Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
5.0%DBE GoalDBE = Disadvantaged Business Enterprise. Federal-USDOT program targeting at least this much of the contract's value with certified small businesses majority-owned by socially / economically disadvantaged individuals (49 CFR Part 26).
Project scope
Bid form · ODOT
Guardrail & Barrier45%
Erosion & Landscaping27%
Mobilization & General9%
Maintaining Traffic9%
Aggregate & Base5%
Earthwork5%
Top items by winning bid
Item
Qty
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$2,195
2%
659E10000SEEDING AND MULCHING
5,808 SY
$2.50
$2.00
2%
202E38001GUARDRAIL REMOVED, AS PER PLAN
6,300 FT
$2.00
$2.40
2%
606E35141BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN
12 EACH
$1,050
$1,235
2%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$10,000
$7,560
1%
606E35000BRIDGE TERMINAL ASSEMBLY, TYPE 1
3 EACH
$2,150
$1,125
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$5,000
$4,595
1%
626E00110BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL
290 EACH
$8.50
$8.20
0%
832E30000EROSION CONTROL
1,000 EACH
$1.00
$1.00
0%
659E20000COMMERCIAL FERTILIZER
0.78 TON
$750
$200
0%
202E42041ANCHOR ASSEMBLY REMOVED, TYPE T, AS PER PLAN
4 EACH
$125
$150
0%
659E31000LIME
1.2 ACRE
$275
$50.00
0%
659E35000WATER
31 MGAL
$10.00
$1.00
0%
Unit price
Extended
%
606E26150ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016)
133 EACH
$2,350
$313k
39%
606E15050GUARDRAIL, TYPE MGS
8,225 FT
$21.5
$177k
22%
202E42001ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN