STA-IR 77-01.27
STA County · est $0.3M
Bid dateThursday, April 1—
STA County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Stanley Miller Construction Company | R3Tucson INC | R4Beaver Excavating Company | R5Shelly & Sands INC | R6Karvo Companies INC | R7Lockhart Concrete CO | R8Mark Haynes Construction INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 3,017 CY | $22.00 | $22.30 | $28.00 | $38.00 | $42.00 | $40.00 | $45.00 | $38.00 | 17% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $42,000 | $50,111 | $69,000 | $81,000 | $50,000 | $50,000 |
| Item | Quantity | R1Eclipse CO LLC | R2Stanley Miller Construction Company | R3Tucson INC | R4Beaver Excavating Company | R5Shelly & Sands INC | R6Karvo Companies INC | R7Lockhart Concrete CO | R8Mark Haynes Construction INC |
|---|---|---|---|---|---|---|---|---|---|
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 2 SY | $407 | $889 | $190 | $240 | $154 | $750 | $200 | $125 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $156 | $112 | $75.00 | $92.00 | $100 | $50.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $85,000 |
| $52,000 |
| 11% |
| 601E34001 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER, AS | 206 CY | $172 | $147 | $130 | $152 | $176 | $195 | $300 | $155 | 9% |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 9% |
| 661E99900 PLANTING, MISC.: LIVE STAKES | 8,400 EACH | $4.00 | $3.67 | $6.75 | $7.80 | $8.00 | $3.30 | $3.82 | $10.00 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $31,349 | $16,622 | $10,000 | $10,000 | $10,000 | $23,000 | $30,000 | $17,500 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,500 | $13,888 | $27,000 | $20,000 | $18,000 | $12,000 | $10,000 | $8,500 | 5% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 7,213 SY | $2.50 | $7.23 | $4.00 | $1.38 | $2.00 | $6.50 | $3.00 | $21.00 | 5% |
| 601E34301 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER, AS | 114 CY | $135 | $223 | $158 | $105 | $240 | $274 | $250 | $145 | 4% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $8,889 | $9,800 | $15,000 | $12,500 | $15,000 | $15,000 | $6,500 | 4% |
| 659E00300 TOPSOIL | 801 CY | $16.50 | $32.22 | $30.00 | $26.75 | $40.00 | $29.00 | $60.00 | $75.00 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $12,500 | $16,767 | $7,000 | $3,000 | $11,000 | $6,740 | $25,000 | $6,500 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,289 | $833 | $1,500 | $750 | $800 | $750 | $1,500 | $950 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $5,600 | $6,700 | $2,500 | $2,700 | $7,000 | $15,000 | $5,000 | 2% |
| 601E35000 ROCK CHANNEL PROTECTION, MISC.: NO. 2 AGGREGATE FI | 39 CY | $195 | $93.00 | $136 | $160 | $240 | $284 | $300 | $125 | 2% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,500 | $4,533 | $2,900 | $5,440 | $4,300 | $5,000 | $2,000 | $2,200 | 2% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,500 | $1,694 | $1,645 | $1,525 | $1,600 | $2,000 | $1,500 | $1,650 | 1% |
| 203E10000 EXCAVATION | 328 CY | $12.00 | $10.00 | $32.00 | $14.00 | $12.00 | $18.00 | $30.00 | $18.00 | 1% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $500 | $1,000 | $805 | $2,220 | $2,800 | $2,500 | $1,000 | $800 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 0.97 TON | $1,032 | $889 | $750 | $680 | $720 | $800 | $991 | $1,000 | 0% |
| $250 |
| $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 361 SY | $0.50 | $11.00 | $0.01 | $0.68 | $1.00 | $10.00 | $50.00 | $0.50 |
| 659E31000 LIME | 1.49 ACRE | $309 | $40.00 | $200 | $153 | $160 | $1.30 | $297 | $245 |
| 659E35000 WATER | 39 MGAL | $6.50 | $1.00 | $0.01 | $1.00 | $1.00 | $1.00 | $10.00 | $8.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $10.50 | $5.00 | $40.00 | $10.00 | $28.00 | $10.00 | $30.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 10 FT | $11.50 | $5.00 | $26.00 | $20.00 | $60.00 | $40.00 | $30.00 | $15.00 |
| 611E02600 8" CONDUIT, TYPE F | 10 FT | $12.50 | $6.00 | $26.00 | $20.00 | $60.00 | $45.00 | $40.00 | $18.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $237 | $150 | $385 | $300 | $440 | $1,250 | $200 | $225 |
| 616E10000 WATER | 15 MGAL | $21.00 | $1.00 | $11.00 | $15.00 | $50.00 | $10.00 | $10.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 3,017 CY | $22 | $66k | 17% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $42,000 | $42k | 11% |
| 601E34001 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER, AS | 206 CY | $172 | $35k | 9% |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1 | $35k | 9% |
| 661E99900 PLANTING, MISC.: LIVE STAKES | 8,400 EACH | $4 | $34k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $31,349 | $31k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $19,500 | $20k | 5% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 7,213 SY | $2.5 | $18k | 5% |
| 601E34301 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER, AS | 114 CY | $135 | $15k | 4% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $15k | 4% |