BEL-SR 147-04.90
BEL County · est $0.4M
Bid dateThursday, February 11—
BEL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 47 more items below.
| Item | Quantity | R1Central-allied Enterprises INC | R2Complete General Construction Company | R3Miller Cable Company | R4Perram Electric INC | R5Cornerstone Electric INC | % of bid |
|---|---|---|---|---|---|---|---|
| AA2 632E80981 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 8 EACH | $13,700 | $13,320 | $13,500 | $14,275 | $15,000 | 30% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $6,875 | $6,500 | $7,600 | $7,480 | $7,000 | 15% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 356 FT | $70.00 | $70.00 | $60.00 | $55.60 | $70.00 | 7% |
| Item | Quantity | R1Central-allied Enterprises INC | R2Complete General Construction Company | R3Miller Cable Company | R4Perram Electric INC | R5Cornerstone Electric INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $1,000 | $20.00 | $100 | $1,500 |
| 202E30000 WALK REMOVED | 1,782 SF | $3.00 | $2.60 | $7.00 | $7.00 | $3.00 |
| 202E32000 CURB REMOVED | 445 FT | $9.00 | $8.25 | $18.00 | $18.00 | $6.00 |
| 203E10000 EXCAVATION | 16 CY | $33.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 8 EACH |
| $2,650 |
| $5,500 |
| $5,775 |
| $4,645 |
| $5,000 |
| 6% |
| 633E65510 CABINET, TYPE TS-2 | 2 EACH | $10,050 | $11,000 | $9,100 | $9,330 | $9,500 | 5% |
| AA2 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN (UM NL 118) (AL | 8 EACH | $2,200 | $2,125 | $2,200 | $2,330 | $2,500 | 5% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 16 EACH | $750 | $700 | $850 | $650 | $900 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $10,000 | $10,000 | $10,000 | $15,000 | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,200 | $5,600 | $5,650 | $5,265 | $5,500 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $4,000 | $2,879 | $6,974 | $4,704 | 3% |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 2 EACH | $4,335 | $4,000 | $4,700 | $3,620 | $4,000 | 2% |
| 609E26000 CURB, TYPE 6 | 335 FT | $25.00 | $50.00 | $30.00 | $30.00 | $80.00 | 2% |
| 608E52000 CURB RAMP | 497 SF | $15.50 | $22.00 | $42.00 | $42.00 | $45.00 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $3,850 | $2,200 | $700 | $2,065 | $3,500 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 2 EACH | $3,850 | $2,200 | $700 | $2,065 | $3,500 | 2% |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 2 EACH | $3,850 | $3,100 | $2,200 | $995 | $4,000 | 2% |
| 608E10000 4" CONCRETE WALK | 1,357 SF | $5.40 | $10.00 | $14.00 | $14.00 | $16.00 | 2% |
| AA2 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN(UNION | 3 EACH | $2,350 | $2,100 | $2,200 | $2,825 | $3,500 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $85.00 | $80.00 | $60.00 | $45.00 | $75.00 | 2% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 16 EACH | $375 | $600 | $600 | $405 | $700 | 2% |
| $55.00 |
| $85.00 |
| $85.00 |
| $75.00 |
| 607E98000 FENCE, MISC.:TEMPORARY ORANGE PLASTIC CONSTRUCTION | 600 FT | $0.50 | $3.00 | $3.00 | $3.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 7 CY | $360 | $500 | $300 | $300 | $400 |
| 304E20000 AGGREGATE BASE | 7 CY | $125 | $98.00 | $250 | $250 | $200 |
| 407E20000 NON-TRACKING TACK COAT | 3 GAL | $3.50 | $6.00 | $5.00 | $5.00 | $100 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 2 CY | $360 | $650 | $800 | $800 | $2,500 |
| 625E00450 CONNECTION, FUSED PULL APART | 8 EACH | $125 | $81.00 | $100 | $115 | $150 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 2 EACH | $85.00 | $115 | $100 | $100 | $150 |
| 625E18200 BRACKET ARM, 15' | 8 EACH | $585 | $1,325 | $1,100 | $830 | $1,500 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 723 FT | $3.45 | $3.25 | $3.50 | $2.75 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 456 FT | $1.35 | $2.50 | $2.00 | $0.70 | $1.50 |
| 625E25502 CONDUIT, 3", 725.05 | 212 FT | $6.50 | $16.00 | $14.00 | $9.75 | $15.00 |
| 625E29000 TRENCH | 158 FT | $7.65 | $12.00 | $10.00 | $11.20 | $25.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $615 | $975 | $800 | $1,510 | $1,000 |
| 644E00300 CENTER LINE | 0.12 MILE | $10,020 | $7,500 | $7,500 | $7,500 | $31,300 |
| 644E00400 CHANNELIZING LINE, 8" | 64 FT | $2.05 | $2.00 | $2.00 | $2.00 | $2.50 |
| 644E00500 STOP LINE | 113 FT | $7.50 | $6.80 | $6.80 | $6.80 | $15.00 |
| 644E00600 CROSSWALK LINE | 619 FT | $3.90 | $3.00 | $3.00 | $3.00 | $5.00 |
| 644E01200 PARKING LOT STALL MARKING | 393 FT | $3.30 | $2.35 | $2.35 | $2.35 | $3.00 |
| 644E01300 LANE ARROW | 1 EACH | $220 | $115 | $115 | $115 | $145 |
| 644E01600 HANDICAP SYMBOL MARKING | 2 EACH | $225 | $105 | $105 | $105 | $115 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 476 FT | $7.15 | $3.00 | $3.00 | $3.00 | $13.50 |
| 644E30020 REMOVAL OF PAVEMENT MARKING | 1 EACH | $655 | $90.00 | $90.00 | $90.00 | $250 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $750 | $1,200 | $1,000 | $1,680 | $1,250 |
| 625E32000 GROUND ROD | 10 EACH | $150 | $250 | $265 | $260 | $250 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 158 FT | $0.35 | $0.75 | $0.50 | $0.05 | $1.00 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL SERVICE DISCONNEC | 2 EACH | $1,800 | $950 | $1,750 | $1,500 | $800 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL SERVICE DISCONNEC | 2 EACH | $1,800 | $950 | $1,750 | $1,500 | $800 |
| 632E25001 COVERING OF VEHICULAR SIGNAL HEAD, AS PER PLAN | 16 EACH | $35.00 | $38.00 | $55.00 | $10.00 | $35.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $175 | $325 | $250 | $290 | $350 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 64 FT | $1.70 | $2.20 | $2.00 | $2.85 | $2.75 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,586 FT | $3.75 | $2.60 | $2.80 | $1.85 | $3.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 597 FT | $4.25 | $3.00 | $3.00 | $2.05 | $4.00 |
| 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG | 348 FT | $6.70 | $3.80 | $3.40 | $2.35 | $4.50 |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $565 | $1,200 | $1,000 | $1,245 | $750 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 121 FT | $2.60 | $4.25 | $7.00 | $2.60 | $5.00 |
| 632E69500 SERVICE CABLE, 2 CONDUCTOR, NO. 6 AWG | 118 FT | $2.65 | $4.25 | $7.00 | $2.36 | $6.00 |
| 633E45000 GPS (GLOBAL POSITIONING SYSTEM) CLOCK ASSEMBLY | 2 EACH | $535 | $850 | $800 | $570 | $500 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $1,025 | $2,000 | $3,100 | $2,810 | $2,500 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 2 EACH | $1,830 | $1,950 | $1,800 | $1,660 | $1,750 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,000 | $3,000 | $21,800 | $31,600 | $10,000 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,500 | $2,000 | $1,150 | $1,500 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,250 | $1,500 | $1,650 | $100 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| AA2 632E80981 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 8 EACH | $13,700 | $110k | 24% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 8 EACH | $6,875 | $55k | 12% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 356 FT | $70 | $25k | 5% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 8 EACH | $2,650 | $21k | 5% |
| 633E65510 CABINET, TYPE TS-2 | 2 EACH | $10,050 | $20k | 4% |
| AA2 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN (UM NL 118) (AL | 8 EACH | $2,200 | $18k | 4% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 16 EACH | $750 | $12k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 3% |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 2 EACH | $5,200 | $10k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $10k | 2% |