ODOT bid tab line items with each bidder’s unit price. Top 18items by winning bid’s extended amount.
| Item | Quantity | R1Perram Electric INC | R2Asplundh Construction LLC | R3Miller Cable Company | R4J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 48 EACH | $1,520 | $1,428 | $2,075 | $2,975 | 52% |
| 625E98000 LIGHTING, MISC.:: HOISTING CABLE KIT | 48 EACH | $545 | $609 | $600 | $600 | 19% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $4,530 | $6,266 | $5,750 | $6,500 | 6% |
| 625E98000 LIGHTING, MISC.:: HPS LAMP REPLACEMENT & CLEANING | 254 EACH | $28.75 | $24.01 | $28.00 | $110 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,880 | $4,928 | $7,170 | $25,800 | 3% |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 2 EACH | $2,270 | $1,611 | $2,100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,500 |
| 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $1,232 | $4,000 | $10,000 | 3% |
| 625E98000 LIGHTING, MISC.:: HOLOPHANE FIELD REPRESENTATIVE | 2 EACH | $1,995 | $2,229 | $1,500 | $2,250 | 3% |
| 625E14500 LIGHT POLE FOUNDATION | 2 EACH | $1,330 | $1,643 | $2,200 | $3,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,844 | $500 | $1,468 | $10,000 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $625 | $2,750 | $1,400 | $3,275 | 0% |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 2 EACH | $310 | $671 | $350 | $550 | 0% |
| 625E32000 GROUND ROD | 2 EACH | $255 | $199 | $300 | $250 | 0% |
| 631E94490 REMOVAL, MISC.: SCHOOL SPEED LIMIT SIGN ASSEMBLY | 2 EACH | $155 | $616 | $650 | $1,000 | 0% |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $280 | $1,216 | $500 | $775 | 0% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $200 | $2,519 | $500 | $10,750 | 0% |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $100 | $123 | $100 | $2,500 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 48 EACH | $1,520 | $73k | 52% |
| 625E98000 LIGHTING, MISC.:: HOISTING CABLE KIT | 48 EACH | $545 | $26k | 19% |
| 631E93241 SCHOOL SPEED LIMIT SIGN ASSEMBLY, SOLAR-POWERED, A | 2 EACH | $4,530 | $9k | 6% |
| 625E98000 LIGHTING, MISC.:: HPS LAMP REPLACEMENT & CLEANING | 254 EACH | $28.75 | $7k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,880 | $5k | 3% |
| 632E90008 PEDESTAL, 15', TRANSFORMER BASE | 2 EACH | $2,270 | $5k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 3% |
| 625E98000 LIGHTING, MISC.:: HOLOPHANE FIELD REPRESENTATIVE | 2 EACH | $1,995 | $4k | 3% |
| 625E14500 LIGHT POLE FOUNDATION | 2 EACH | $1,330 | $3k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,844 | $2k | 1% |