WAS-SR 60-08.60
WAS County · est $3.6M
Bid dateThursday, July 2—
WAS County · est $3.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 21 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Shelly & Sands INC | R5Beaver Excavating Company | R6J D Williamson Construction CO INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X250 | 10,722 FT | $149 | $134 | $150 | $125 | $155 | $160 | 42% |
| 530E00400 SPECIAL - STRUCTURES CONCRETE LAGGING NO. 1 | 2,692 EACH | $240 | $220 | $265 | $400 | $255 | $310 | 17% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 5,130 FT | $95.00 | $118 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2George J Igel & CO INC | R3Alan Stone CO INC | R4Shelly & Sands INC | R5Beaver Excavating Company | R6J D Williamson Construction CO INC |
|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 4 EACH | $250 | $135 | $356 | $200 | $300 | $1,600 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 3 FT | $88.00 | $163 | $59.50 | $45.00 | $150 | $12.00 |
| 659E10000 SEEDING AND MULCHING | 9,163 SY | $0.75 | $0.75 | $1.50 | $0.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $114 |
| $114 |
| $135 |
| $105 |
| 13% |
| 610E50010 RETAINING WALL, MISC.: TIMBER LAGGING | 31,522 SF | $7.00 | $6.00 | $6.00 | $7.50 | $10.00 | $7.00 | 6% |
| 203E10000 EXCAVATION | 10,257 CY | $18.25 | $27.50 | $35.00 | $13.00 | $23.50 | $55.00 | 5% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1,913 CY | $92.00 | $90.00 | $92.00 | $155 | $117 | $90.00 | 5% |
| 524E95000 DRILLED SHAFTS, MISC.:36" DIAMETER DRILLING THROUG | 1,564 FT | $84.00 | $47.25 | $88.50 | $43.00 | $175 | $100 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $59,350 | $100,000 | $20,000 | $100,000 | $100,000 | $100,000 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,480 FT | $22.00 | $12.75 | $11.00 | $12.50 | $15.00 | $13.50 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $27,500 | $26,000 | $35,000 | $40,000 | $40,000 | 1% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $50,000 | $112,500 | $85,000 | $62,630 | $122,000 | $50,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $47,000 | $100,000 | $35,000 | $120,000 | $115,000 | $75,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $30,300 | $25,000 | $15,000 | $50,000 | $30,000 | $30,000 | 1% |
| 203E20000 EMBANKMENT | 907 CY | $14.00 | $30.00 | $8.50 | $15.00 | $7.00 | $13.00 | 0% |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 1,967 FT | $6.00 | $3.25 | $7.00 | $13.00 | $22.00 | $13.00 | 0% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 4 EACH | $2,500 | $2,455 | $2,000 | $1,850 | $1,943 | $1,950 | 0% |
| 202E98300 REMOVAL MISC.: CLEAN EXISTING ASPHALT | 8,613 SY | $1.00 | $1.05 | $1.00 | $0.25 | $2.00 | $0.50 | 0% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 72 FT | $110 | $86.25 | $88.00 | $90.00 | $114 | $105 | 0% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $6,250 | $6,800 | $20,000 | $10,000 | $8,000 | 0% |
| $0.72 |
| $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.24 TON | $700 | $667 | $611 | $670 | $667 | $650 |
| 659E31000 LIME | 1.89 ACRE | $165 | $154 | $779 | $154 | $154 | $80.00 |
| 659E35000 WATER | 24.7 MGAL | $1.00 | $1.00 | $16.50 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,300 | $1,350 | $1,500 | $7,500 | $10,000 | $10,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $5,610 | $5,500 | $6,700 | $15,000 | $10,000 | $6,500 |
| 602E20000 CONCRETE MASONRY | 0.66 CY | $1,090 | $1,750 | $1,500 | $1,350 | $3,275 | $2,250 |
| 611E07200 18" CONDUIT, TYPE A | 18 FT | $115 | $250 | $176 | $125 | $267 | $50.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,775 | $1,400 | $1,900 | $1,750 | $1,675 | $1,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $357 | $275 | $314 | $325 | $350 | $270 |
| 408E10000 PRIME COAT | 205 GAL | $6.00 | $10.25 | $17.50 | $5.00 | $22.25 | $16.00 |
| 617E10100 COMPACTED AGGREGATE | 44 CY | $108 | $120 | $137 | $100 | $100 | $135 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $155 | $205 | $82.50 | $75.00 | $75.00 | $35.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 3 EACH | $155 | $345 | $275 | $250 | $250 | $55.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.87 MILE | $1,275 | $1,300 | $2,400 | $1,275 | $1,275 | $1,500 |
| 642E00300 CENTER LINE, TYPE 1 | 0.44 MILE | $2,250 | $2,300 | $4,700 | $2,250 | $2,250 | $2,500 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $500 | $42,000 | $1,100 | $50,000 | $4,800 | $33,500 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 80 FT | $20.00 | $14.00 | $29.50 | $45.00 | $23.00 | $13.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 28 FT | $185 | $86.50 | $114 | $300 | $130 | $275 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X250 | 10,722 FT | $149 | $1.60M | 42% |
| 530E00400 SPECIAL - STRUCTURES CONCRETE LAGGING NO. 1 | 2,692 EACH | $240 | $646k | 17% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 5,130 FT | $95 | $487k | 13% |
| 610E50010 RETAINING WALL, MISC.: TIMBER LAGGING | 31,522 SF | $7 | $221k | 6% |
| 203E10000 EXCAVATION | 10,257 CY | $18.25 | $187k | 5% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 1,913 CY | $92 | $176k | 5% |
| 524E95000 DRILLED SHAFTS, MISC.:36" DIAMETER DRILLING THROUG | 1,564 FT | $84 | $131k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $59,350 | $59k | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,480 FT | $22 | $55k | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $50k | 1% |