D03-SYSSIGN FY2021
D03 County · est $0.5M
Bid dateThursday, February 25—
D03 County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 3 more items below.
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Lake Erie Construction Company | R3Trafftech INC | R4M P Dory CO | % of bid |
|---|---|---|---|---|---|---|
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 20,468 FT | $6.00 | $7.50 | $7.30 | $15.00 | 29% |
| 630E80100 SIGN, FLAT SHEET | 10,266 SF | $7.20 | $11.50 | $9.75 | $14.00 | 18% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 1 EACH | $36,000 | $39,850 | $38,350 | $39,500 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $10,875 | $25,000 | $5,000 |
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Lake Erie Construction Company | R3Trafftech INC | R4M P Dory CO |
|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 500 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E32000 GROUND ROD | 3 EACH | $365 | $285 | $160 | $350 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 1 EACH | $220 | $165 | $600 | $500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 7% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $7,225 | $5,150 | $7,000 | $6,500 | 5% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,100 | $500 | $500 | $500 | 4% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 1 EACH | $16,000 | $16,750 | $15,200 | $16,000 | 4% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,829 EACH | $8.40 | $10.00 | $10.00 | $15.00 | 4% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 45 EACH | $300 | $495 | $475 | $600 | 3% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,267 EACH | $9.45 | $15.00 | $25.00 | $15.00 | 3% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 591 SF | $17.45 | $17.00 | $18.00 | $18.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $14,500 | $15,000 | $20,000 | 2% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 484 SF | $17.25 | $16.00 | $15.00 | $19.00 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $94.00 | $50.00 | $65.00 | $75.00 | 2% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 44 EACH | $130 | $195 | $100 | $250 | 1% |
| 630E08600 SIGN POST REFLECTOR | 225 EACH | $21.75 | $40.00 | $25.00 | $38.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,200 | $2,000 | $3,500 | $10,000 | 1% |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 2 EACH | $2,000 | $1,225 | $1,500 | $2,450 | 1% |
| 630E82000 SIGN BACKING ASSEMBLY | 26 EACH | $125 | $120 | $125 | $125 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,900 | $2,550 | $3,500 | $5,000 | 0% |
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 20,468 FT | $6 | $123k | 29% |
| 630E80100 SIGN, FLAT SHEET | 10,266 SF | $7.2 | $74k | 18% |
| 630E72410 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 1 | 1 EACH | $36,000 | $36k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 7% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 3 EACH | $7,225 | $22k | 5% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,100 | $19k | 4% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 1 EACH | $16,000 | $16k | 4% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,829 EACH | $8.4 | $15k | 4% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 45 EACH | $300 | $14k | 3% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,267 EACH | $9.45 | $12k | 3% |