PAU-SR 111-23.69
PAU County · est $0.3M
Bid dateThursday, April 1—
PAU County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 3 more items below.
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Vernon Nagel INC | R3Eagle Bridge CO | R4Miller Contracting Group INC | R5Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 2,738 CY | $68.00 | $80.00 | $86.00 | $84.25 | $95.50 | 62% |
| 203E10000 EXCAVATION | 757 CY | $25.00 | $18.00 | $35.00 | $31.00 | $31.50 | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $3,000 | $13,500 | $23,500 | $25,297 | 6% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN |
| Item | Quantity | R1Geddis Paving & Excavating INC | R2Vernon Nagel INC | R3Eagle Bridge CO | R4Miller Contracting Group INC | R5Eclipse CO LLC |
|---|---|---|---|---|---|---|
| 659E31000 LIME | 0.1 ACRE | $5.00 | $5.00 | $10.00 | $85.00 | $5.50 |
| 659E35000 WATER | 3 MGAL | $5.00 | $5.00 | $25.00 | $1.00 | $5.50 |
| 616E10000 WATER | 1 MGAL | $30.00 | $10.00 | $25.00 | $1.00 | $120 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 700 FT |
| $23.30 |
| $22.00 |
| $21.85 |
| $23.00 |
| $23.00 |
| 5% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | $52,000 | $47,804 | 3% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $350 | $480 | $400 | $480 | $500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $5,000 | $5,000 | $5,000 | $5,600 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $3,600 | $7,500 | $6,250 | $7,859 | 2% |
| 203E20000 EMBANKMENT | 168 CY | $25.00 | $18.00 | $35.00 | $65.00 | $60.00 | 1% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 10 CY | $350 | $675 | $550 | $725 | $685 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $4,800 | $6,500 | $6,700 | $6,500 | 1% |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $65.00 | $50.00 | $65.00 | $48.00 | $134 | 1% |
| 659E10000 SEEDING AND MULCHING | 419 SY | $5.00 | $6.50 | $5.00 | $3.00 | $5.50 | 1% |
| 202E38000 GUARDRAIL REMOVED | 700 FT | $2.60 | $4.00 | $5.00 | $1.80 | $1.50 | 1% |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 2 EACH | $450 | $150 | $175 | $310 | $114 | 0% |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $65.00 | $80.00 | $95.00 | $48.00 | $134 | 0% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 7 EACH | $8.00 | $8.00 | $8.00 | $12.00 | $8.50 | 0% |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $400 | $400 | $1,250 | $500 | $420 | 0% |
| 407E10000 TACK COAT | 20 GAL | $2.00 | $1.95 | $1.00 | $2.15 | $2.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 2,738 CY | $68 | $186k | 62% |
| 203E10000 EXCAVATION | 757 CY | $25 | $19k | 6% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $18k | 6% |
| 606E15051 GUARDRAIL, TYPE MGS, AS PER PLAN | 700 FT | $23.3 | $16k | 5% |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1 | $10k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 3% |
| 253E02000 PAVEMENT REPAIR | 20 CY | $350 | $7k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $7k | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $5k | 2% |
| 203E20000 EMBANKMENT | 168 CY | $25 | $4k | 1% |