CLA-SR 41-12.04
CLA County · est $0.6M
Bid dateThursday, April 15—
CLA County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 76 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Outdoor Enterprise LLC | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 303 CY | $270 | $210 | $259 | 16% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (472 CY | $167 | $215 | $217 | 16% |
| 632E71372 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 2 EACH | $25,000 | $26,500 | $24,727 | 10% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 126 CY | $280 | $253 | $252 | 7% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,000 |
| Item | Quantity | R1Complete General Construction Company | R2Outdoor Enterprise LLC | R3John R Jurgensen Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $1,800 | $4,280 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $1,600 | $1,000 | $1,855 |
| 202E32000 CURB REMOVED | 88 FT | $15.00 | $12.00 | $7.35 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 60 FT | $20.00 | $25.00 | $32.85 |
| 202E35200 PIPE REMOVED, OVER 24" | 10 FT | $43.00 | $55.00 | $130 |
| 202E38000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $8,300 |
| $7,741 |
| 6% |
| 809E69100 STOP LINE RADAR DETECTION | 4 EACH | $6,700 | $7,900 | $7,396 | 5% |
| 203E10000 EXCAVATION | 408 CY | $50.00 | $28.00 | $37.84 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $14,000 | $28,722 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $9,000 | $20,000 | 4% |
| 304E20000 AGGREGATE BASE | 229 CY | $80.00 | $70.00 | $83.46 | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $3,000 | $2,000 | $2,670 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,000 | $10,000 | $19,565 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 609 FT | $24.00 | $24.00 | $16.99 | 3% |
| 202E23000 PAVEMENT REMOVED | 903 SY | $16.00 | $25.00 | $8.65 | 3% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $7,000 | $5,700 | $5,370 | 3% |
| 625E25904 CONDUIT, JACKED OR DRILLED, 725.05, 4" | 242 FT | $55.00 | $54.00 | $50.44 | 3% |
| 659E00300 TOPSOIL | 1,227 CY | $10.00 | $55.00 | $61.42 | 2% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $11,500 | $11,500 | $10,831 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=3") | 2,291 SY | $3.75 | $7.00 | $7.13 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 55 FT | $155 | $110 | $85.10 | 2% |
| 75 FT |
| $10.00 |
| $10.00 |
| $10.00 |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $925 | $600 | $324 |
| 203E20000 EMBANKMENT | 206 CY | $8.00 | $20.00 | $17.39 |
| 204E10000 SUBGRADE COMPACTION | 1,334 SY | $5.00 | $1.50 | $4.70 |
| 204E13000 EXCAVATION OF SUBGRADE | 44 CY | $58.00 | $35.00 | $41.94 |
| 204E30020 GRANULAR MATERIAL, TYPE C | 44 CY | $62.00 | $55.00 | $65.56 |
| 204E45000 PROOF ROLLING | 4 HOUR | $205 | $100 | $207 |
| 204E50000 GEOTEXTILE FABRIC | 133 SY | $5.00 | $12.00 | $6.09 |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $30.00 | $20.00 | $25.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350) | 3 EACH | $2,750 | $2,900 | $2,375 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,250 | $1,100 | $1,125 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $75.00 | $110 | $71.66 |
| 659E10000 SEEDING AND MULCHING | 11,057 SY | $0.65 | $1.00 | $1.02 |
| 659E14000 REPAIR SEEDING AND MULCHING | 553 SY | $2.00 | $1.00 | $1.02 |
| 659E15000 INTER-SEEDING | 553 SY | $2.00 | $1.00 | $1.02 |
| 659E20000 COMMERCIAL FERTILIZER | 1.5 TON | $425 | $700 | $691 |
| 659E31000 LIME | 2.28 ACRE | $10.00 | $90.00 | $30.71 |
| 659E35000 WATER | 61 MGAL | $1.00 | $1.00 | $30.71 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 18.7 CY | $260 | $650 | $1,965 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 270 FT | $31.00 | $24.00 | $24.28 |
| 611E01500 6" CONDUIT, TYPE F | 68 FT | $28.00 | $45.00 | $22.36 |
| 611E04600 12" CONDUIT, TYPE C | 18 FT | $140 | $90.00 | $168 |
| 611E10400 24" CONDUIT, TYPE B | 5 FT | $246 | $250 | $465 |
| 611E19600 42" CONDUIT, TYPE C | 5 FT | $335 | $375 | $714 |
| 611E53400 58" X 91" CONDUIT, TYPE A, 706.04 | 5 FT | $1,400 | $1,200 | $2,651 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $2,000 | $2,300 | $1,938 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $4,500 | $3,600 | $3,928 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $1,800 | $270 | $607 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,139 FT | $2.00 | $2.00 | $1.40 |
| 407E20000 NON-TRACKING TACK COAT | 145 GAL | $1.00 | $11.00 | $3.50 |
| 609E26000 CURB, TYPE 6 | 100 FT | $42.00 | $115 | $65.64 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 39.2 FT | $11.00 | $20.00 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 43.2 FT | $12.00 | $22.00 | $11.00 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 2 EACH | $325 | $440 | $115 |
| 630E80100 SIGN, FLAT SHEET | 60 SF | $30.00 | $44.00 | $18.50 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $50.00 | $28.00 | $25.00 |
| 644E00104 EDGE LINE, 6" | 0.18 MILE | $1,400 | $5,000 | $1,400 |
| 644E00300 CENTER LINE | 0.06 MILE | $4,600 | $8,300 | $4,600 |
| 644E00400 CHANNELIZING LINE, 8" | 515 FT | $1.50 | $2.00 | $1.50 |
| 644E00500 STOP LINE | 83 FT | $4.50 | $9.00 | $4.50 |
| 644E01300 LANE ARROW | 8 EACH | $100 | $110 | $100 |
| 611E00400 4" CONDUIT, TYPE E | 140 FT | $12.00 | $22.00 | $12.30 |
| 625E25402 CONDUIT, 2", 725.05 | 55 FT | $15.00 | $8.00 | $7.62 |
| 625E25502 CONDUIT, 3", 725.05 | 68 FT | $18.00 | $9.00 | $8.75 |
| 625E25602 CONDUIT, 4", 725.05 | 24 FT | $22.00 | $13.00 | $12.25 |
| 625E29000 TRENCH | 135 FT | $12.00 | $16.00 | $14.93 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $1,200 | $840 | $787 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,400 | $900 | $839 |
| 625E32000 GROUND ROD | 3 EACH | $265 | $265 | $247 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $745 | $930 | $868 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,200 | $1,400 | $1,317 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $35.00 | $40.00 | $37.27 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 811 FT | $4.00 | $3.20 | $2.93 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 135 FT | $4.00 | $4.00 | $3.24 |
| 632E70000 POWER SERVICE | 1 EACH | $2,500 | $33.00 | $3,031 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $6,200 | $5,600 | $5,230 |
| 632E90400 SIGNALIZATION, MISC.: FOUNDATION TEST HOLE | 2 EACH | $2,800 | $2,100 | $1,935 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $3,400 | $1,800 | $1,697 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,400 | $625 | $585 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,000 | $6,300 | $5,926 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,200 | $6,300 | $5,856 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $85.00 | $70.00 | $75.00 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.45 MILE | $6,000 | $1,400 | $6,000 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.55 MILE | $6,000 | $880 | $6,000 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 1,144 FT | $0.50 | $0.80 | $0.50 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 250 FT | $3.00 | $3.90 | $3.00 |
| 614E30000 WORK ZONE ARROW, CLASS I | 7 EACH | $60.00 | $82.00 | $60.00 |
| 614E40050 BUSINESS ENTRANCE SIGN | 2 EACH | $1,500 | $150 | $250 |
| 616E10000 WATER | 1.23 MGAL | $4,000 | $50.00 | $178 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $8,000 | $3,438 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 303 CY | $270 | $82k | 12% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (472 CY | $167 | $79k | 11% |
| 632E71372 SIGNAL SUPPORT, TYPE TC-12.31 DESIGN 10 POLE, WITH | 2 EACH | $25,000 | $50k | 7% |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 126 CY | $280 | $35k | 5% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,000 | $28k | 4% |
| 809E69100 STOP LINE RADAR DETECTION | 4 EACH | $6,700 | $27k | 4% |
| 203E10000 EXCAVATION | 408 CY | $50 | $20k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $20,000 | $20k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 304E20000 AGGREGATE BASE | 229 CY | $80 | $18k | 3% |