VIN-SR 93-06.67
VIN County · est $0.4M
Bid dateThursday, July 2—
VIN County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 19 more items below.
| Item | Quantity | R1R C Construction Company And Son | R2INC Alan Stone CO INC | R3D G M INC | R4George J Igel & CO INC | R5Ohio-west Virginia Excavating CO | R6Becdir Construction Company | R7Righter Company INC | R8Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 4,470 SF | $27.00 | $38.70 | $45.55 | $43.50 | $43.50 | $46.00 | $57.00 | $87.25 | 49% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 67 CY | $375 | $341 | $290 | $355 | $375 |
| Item | Quantity | R1R C Construction Company And Son | R2INC Alan Stone CO INC | R3D G M INC | R4George J Igel & CO INC | R5Ohio-west Virginia Excavating CO | R6Becdir Construction Company | R7Righter Company INC | R8Shelly & Sands INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 162.5 FT | $5.00 | $4.00 | $1.00 | $4.25 | $4.00 | $3.75 | $3.00 | $3.50 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $500 | $318 | $250 | $650 | $400 | $370 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $290 |
| $299 |
| $350 |
| 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $16,500 | $21,000 | $25,000 | $36,500 | $37,500 | $63,700 | $12,000 | 8% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $1,700 | $3,000 | $3,350 | $6,500 | $7,000 | $8,500 | $3,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $15,000 | $10,000 | $10,500 | $10,000 | $10,000 | $10,000 | $20,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 28 CY | $295 | $293 | $420 | $580 | $500 | $420 | $375 | $475 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $3,500 | $2,000 | $6,000 | $2,000 | $2,500 | $5,000 | $5,000 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 310 FT | $20.00 | $25.00 | $22.00 | $28.00 | $23.00 | $31.50 | $25.00 | $32.00 | 3% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $5,500 | $8,700 | $2,000 | $5,480 | $3,400 | $6,000 | $10,000 | $20,000 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $30.00 | $29.50 | $24.00 | $22.95 | $23.00 | $23.00 | $38.00 | $22.00 | 2% |
| 621E00100 RPM | 6 EACH | $650 | $260 | $550 | $595 | $600 | $580 | $550 | $550 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $1,500 | $3,200 | $1,900 | $2,125 | $3,000 | $2,000 | $2,250 | $2,500 | 1% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 118 SY | $25.00 | $25.50 | $15.00 | $30.00 | $35.00 | $59.00 | $20.00 | $45.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,500 | $2,200 | $16,000 | $1,500 | $2,500 | $1,500 | $3,000 | $3,000 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, (NCHRP 350/MASH 2016) | 1 EACH | $2,300 | $3,300 | $3,200 | $3,200 | $3,200 | $3,100 | $2,350 | $2,900 | 1% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 23 CY | $100 | $193 | $100 | $80.00 | $125 | $98.00 | $150 | $150 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.16 MILE | $12,500 | $4,400 | $6,000 | $5,750 | $5,500 | $5,500 | $5,250 | $5,250 | 1% |
| 304E20000 AGGREGATE BASE | 23 CY | $75.00 | $143 | $150 | $110 | $115 | $160 | $125 | $145 | 1% |
| 202E98500 REMOVAL MISC.: ROCK CHANNEL PROTECTION REMOVED | 49 CY | $30.00 | $6.00 | $25.00 | $38.50 | $50.00 | $62.00 | $40.00 | $50.00 | 1% |
| $500 |
| $350 |
| 203E10000 EXCAVATION | 49 CY | $20.00 | $14.50 | $25.00 | $27.00 | $55.00 | $26.00 | $50.00 | $40.00 |
| 203E20000 EMBANKMENT | 62 CY | $20.00 | $6.50 | $25.00 | $27.00 | $45.00 | $55.00 | $50.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 140 SY | $2.00 | $4.00 | $10.00 | $7.00 | $3.50 | $3.00 | $4.00 | $6.00 |
| 659E10000 SEEDING AND MULCHING | 122 SY | $10.00 | $12.00 | $12.00 | $33.25 | $22.00 | $12.00 | $10.00 | $16.60 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $1,200 | $941 | $680 | $650 | $600 | $1,000 | $750 | $551 |
| 659E31000 LIME | 0.03 ACRE | $800 | $1,100 | $100 | $80.00 | $600 | $400 | $500 | $129 |
| 659E35000 WATER | 1 MGAL | $1.00 | $502 | $1.00 | $1.00 | $10.00 | $10.00 | $10.00 | $1.00 |
| 605E31100 AGGREGATE DRAINS | 21 FT | $10.00 | $79.00 | $20.00 | $38.00 | $30.00 | $27.00 | $50.00 | $35.00 |
| 407E20000 NON-TRACKING TACK COAT | 128 GAL | $10.00 | $6.50 | $4.00 | $4.00 | $3.00 | $4.25 | $14.00 | $3.00 |
| 408E10000 PRIME COAT | 64 GAL | $20.00 | $37.00 | $5.00 | $12.50 | $7.00 | $5.25 | $25.00 | $7.00 |
| 617E10100 COMPACTED AGGREGATE | 4 CY | $100 | $488 | $150 | $250 | $150 | $350 | $300 | $145 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $50.00 | $39.50 | $1.00 | $15.00 | $23.00 | $42.00 | $10.00 | $32.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $20.00 | $2.00 | $14.00 | $15.00 | $15.00 | $15.00 | $10.00 | $14.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.08 MILE | $18,000 | $7,800 | $11,000 | $11,000 | $10,000 | $10,500 | $9,975 | $9,975 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 7 EACH | $10.00 | $15.00 | $20.00 | $8.75 | $46.00 | $11.50 | $44.00 | $17.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 7 EACH | $25.00 | $51.50 | $20.00 | $16.00 | $45.00 | $16.00 | $46.00 | $24.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $13.50 | $1.00 | $105 | $10.00 | $10.00 | $10.00 | $60.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 504E11101 STEEL SHEET PILING LEFT IN PLACE, AS PER PLAN | 4,470 SF | $27 | $121k | 47% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 67 CY | $375 | $25k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 8% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 28 CY | $295 | $8k | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $7k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 310 FT | $20 | $6k | 2% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $5,500 | $6k | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 2% |