MOE-SR 537-03.40
MOE County · est $11M
Bid dateThursday, April 29—
MOE County · est $11M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 83 more items below.
| Item | Quantity | R1Cast & Baker Corporation | R2Kokosing Construction Company INC | R3E S Wagner Company | R4Shelly & Sands INC | R5Beaver Excavating Company | R6Triton Construction INC | R7Eclipse CO LLC | R8Litman Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 500,647 CY | $7.25 | $3.90 | $6.67 | $5.10 | $6.35 | $5.50 | $4.60 | $8.75 | 44% |
| 203E20000 EMBANKMENT | 648,928 CY | $1.15 | $3.75 | $2.00 | $3.55 | $2.95 | $3.00 |
| Item | Quantity | R1Cast & Baker Corporation | R2Kokosing Construction Company INC | R3E S Wagner Company | R4Shelly & Sands INC | R5Beaver Excavating Company | R6Triton Construction INC | R7Eclipse CO LLC | R8Litman Excavating INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 2 EACH | $700 | $800 | $530 | $1,000 | $900 | $500 | $1,222 | $5,000 |
| 202E23000 PAVEMENT REMOVED | 10,474 SY | $4.00 | $5.00 | $9.70 | $6.00 | $16.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7.50 |
| $4.50 |
| 9% |
| 611E26000 72" CONDUIT, TYPE A, 707.03, WITH FIELD PAVING | 1,287 FT | $500 | $700 | $638 | $900 | $710 | $945 | $800 | $775 | 8% |
| 511E71100 CONCRETE, MISC.: 1,000 PSI | 2,292 CY | $250 | $130 | $140 | $185 | $215 | $150 | $175 | $275 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,326 CY | $200 | $190 | $190 | $190 | $185 | $190 | $185 | $200 | 6% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $205,000 | $65,000 | $98,422 | $77,000 | $114,000 | $125,000 | $44,000 | $60,000 | 2% |
| 304E20000 AGGREGATE BASE | 2,393 CY | $85.00 | $69.41 | $88.47 | $90.00 | $80.00 | $90.00 | $77.50 | $75.00 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 2,509 CY | $80.00 | $56.00 | $63.88 | $70.00 | $80.00 | $88.00 | $85.00 | $150 | 2% |
| 832E30000 EROSION CONTROL | 200,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 637 CY | $275 | $255 | $226 | $255 | $220 | $255 | $230 | $225 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $175,000 | $297,000 | $749,236 | $650,000 | $762,000 | $663,782 | $296,794 | $350,000 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $150,000 | $200,000 | $400,000 | $400,000 | $400,000 | $400,000 | $400,000 | $450,000 | 2% |
| 611E26000 72" CONDUIT, TYPE A | 188 FT | $780 | $550 | $646 | $525 | $645 | $945 | $750 | $650 | 2% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 1,284 FT | $97.00 | $60.00 | $96.89 | $80.00 | $95.00 | $180 | $134 | $125 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (519 CY | $230 | $215 | $221 | $215 | $215 | $215 | $220 | $225 | 1% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 640 FT | $167 | $105 | $111 | $85.00 | $99.00 | $300 | $136 | $120 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 5,375 FT | $18.50 | $18.90 | $17.22 | $19.00 | $17.22 | $19.00 | $18.00 | $20.00 | 1% |
| 602E20000 CONCRETE MASONRY | 125.4 CY | $785 | $960 | $1,184 | $1,500 | $1,500 | $1,500 | $1,600 | $1,025 | 1% |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1,113 CY | $81.00 | $55.00 | $67.35 | $90.00 | $75.00 | $88.00 | $88.00 | $150 | 1% |
| 203E20001 EMBANKMENT, AS PER PLAN | 87,366 CY | $1.00 | $3.75 | $0.50 | $6.25 | $7.75 | $9.50 | $4.00 | $10.75 | 1% |
| $10.50 |
| $16.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 318 FT | $10.00 | $12.00 | $14.20 | $12.00 | $18.00 | $38.00 | $15.50 | $20.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 154 FT | $5.00 | $60.00 | $25.82 | $18.00 | $115 | $30.00 | $30.00 | $35.00 |
| 202E38000 GUARDRAIL REMOVED | 1,321 FT | $2.00 | $1.50 | $1.90 | $1.80 | $2.00 | $1.80 | $2.00 | $2.25 |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 2,346 FT | $2.25 | $2.27 | $2.00 | $4.00 | $2.00 | $3.80 | $2.00 | $2.40 |
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 6 EACH | $275 | $200 | $250 | $280 | $250 | $280 | $268 | $275 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 2 EACH | $175 | $250 | $150 | $280 | $150 | $280 | $161 | $165 |
| 202E98100 REMOVAL MISC.: PILE EXTRACTION | 105 EACH | $100 | $60.00 | $107 | $100 | $100 | $220 | $220 | $125 |
| 202E98200 REMOVAL MISC.: ABANDONED UTILITY REMOVED | 2,326 FT | $5.00 | $7.00 | $8.11 | $7.00 | $6.00 | $12.00 | $10.50 | $8.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C | 50 CY | $40.00 | $115 | $59.00 | $110 | $50.00 | $100 | $134 | $100 |
| 204E10000 SUBGRADE COMPACTION | 13,795 SY | $1.00 | $2.50 | $1.10 | $2.00 | $1.50 | $1.80 | $1.00 | $3.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 4,412 CY | $5.25 | $8.00 | $5.95 | $14.00 | $9.00 | $14.00 | $7.00 | $15.00 |
| 204E20000 EMBANKMENT | 4,412 CY | $2.50 | $6.00 | $9.20 | $11.00 | $9.00 | $52.00 | $9.00 | $15.00 |
| 204E45000 PROOF ROLLING | 5 HOUR | $100 | $220 | $330 | $325 | $200 | $200 | $750 | $250 |
| 208E10000 PRE-BLAST CONDITION SURVEY | 1 LS | $3,500 | $2,000 | $1,975 | $1,400 | $5,000 | $4,000 | $2,200 | $2,370 |
| 208E12000 BLASTING CONSULTANT | 1 LS | $16,000 | $19,000 | $20,000 | $15,000 | $2,500 | $4,000 | $5,900 | $4,000 |
| 208E13000 AIR BLAST AND NOISE CONTROL | 1 LS | $5,500 | $4,000 | $5,600 | $7,500 | $5,400 | $2,000 | $4,500 | $5,000 |
| 208E14000 VIBRATION CONTROL AND MONITORING | 1 LS | $20,000 | $4,000 | $5,600 | $7,500 | $14,400 | $2,000 | $15,000 | $5,000 |
| 606E20050 ROUNDED END SECTION | 9 EACH | $55.00 | $100 | $50.00 | $50.00 | $50.00 | $50.00 | $53.50 | $60.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,600 | $1,285 | $1,470 | $1,600 | $1,470 | $1,600 | $1,575 | $1,764 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 5 EACH | $2,400 | $2,800 | $2,200 | $2,350 | $2,200 | $2,350 | $2,357 | $2,640 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 6 EACH | $1,025 | $1,115 | $950 | $1,000 | $950 | $1,000 | $1,018 | $1,140 |
| 623E38500 MONUMENT ASSEMBLY | 44 EACH | $950 | $685 | $1,016 | $1,450 | $1,000 | $1,200 | $1,209 | $800 |
| 616E10000 WATER | 500 MGAL | $75.00 | $65.00 | $82.53 | $130 | $75.00 | $100 | $22.00 | $1.00 |
| 659E00100 SOIL ANALYSIS TEST | 4 EACH | $55.00 | $4.00 | $25.00 | $50.00 | $50.00 | $25.00 | $161 | $50.00 |
| 659E00501 SEEDING AND MULCHING, CLASS 1, AS PER PLAN | 13,500 SY | $3.50 | $12.93 | $5.55 | $7.90 | $5.00 | $0.75 | $1.00 | $4.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 106,377 SY | $0.65 | $0.50 | $1.15 | $0.58 | $0.58 | $0.50 | $5.00 | $6.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 5,994 SY | $0.65 | $0.50 | $1.97 | $0.58 | $0.58 | $0.50 | $0.50 | $6.00 |
| 659E15000 INTER-SEEDING | 5,994 SY | $0.65 | $0.01 | $0.50 | $0.58 | $0.58 | $0.01 | $0.01 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 10.8 TON | $650 | $250 | $550 | $610 | $610 | $250 | $268 | $620 |
| 659E31000 LIME | 24.8 ACRE | $85.00 | $25.00 | $100 | $80.00 | $80.00 | $25.00 | $27.00 | $85.00 |
| 659E35000 WATER | 648 MGAL | $1.50 | $0.01 | $10.00 | $1.00 | $1.00 | $0.01 | $0.01 | $1.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 360 SY | $2.00 | $1.50 | $2.30 | $1.85 | $1.85 | $1.50 | $1.50 | $2.00 |
| 671E15000 EROSION CONTROL MAT, TYPE A | 13,500 SY | $2.00 | $1.40 | $2.00 | $1.85 | $1.85 | $1.40 | $1.50 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,500 | $4,000 | $90.94 | $3,000 | $10,000 | $25,000 | $4,500 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $25,000 | $13,000 | $14,435 | $16,500 | $25,000 | $25,000 | $35,000 | $23,700 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $19,000 | $15,680 | $14,000 | $20,000 | $13,900 | $15,000 | $2,000 |
| 503E31100 ROCK EXCAVATION | 1,049 CY | $25.00 | $7.61 | $40.00 | $35.00 | $60.00 | $20.00 | $70.00 | $75.00 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS, 707.31 | 2,155 FT | $12.00 | $20.00 | $18.96 | $14.00 | $13.00 | $18.00 | $10.00 | $20.00 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, 707.31 | 206 FT | $15.00 | $40.00 | $26.94 | $14.00 | $15.00 | $20.00 | $10.00 | $20.00 |
| 605E13402 6" UNCLASSIFIED PIPE UNDERDRAINS FOR SPRINGS | 300 FT | $15.00 | $41.12 | $26.95 | $20.00 | $20.00 | $20.00 | $10.50 | $20.00 |
| 605E13500 6" ROCK CUT UNDERDRAINS, 707.31 | 1,571 FT | $16.50 | $20.00 | $31.33 | $20.00 | $14.00 | $30.00 | $20.00 | $20.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS, 707.31 | 3,355 FT | $7.00 | $13.00 | $14.66 | $11.00 | $8.00 | $18.00 | $10.50 | $10.00 |
| 605E31100 AGGREGATE DRAINS | 53 FT | $10.00 | $40.00 | $15.77 | $24.00 | $20.00 | $22.00 | $16.50 | $10.00 |
| 605E32200 AGGREGATE DRAINS FOR SPRINGS | 150 FT | $12.50 | $42.50 | $15.77 | $24.00 | $20.00 | $22.00 | $15.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 268 FT | $7.00 | $32.00 | $27.96 | $25.00 | $20.00 | $20.00 | $11.50 | $20.00 |
| 611E53600 68" X 106" CONDUIT, TYPE A, 706.04 OR 103" x 71" C | 76 FT | $925 | $1,200 | $972 | $775 | $925 | $945 | $1,100 | $950 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 17 EACH | $250 | $300 | $374 | $250 | $350 | $220 | $273 | $300 |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 331 CY | $110 | $108 | $113 | $90.00 | $110 | $150 | $108 | $127 |
| 253E02000 PAVEMENT REPAIR | 15 CY | $550 | $500 | $771 | $500 | $750 | $500 | $804 | $750 |
| 407E20000 NON-TRACKING TACK COAT | 1,624 GAL | $4.25 | $4.00 | $3.34 | $4.00 | $3.25 | $4.00 | $3.50 | $3.50 |
| 408E10000 PRIME COAT | 432 GAL | $7.00 | $6.00 | $6.17 | $3.00 | $6.00 | $6.00 | $6.50 | $7.00 |
| 617E10100 COMPACTED AGGREGATE | 173 CY | $95.00 | $160 | $101 | $150 | $100 | $150 | $107 | $110 |
| 621E00100 RPM | 124 EACH | $41.00 | $38.00 | $38.00 | $38.00 | $38.00 | $38.00 | $39.00 | $40.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 26 EACH | $11.00 | $30.00 | $18.72 | $10.00 | $15.00 | $6.00 | $7.50 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 109 EACH | $10.00 | $8.00 | $7.00 | $10.00 | $30.00 | $9.50 | $8.50 | $7.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 632 FT | $11.00 | $7.50 | $7.50 | $12.00 | $7.50 | $12.00 | $10.50 | $7.50 |
| 630E08600 SIGN POST REFLECTOR | 12 EACH | $27.00 | $100 | $100 | $45.00 | $100 | $45.00 | $27.00 | $100 |
| 630E80100 SIGN, FLAT SHEET | 191.5 SF | $25.00 | $25.00 | $25.00 | $18.50 | $25.00 | $18.50 | $24.50 | $30.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 17 EACH | $17.00 | $75.00 | $75.00 | $15.00 | $75.00 | $15.00 | $16.00 | $75.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 15 EACH | $17.00 | $85.00 | $85.00 | $15.00 | $85.00 | $15.00 | $16.00 | $85.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 1.9 MILE | $1,130 | $1,050 | $1,329 | $1,050 | $1,050 | $1,050 | $1,125 | $1,050 |
| 642E00300 CENTER LINE, TYPE 1 | 0.93 MILE | $1,750 | $1,650 | $2,089 | $1,650 | $1,650 | $1,650 | $1,768 | $1,650 |
| 644E00500 STOP LINE | 64 FT | $9.00 | $8.00 | $10.13 | $8.00 | $8.00 | $8.00 | $8.50 | $8.00 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $7,100 | $2,695 | $16,826 | $40,000 | $2,500 | $8,000 | $40,000 | $35,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 175 CY | $235 | $220 | $140 | $220 | $150 | $220 | $220 | $200 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 11 EACH | $33.00 | $30.00 | $11.40 | $10.00 | $20.00 | $10.00 | $8.50 | $30.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 11 EACH | $40.00 | $35.00 | $21.14 | $20.00 | $20.00 | $12.00 | $8.50 | $35.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.08 MILE | $13,500 | $12,500 | $15,824 | $12,500 | $12,500 | $12,500 | $13,389 | $12,500 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 40 FT | $13.00 | $12.00 | $15.19 | $12.00 | $12.00 | $12.00 | $13.00 | $12.00 |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 530 FT | $45.00 | $30.00 | $17.00 | $20.00 | $22.00 | $20.00 | $48.00 | $45.00 |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES, HP12x53 | 930 FT | $38.00 | $49.85 | $49.49 | $40.00 | $49.00 | $50.00 | $34.50 | $42.00 |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES, HP14x73 | 833 FT | $48.50 | $62.29 | $60.61 | $50.00 | $60.00 | $60.00 | $45.50 | $53.00 |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 24 CY | $535 | $672 | $606 | $460 | $600 | $1,000 | $762 | $625 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 136 CY | $215 | $119 | $247 | $110 | $245 | $140 | $121 | $130 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 360 FT | $16.00 | $11.87 | $3.03 | $5.00 | $3.00 | $11.00 | $2.50 | $15.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 54 FT | $27.00 | $35.28 | $21.21 | $25.00 | $21.00 | $30.00 | $18.00 | $15.00 |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 25 FT | $375 | $24.00 | $95.96 | $100 | $95.00 | $350 | $67.50 | $120 |
| 530E00400 SPECIAL - STRUCTURES: PRE-CAST CONCRETE PANEL NO. | 202 EACH | $320 | $240 | $242 | $325 | $265 | $230 | $265 | $200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $60,000 | $45,000 | $39,286 | $71,210 | $50,000 | $61,400 | $120,000 | $700,000 |
| 619E16010 FIELD OFFICE, TYPE B | 21 MNTH | $2,000 | $1,800 | $3,555 | $3,000 | $2,590 | $2,300 | $2,600 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $75,000 | $52,000 | $69,736 | $200,000 | $65,000 | $167,000 | $89,652 | $75,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 500,647 CY | $7.25 | $3.63M | 38% |
| 203E20000 EMBANKMENT | 648,928 CY | $1.15 | $746k | 8% |
| 611E26000 72" CONDUIT, TYPE A, 707.03, WITH FIELD PAVING | 1,287 FT | $500 | $644k | 7% |
| 511E71100 CONCRETE, MISC.: 1,000 PSI | 2,292 CY | $250 | $573k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 2,326 CY | $200 | $465k | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $205,000 | $205k | 2% |
| 304E20000 AGGREGATE BASE | 2,393 CY | $85 | $203k | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 2,509 CY | $80 | $201k | 2% |
| 832E30000 EROSION CONTROL | 200,000 EACH | $1 | $200k | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 637 CY | $275 | $175k | 2% |