BEL-SR 7-08.14
BEL County · est $0.1M
Bid dateThursday, May 21—
BEL County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Perram Electric INC | R3Miller Cable Company | R4Complete General Construction Company | R5Asplundh Construction LLC | R6Central-allied Enterprises INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 632E83600 STRAIN POLE, MISC.: PROVIDE DISTRICT 9 WITH NEW ST | 4 EACH | $6,000 | $5,055 | $4,900 | $6,500 | $5,531 | $6,250 | 21% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $3,500 | $4,780 | $4,850 | $4,000 | $3,534 | $4,000 | 12% |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $6,600 | $7,460 | $6,000 |
| Item | Quantity | R1Cornerstone Electric INC | R2Perram Electric INC | R3Miller Cable Company | R4Complete General Construction Company | R5Asplundh Construction LLC | R6Central-allied Enterprises INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 25 FT | $5.00 | $20.00 | $5.25 | $5.20 | $68.33 | $5.20 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,250 | $3,000 | $1,685 | $2,300 | $1,650 | $1,685 |
| 659E00300 TOPSOIL | 11 CY | $20.00 | $30.00 | $12.00 | $150 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7,000 |
| $7,209 |
| $7,300 |
| 11% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $9,000 | $9,080 | $9,000 | $16,000 | $11,549 | $10,725 | 8% |
| 809E69000 ADVANCE RADAR DETECTION | 1 EACH | $7,000 | $7,760 | $6,300 | $7,500 | $7,548 | $7,525 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $2,690 | $3,000 | $2,500 | $9,266 | $30,000 | 5% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 384 FT | $15.00 | $10.50 | $21.00 | $17.50 | $22.77 | $9.00 | 5% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $5,230 | $4,500 | $6,000 | $5,427 | $5,550 | 5% |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,500 | $3,700 | $3,900 | $5,500 | $4,426 | $4,825 | 4% |
| 632E83506 STRAIN POLE, TYPE TC-81.10, DESIGN 10, INSTALLATIO | 4 EACH | $1,000 | $680 | $500 | $1,250 | $908 | $500 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 4 EACH | $800 | $665 | $900 | $1,000 | $675 | $800 | 3% |
| 632E30200 MESSENGER WIRE, 7 STRAND, 3/8" DIAMETER WITH ACCES | 384 FT | $8.00 | $11.20 | $21.00 | $10.50 | $22.77 | $7.10 | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 37.5 FT | $70.00 | $75.00 | $60.00 | $56.40 | $108 | $56.40 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 857 FT | $3.00 | $2.40 | $2.40 | $3.00 | $2.92 | $2.25 | 2% |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,200 | $1,160 | $1,350 | $1,500 | $1,221 | $1,200 | 2% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,000 | $1,300 | $1,450 | $2,500 | $4,079 | $2,150 | 2% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,000 | $2,820 | $3,000 | $4,000 | $2,062 | $1,750 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $4,000 | $4,000 | $4,000 | $10,000 | $34,000 | 2% |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $1,800 | $1,660 | $1,500 | $2,500 | $2,308 | $2,150 | 2% |
| $98.03 |
| $100 |
| 659E10000 SEEDING AND MULCHING | 225 SY | $5.00 | $0.45 | $0.40 | $14.50 | $6.78 | $1.85 |
| 659E14000 REPAIR SEEDING AND MULCHING | 11 SY | $10.00 | $0.90 | $0.10 | $0.40 | $6.66 | $1.85 |
| 659E15000 INTER-SEEDING | 11 SY | $10.00 | $0.90 | $525 | $0.10 | $6.09 | $1.85 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $7,500 | $835 | $100 | $500 | $22,920 | $1,000 |
| 659E31000 LIME | 0.05 ACRE | $7,500 | $500 | $1.00 | $100 | $10,927 | $400 |
| 659E35000 WATER | 2 MGAL | $1.00 | $10.00 | $600 | $1.00 | $59.04 | $1.00 |
| 611E00400 4" CONDUIT, TYPE E | 20 FT | $15.00 | $9.10 | $2.00 | $17.00 | $7.26 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 2 EACH | $100 | $105 | $10.00 | $7.50 | $41.95 | $7.50 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 1 EACH | $250 | $255 | $610 | $320 | $227 | $1,275 |
| 630E80100 SIGN, FLAT SHEET | 7.5 SF | $25.00 | $31.60 | $40.00 | $35.00 | $24.79 | $42.00 |
| 630E83000 COVERING OF SIGN | 1 SF | $25.00 | $5.00 | $400 | $35.00 | $66.95 | $35.00 |
| 630E84901 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, AS PE | 1 EACH | $25.00 | $10.00 | $200 | $25.00 | $61.30 | $50.00 |
| 644E00500 STOP LINE | 64 FT | $22.50 | $20.00 | $31.00 | $45.00 | $49.39 | $31.25 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 6 FT | $100 | $250 | $85.00 | $335 | $364 | $100 |
| 625E25604 CONDUIT, 4", 725.051 | 47 FT | $20.00 | $13.30 | $25.00 | $12.00 | $3.15 | $15.00 |
| 625E29000 TRENCH | 47 FT | $20.00 | $10.35 | $25.00 | $13.00 | $5.64 | $5.35 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,000 | $1,210 | $1,000 | $1,500 | $1,532 | $1,450 |
| 625E32000 GROUND ROD | 5 EACH | $200 | $260 | $265 | $300 | $183 | $100 |
| 625E36000 PLASTIC CAUTION TAPE | 47 FT | $0.25 | $0.20 | $0.25 | $1.00 | $0.02 | $0.50 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL - SIGNAL CONTROLL | 1 EACH | $800 | $1,200 | $1,250 | $575 | $623 | $1,900 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 6 EACH | $35.00 | $10.00 | $40.00 | $35.00 | $31.22 | $50.00 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 45 FT | $5.00 | $5.60 | $1.50 | $7.00 | $7.29 | $6.00 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 10 FT | $6.00 | $20.20 | $1.80 | $5.00 | $14.61 | $11.50 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $500 | $665 | $500 | $1,000 | $839 | $225 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $500 | $750 | $150 | $2,500 | $1,904 | $300 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $65.00 | $65.00 | $60.00 | $85.00 | $67.80 | $85.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,500 | $1,628 | $682 | $1,000 | $3,500 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $100 | $500 | $1,000 | $5,500 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E83600 STRAIN POLE, MISC.: PROVIDE DISTRICT 9 WITH NEW ST | 4 EACH | $6,000 | $24k | 18% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $3,500 | $14k | 11% |
| 809E69100 STOP LINE RADAR DETECTION | 2 EACH | $6,600 | $13k | 10% |
| 633E65523 CABINET, TYPE 332L, AS PER PLAN | 1 EACH | $9,000 | $9k | 7% |
| 809E69000 ADVANCE RADAR DETECTION | 1 EACH | $7,000 | $7k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $6k | 5% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 384 FT | $15 | $6k | 4% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $6k | 4% |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,500 | $5k | 3% |
| 632E83506 STRAIN POLE, TYPE TC-81.10, DESIGN 10, INSTALLATIO | 4 EACH | $1,000 | $4k | 3% |