | $10,000 | $4,500 | $5,400 | $7,500 | $8,000 | $8,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 530E00400 SPECIAL - STRUCTURES PRE-CAST CONCRETE PANEL NO. 1 | 255 EACH | $270 | $69k | 17% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES HP14X89 | 1,456 FT | $38 | $55k | 14% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 824 FT | $59 | $49k | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $77 | $40k | 10% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $36,700 | $37k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $25,295 | $25k | 6% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 183 CY | $91 | $17k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 74 CY | $217 | $16k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 57 CY | $206 | $12k | 3% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 134 SY | $86.5 | $12k | 3% |