ASD-US 30-10.28
ASD County · est $1.6M
Bid dateThursday, April 29—
ASD County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 88 more items below.
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC | R3Rietschlin Construction INC | % of bid |
|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,734 CY | $114 | $127 | $124 | 27% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 506 CY | $180 | $160 | $195 | 8% |
| 304E20000 AGGREGATE BASE | 1,626 CY | $54.00 | $51.00 | $62.00 | 8% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 380 CY | $228 | $200 | $246 | 7% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 1,815 CY | $44.00 | $37.00 |
| Item | Quantity | R1Kokosing Construction Company INC | R2Shelly & Sands INC | R3Rietschlin Construction INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $8,000 | $20,000 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $120 | $330 | $985 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 96 FT | $6.00 | $11.00 | $36.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 10 FT | $44.00 | $28.00 | $198 |
| 202E38000 GUARDRAIL REMOVED | 912.5 FT | $1.60 | $2.00 | $9.00 |
| 202E42010 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $43.50 |
| 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $72,500 | $8,000 | $22,570 | 6% |
| 202E23000 PAVEMENT REMOVED | 4,507 SY | $12.00 | $10.00 | $15.00 | 5% |
| 203E10000 EXCAVATION | 6,567 CY | $7.00 | $13.00 | $15.50 | 4% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 12 EACH | $3,700 | $3,000 | $2,808 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $79,000 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $7,200 | $4,600 | $1,350 | 3% |
| 203E20000 EMBANKMENT | 6,668 CY | $5.00 | $9.00 | $18.00 | 3% |
| 605E06020 4" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 4,086 FT | $7.50 | $11.00 | $8.00 | 3% |
| 690E12060 SPECIAL - PAVEMENT OVERLAY FABRIC COMPOSITE | 1,216 SY | $23.00 | $24.00 | $25.00 | 2% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 12 EACH | $2,300 | $1,000 | $2,090 | 2% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,815 CY | $14.00 | $11.00 | $14.25 | 2% |
| 304E20000 AGGREGATE BASE (AS BERM) | 221 CY | $90.00 | $81.00 | $76.00 | 2% |
| 625E24324 1-1/2" DUCT CABLE WITH THREE NO. 6 AWG 2400 VOLT C | 2,591 FT | $7.00 | $6.00 | $9.00 | 2% |
| 605E05110 4" SHALLOW PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 2,167 FT | $8.00 | $11.00 | $9.50 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 887.5 FT | $19.20 | $20.00 | $21.60 | 1% |
| 1 EACH |
| $135 |
| $140 |
| $279 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 2 EACH | $100 | $106 | $279 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $182 | $405 | $1,195 |
| 204E10000 SUBGRADE COMPACTION | 9,371 SY | $1.00 | $2.00 | $1.25 |
| 204E45000 PROOF ROLLING | 8 HOUR | $230 | $218 | $147 |
| 204E50000 GEOTEXTILE FABRIC | 5,445 SY | $1.20 | $1.00 | $1.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 2 EACH | $2,580 | $2,700 | $2,646 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $985 | $1,000 | $1,188 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 39 SY | $91.00 | $150 | $76.50 |
| 616E10000 WATER | 40 MGAL | $95.00 | $26.00 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $99.00 | $30.00 | $221 |
| 659E00300 TOPSOIL | 2,025 CY | $3.00 | $15.00 | $18.00 |
| 659E00300 TOPSOIL (4" THICK) | 56 CY | $3.00 | $56.00 | $65.00 |
| 659E10000 SEEDING AND MULCHING | 18,243 SY | $0.68 | $1.00 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 913 SY | $0.88 | $1.00 | $3.25 |
| 659E15000 INTER-SEEDING | 913 SY | $0.88 | $1.00 | $3.25 |
| 659E20000 COMMERCIAL FERTILIZER | 3 TON | $549 | $270 | $801 |
| 659E31000 LIME | 4 ACRE | $145 | $30.00 | $489 |
| 659E35000 WATER | 101 MGAL | $1.00 | $2.00 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION (7.5' WIDE AVERAGE) | 500 SY | $1.56 | $2.00 | $5.25 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,595 | $1,700 | $1,053 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,500 | $3,600 | $2,584 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,000 | $4,400 | $4,507 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 1 CY | $1,500 | $1,600 | $944 |
| 611E00200 4" CONDUIT, TYPE C | 46 FT | $23.00 | $24.00 | $11.00 |
| 611E00400 4" CONDUIT, TYPE E | 120 FT | $25.00 | $13.00 | $12.00 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 165 FT | $25.00 | $27.00 | $14.00 |
| 611E01100 6" CONDUIT, TYPE C | 10 FT | $30.00 | $51.00 | $36.25 |
| 611E05900 15" CONDUIT, TYPE B | 169 FT | $90.00 | $54.00 | $78.00 |
| 611E06100 15" CONDUIT, TYPE C | 58 FT | $85.00 | $92.00 | $68.00 |
| 611E19600 42" CONDUIT, TYPE C, 706.02 | 28 FT | $400 | $244 | $375 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,800 | $2,200 | $2,098 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $450 | $440 | $279 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.5") | 973 SY | $2.65 | $13.00 | $3.00 |
| 407E20000 NON-TRACKING TACK COAT | 909 GAL | $2.00 | $3.00 | $2.50 |
| 408E10001 PRIME COAT, AS PER PLAN | 397 GAL | $3.50 | $5.00 | $4.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 4,029 FT | $1.00 | $1.00 | $1.50 |
| 625E00450 CONNECTION, FUSED PULL APART | 24 EACH | $89.00 | $105 | $108 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 36 EACH | $92.00 | $105 | $108 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 2,112 FT | $2.70 | $2.00 | $3.50 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,088 FT | $1.70 | $2.00 | $1.75 |
| 625E25500 CONDUIT, 3", 725.04 | 30 FT | $32.00 | $42.00 | $38.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 574 FT | $27.50 | $68.00 | $59.50 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 12 EACH | $760 | $370 | $378 |
| 625E29000 TRENCH | 2,441 FT | $5.00 | $6.00 | $11.00 |
| 625E30700 PULL BOX, 725.08, 18" | 5 EACH | $760 | $1,000 | $891 |
| 625E30706 PULL BOX, 725.08, 24" | 7 EACH | $900 | $1,200 | $1,134 |
| 625E32000 GROUND ROD | 13 EACH | $200 | $200 | $286 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,060 | $6,300 | $7,730 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 2,441 FT | $0.45 | $1.00 | $0.50 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (US 30 & SR 89) | 1 EACH | $1,015 | $1,000 | $648 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $935 | $500 | $432 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,380 | $500 | $378 |
| 621E00100 RPM | 52 EACH | $73.85 | $80.00 | $49.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 12 EACH | $8.00 | $28.00 | $29.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 1,866 FT | $8.35 | $10.00 | $9.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 88 FT | $59.00 | $68.00 | $63.75 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 92 FT | $42.50 | $41.00 | $46.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 8 EACH | $395 | $400 | $427 |
| 630E80100 SIGN, FLAT SHEET | 510 SF | $13.00 | $14.00 | $14.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 600 SF | $20.00 | $20.00 | $21.75 |
| 630E82000 SIGN BACKING ASSEMBLY | 4 EACH | $125 | $120 | $135 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 8 EACH | $785 | $970 | $848 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 33 EACH | $15.00 | $10.00 | $16.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 41 EACH | $25.00 | $15.00 | $27.00 |
| 644E00104 EDGE LINE, 6" | 1.07 MILE | $3,175 | $3,400 | $5,200 |
| 644E00404 CHANNELIZING LINE, 12" | 2,000 FT | $2.00 | $2.00 | $1.94 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 258 FT | $5.80 | $6.00 | $8.00 |
| 644E01300 LANE ARROW | 10 EACH | $90.00 | $95.00 | $119 |
| 644E01301 LANE ARROW, AS PER PLAN | 6 EACH | $215 | $220 | $205 |
| 644E01410 WORD ON PAVEMENT, 96" | 2 EACH | $195 | $200 | $151 |
| 644E01510 DOTTED LINE, 6" | 1,988 FT | $1.40 | $1.50 | $2.00 |
| 644E20800 YIELD LINE | 24 FT | $14.50 | $15.00 | $15.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,160 FT | $3.35 | $3.00 | $2.75 |
| 630E08600 SIGN POST REFLECTOR | 152 EACH | $25.00 | $26.00 | $27.00 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 6 EACH | $250 | $190 | $195 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $600 | $280 | $648 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $650 | $800 | $702 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 4 EACH | $100 | $140 | $146 |
| 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 20 SNMT | $500 | $640 | $648 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $8,500 | $25,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $5,000 | $8,316 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,734 CY | $114 | $312k | 21% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 506 CY | $180 | $91k | 6% |
| 304E20000 AGGREGATE BASE | 1,626 CY | $54 | $88k | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 380 CY | $228 | $87k | 6% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 1,815 CY | $44 | $80k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $72,500 | $73k | 5% |
| 202E23000 PAVEMENT REMOVED | 4,507 SY | $12 | $54k | 4% |
| 203E10000 EXCAVATION | 6,567 CY | $7 | $46k | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT18B40 | 12 EACH | $3,700 | $44k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |