LUC-Toledo Ped Safety Impv
LUC County · est $1.0M
Bid dateThursday, April 1—
LUC County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 44 more items below.
| Item | Quantity | R1Perram Electric INC | R2Geddis Paving & Excavating INC | % of bid |
|---|---|---|---|---|
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 370 EACH | $480 | $586 | 24% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 16,624 FT | $4.32 | $3.43 | 10% |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 14 EACH | $4,600 | $6,642 | 9% |
| 608E10000 4" CONCRETE WALK | 5,031 SF | $11.90 | $12.85 | 8% |
| 630E70082 OVERHEAD SIGN SUPPORT FOUNDATION, DMS PEDESTAL | 9 EACH | $4,285 | $3,270 | 5% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 10,194 FT | $3.40 | $0.59 | 5% |
| 630E72520 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 7 | 5 EACH | $6,700 | $7,230 | 5% |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE |
| Item | Quantity | R1Perram Electric INC | R2Geddis Paving & Excavating INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $270 | $10,000 |
| 202E32000 CURB REMOVED | 236 FT | $17.30 | $10.35 |
| 608E13000 6" CONCRETE WALK | 360 SF | $12.95 | $11.86 |
| 608E52000 CURB RAMP | 849 SF | $15.10 | $15.38 |
| 608E53020 DETECTABLE WARNING | 140 SF | $37.80 | $27.00 |
| 660E30000 SODDING UNSTAKED | 120 SY | $18.10 | $46.00 |
| 611E04400 12" CONDUIT, TYPE B | 53 FT | $105 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 366 EACH |
| $90.35 |
| $64.00 |
| 4% |
| 632E72100 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 2 | 4 EACH | $7,510 | $8,485 | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $5,970 | $3,270 | 3% |
| 632E64020 PEDESTAL FOUNDATION | 22 EACH | $1,045 | $1,100 | 3% |
| 633E65510 CABINET, TYPE TS-2 | 2 EACH | $10,325 | $12,381 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $106,575 | 3% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 991 FT | $18.85 | $13.00 | 3% |
| 630E80100 SIGN, FLAT SHEET | 717 SF | $24.00 | $16.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 26 CY | $650 | $735 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,280 | $8,300 | 2% |
| 202E23000 PAVEMENT REMOVED | 284 SY | $48.60 | $50.00 | 2% |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 5,610 FT | $2.40 | $2.96 | 2% |
| 202E30000 WALK REMOVED | 2,033 SF | $6.50 | $2.56 | 2% |
| $280 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $5,075 | $2,500 |
| 611E98645 CATCH BASIN GRATE, AS PER PLAN | 2 EACH | $350 | $975 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 3 EACH | $1,025 | $800 |
| 253E01000 PAVEMENT REPAIR | 46 SY | $130 | $300 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2" DEPTH | 235 SY | $16.20 | $24.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 19 CY | $485 | $535 |
| 304E20000 AGGREGATE BASE | 15 CY | $80.00 | $355 |
| 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 85 SY | $116 | $87.75 |
| 609E14000 CURB, TYPE 2-A | 78 FT | $27.00 | $37.36 |
| 609E16000 CURB, TYPE 2-B | 15 FT | $27.00 | $42.91 |
| 609E24500 CURB, TYPE 4-B | 136 FT | $27.00 | $35.16 |
| 609E72100 CONCRETE MEDIAN | 19 CY | $430 | $375 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 50 FT | $17.70 | $11.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 19 EACH | $95.00 | $10.00 |
| 630E97700 SIGNING, MISC.:SOLAR POWERED FLASHING BEACON SYSTE | 2 EACH | $4,775 | $6,125 |
| 644E00300 CENTER LINE: SOLID DOUBLE | 0.04 MILE | $27,000 | $4,385 |
| 644E00300 CENTER LINE: SOLID SINGLE YELLOW | 0.02 MILE | $27,000 | $2,928 |
| 644E00500 STOP LINE | 52 FT | $7.55 | $7.39 |
| 644E00700 TRANSVERSE/DIAGONAL LINE: YELLOW | 46 FT | $16.20 | $4.87 |
| 644E20801 YIELD LINE, AS PER PLAN | 255 FT | $19.45 | $3.70 |
| 625E18600 BRACKET ARM, MISC.:INSTALLATION ONLY | 2 EACH | $725 | $373 |
| 625E25400 CONDUIT, 2", 725.04 | 130 FT | $14.50 | $19.35 |
| 625E25500 CONDUIT, 3", 725.04 | 25 FT | $32.60 | $25.10 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 75 FT | $107 | $44.00 |
| 625E29000 TRENCH | 155 FT | $15.05 | $7.45 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $1,135 | $990 |
| 625E32000 GROUND ROD | 28 EACH | $290 | $273 |
| 632E04000 VEHICULAR SIGNAL HEAD, MISC.:3 SECTION (HYBRID BEA | 8 EACH | $1,165 | $1,214 |
| 632E20750 ACCESSIBLE PEDESTRIAN PUSHBUTTON | 8 EACH | $765 | $913 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 635 FT | $2.30 | $3.25 |
| 632E89500 PEDESTAL, 3' | 5 EACH | $685 | $1,007 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE | 4 EACH | $45.15 | $268 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, RRFB | 3 EACH | $905 | $268 |
| 633E67100 CABINET FOUNDATION | 2 EACH | $2,130 | $2,255 |
| 809E69122 ATC V6.24 CONTROLLER | 2 EACH | $3,140 | $5,400 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,500 | $65,000 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $1,080 | $9,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 370 EACH | $480 | $178k | 19% |
| 644E00601 CROSSWALK LINE, AS PER PLAN | 16,624 FT | $4.32 | $72k | 8% |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 14 EACH | $4,600 | $64k | 7% |
| 608E10000 4" CONCRETE WALK | 5,031 SF | $11.9 | $60k | 6% |
| 630E70082 OVERHEAD SIGN SUPPORT FOUNDATION, DMS PEDESTAL | 9 EACH | $4,285 | $39k | 4% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 10,194 FT | $3.4 | $35k | 4% |
| 630E72520 OVERHEAD SIGN SUPPORT, TYPE TC-16.22, DESIGN 7 | 5 EACH | $6,700 | $34k | 4% |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM, PEDE | 366 EACH | $90.35 | $33k | 4% |
| 632E72100 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 2 | 4 EACH | $7,510 | $30k | 3% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $5,970 | $24k | 3% |