Published by ODOT on this contract’s Proposal PDF · DBE Goal: 5.0%
5.0%DBE GoalDBE = Disadvantaged Business Enterprise. Federal-USDOT program targeting at least this much of the contract's value with certified small businesses majority-owned by socially / economically disadvantaged individuals (49 CFR Part 26).
Project scope
Bid tab · ODOT
Guardrail & Barrier32%
Erosion & Landscaping16%
Earthwork11%
Mobilization & General11%
Maintaining Traffic11%
Removal & Demolition5%
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 19 items by low bid’s extended amount.
606E15101GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN
19,650 FT
$16.92
60%
606E25550ANCHOR ASSEMBLY, MGS TYPE A
93 EACH
$1,065
18%
209E70000BORROW
2,203 CY
$26.00
10%
624E10000MOBILIZATION
1 LS
$20,000
4%
659E10000SEEDING AND MULCHING
19,644 SY
$0.75
3%
209E15000RESHAPING UNDER GUARDRAIL
220 STA
$50.00
2%
614E11000MAINTAINING TRAFFIC
1 LS
$3,500
1%
832E30000EROSION CONTROL
3,000 EACH
$1.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$2,850
Project details
Type of work
Safety
DBE goal
500%
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
1%
606E18501GUARDRAIL POST, 9 FEET, AS PER PLAN
171 EACH
$12.50
0%
626E00112BARRIER REFLECTOR, TYPE 3 (BIDIRECTIONAL)
271 EACH
$7.50
0%
623E10000CONSTRUCTION LAYOUT STAKES AND SURVEYING
1 LS
$1,466
0%
606E17360GUARDRAIL, TYPE MGS, LONG-SPAN
37.5 FT
$21.60
0%
690E50350SPECIAL - MAILBOX REMOVED AND RESET
4 EACH
$165
0%
690E50000SPECIAL - MAILBOX SUPPORT
4 EACH
$145
0%
659E20000COMMERCIAL FERTILIZER
2.65 TON
$170
0%
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
4 EACH
$75.00
0%
659E31000LIME
4.06 ACRE
$25.00
0%
659E35000WATER
106 MGAL
$0.50
0%
Other
16%
Top items by low bid
Item
Qty
Unit price
Extended
%
606E15101GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN
19,650 FT
$16.92
$332k
60%
606E25550ANCHOR ASSEMBLY, MGS TYPE A
93 EACH
$1,065
$99k
18%
209E70000BORROW
2,203 CY
$26
$57k
10%
624E10000MOBILIZATION
1 LS
$20,000
$20k
4%
659E10000SEEDING AND MULCHING
19,644 SY
$0.75
$15k
3%
209E15000RESHAPING UNDER GUARDRAIL
220 STA
$50
$11k
2%
614E11000MAINTAINING TRAFFIC
1 LS
$3,500
$4k
1%
832E30000EROSION CONTROL
3,000 EACH
$1
$3k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM