ALL-US 30-16.19
ALL County · est $2.2M
Bid dateThursday, May 13—
ALL County · est $2.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 93 more items below.
| Item | Quantity | R1Shelly Company | R2Beaverdam Contracting INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Eagle Bridge CO | R6Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,498 CY | $142 | $145 | $142 | $142 | $142 | $148 | 28% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,474 CY | $42.00 | $38.50 | $33.00 | $40.00 | $44.00 | $51.00 | 8% |
| 304E20000 AGGREGATE BASE | 2,611 CY | $55.00 | $39.00 | $42.50 |
| Item | Quantity | R1Shelly Company | R2Beaverdam Contracting INC | R3Miller Bros Const INC | R4Vernon Nagel INC | R5Eagle Bridge CO | R6Eclipse CO LLC |
|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 5 EACH | $125 | $250 | $200 | $150 | $200 | $135 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 103 FT | $12.00 | $12.00 | $15.00 | $5.00 | $8.00 | $26.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 197 FT | $12.50 | $16.00 | $20.00 | $10.00 | $25.00 | $27.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $47.00 |
| $55.00 |
| $50.00 |
| 8% |
| 203E10000 EXCAVATION | 7,104 CY | $18.00 | $15.50 | $14.00 | $15.00 | $18.00 | $17.00 | 7% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 536 CY | $190 | $176 | $190 | $190 | $190 | $190 | 6% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 459 CY | $220 | $200 | $220 | $220 | $220 | $220 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $20,000 | $100,000 | $100,000 | $100,000 | $100,000 | 6% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 6,220 FT | $15.00 | $37.00 | $15.10 | $20.00 | $22.50 | $34.00 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,100 CY | $22.00 | $15.00 | $25.00 | $16.00 | $18.00 | $21.00 | 4% |
| 832E30000 EROSION CONTROL | 50,510 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $50,000 | $45,000 | $55,500 | $30,000 | $80,000 | $33,523 | 3% |
| 659E00300 TOPSOIL | 2,699 CY | $18.00 | $7.50 | $25.00 | $22.00 | $8.00 | $25.00 | 3% |
| 202E23000 PAVEMENT REMOVED , (ASPHALT) | 8,953 SY | $5.00 | $5.00 | $10.00 | $15.00 | $5.00 | $7.00 | 2% |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 3,960 FT | $10.25 | $8.00 | $15.00 | $12.00 | $6.00 | $10.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $40,000 | $25,000 | $10,000 | $1,000 | $5,000 | $1,294 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 121 CY | $283 | $190 | $283 | $283 | $283 | $220 | 2% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 4,271 FT | $8.00 | $9.00 | $10.00 | $11.00 | $8.00 | $8.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (155 CY | $210 | $175 | $210 | $210 | $210 | $190 | 2% |
| 873E22000 WORK ZONE EDGE LINE, CLASS I | 2.27 MILE | $13,000 | $10,500 | $10,000 | $10,000 | $10,000 | $10,333 | 2% |
| 204E50000 GEOTEXTILE FABRIC | 10,342 SY | $2.10 | $3.00 | $0.90 | $1.05 | $1.50 | $2.00 | 1% |
| 202E58100 CATCH BASIN REMOVED | 2 EACH | $400 | $200 | $100 | $250 | $200 | $467 |
| 202E75000 FENCE REMOVED | 2,482 FT | $1.80 | $0.50 | $2.00 | $3.00 | $2.00 | $2.00 |
| 203E20000 EMBANKMENT | 3,619 CY | $5.50 | $7.50 | $14.00 | $6.00 | $10.00 | $8.00 |
| 204E10000 SUBGRADE COMPACTION | 29,599 SY | $0.60 | $0.75 | $1.00 | $0.35 | $0.25 | $2.00 |
| 204E45000 PROOF ROLLING | 10 HOUR | $300 | $25.00 | $100 | $250 | $175 | $249 |
| 607E15000 FENCE, TYPE 47 | 694 FT | $19.60 | $7.50 | $16.00 | $17.25 | $16.00 | $18.00 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 4 SY | $350 | $250 | $125 | $150 | $150 | $142 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 3 CY | $155 | $75.00 | $200 | $100 | $125 | $142 |
| 659E10000 SEEDING AND MULCHING | 24,311 SY | $0.59 | $0.75 | $0.59 | $0.59 | $1.20 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,216 SY | $0.20 | $0.25 | $0.20 | $0.20 | $1.15 | $1.00 |
| 659E15000 INTER-SEEDING | 1,216 SY | $0.15 | $0.20 | $0.15 | $0.15 | $1.15 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 3.39 TON | $400 | $500 | $400 | $400 | $1,000 | $529 |
| 659E31000 LIME | 5.02 ACRE | $5.00 | $5.00 | $5.00 | $5.00 | $150 | $53.00 |
| 659E35000 WATER | 135 MGAL | $0.50 | $5.00 | $0.50 | $1.00 | $20.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 6,167 SY | $1.90 | $2.00 | $1.90 | $1.90 | $2.50 | $2.00 |
| 670E00700 DITCH EROSION PROTECTION | 558 SY | $1.90 | $2.00 | $1.90 | $1.90 | $2.50 | $2.00 |
| 670E00710 DITCH EROSION PROTECTION MAT, TYPE A | 244 SY | $1.70 | $1.75 | $1.70 | $1.70 | $2.50 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,195 | $2,500 | $2,195 | $2,500 | $2,500 | $1,107 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $5,440 | $6,500 | $2,720 | $650 | $11,000 | $3,940 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $7,990 | $9,000 | $7,576 | $7,600 | $6,000 | $7,802 |
| 602E20000 CONCRETE MASONRY | 1.2 CY | $1,750 | $1,200 | $1,500 | $1,500 | $1,500 | $2,622 |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 2,088 FT | $9.00 | $8.00 | $13.00 | $12.00 | $10.00 | $9.00 |
| 605E31100 AGGREGATE DRAINS | 264 FT | $19.00 | $15.00 | $20.00 | $15.00 | $10.00 | $18.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 336 FT | $20.00 | $15.00 | $35.00 | $20.00 | $10.00 | $27.00 |
| 611E01500 6" CONDUIT, TYPE F | 158 FT | $33.50 | $15.00 | $40.00 | $20.00 | $10.00 | $11.00 |
| 611E05900 15" CONDUIT, TYPE B | 76 FT | $70.00 | $90.00 | $55.00 | $60.00 | $65.00 | $57.00 |
| 611E06100 15" CONDUIT, TYPE C | 33 FT | $116 | $70.00 | $70.00 | $46.00 | $90.00 | $61.00 |
| 611E07400 18" CONDUIT, TYPE B, 706.02 | 319 FT | $61.00 | $90.00 | $90.00 | $89.00 | $75.00 | $82.00 |
| 611E13200 30" CONDUIT, TYPE A, 706.02 | 118 FT | $152 | $110 | $120 | $140 | $125 | $132 |
| 611E13400 30" CONDUIT, TYPE B | 16 FT | $164 | $120 | $160 | $145 | $200 | $173 |
| 611E98230 CATCH BASIN, NO. 4 | 1 EACH | $3,800 | $2,750 | $4,000 | $3,500 | $4,500 | $5,143 |
| 611E98410 CATCH BASIN, NO. 8 | 2 EACH | $3,200 | $3,000 | $3,000 | $2,500 | $4,500 | $3,989 |
| 611E99574 MANHOLE, NO. 3 | 2 EACH | $3,400 | $3,000 | $3,200 | $4,500 | $4,500 | $4,012 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $400 | $750 | $200 | $250 | $250 | $251 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 6,329 FT | $2.10 | $1.75 | $2.10 | $2.10 | $2.00 | $2.00 |
| 253E02000 PAVEMENT REPAIR | 20 CY | $450 | $350 | $300 | $350 | $400 | $237 |
| 407E20000 NON-TRACKING TACK COAT | 1,581 GAL | $2.20 | $2.00 | $2.20 | $2.20 | $2.20 | $2.00 |
| 617E10100 COMPACTED AGGREGATE | 50 CY | $100 | $50.00 | $75.00 | $47.00 | $65.00 | $73.00 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 2,822 FT | $1.85 | $1.95 | $1.85 | $1.85 | $2.43 | $2.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 12 EACH | $91.00 | $100 | $91.00 | $91.00 | $95.00 | $72.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 18 EACH | $97.00 | $100 | $97.00 | $97.00 | $95.00 | $84.00 |
| 625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN (AT15B | 2 EACH | $672 | $950 | $672 | $672 | $925 | $383 |
| 625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN (AT20B | 4 EACH | $877 | $1,025 | $877 | $877 | $975 | $383 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 6 EACH | $1,164 | $1,750 | $1,164 | $1,164 | $1,550 | $1,544 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 1,300 FT | $3.00 | $3.20 | $3.00 | $3.00 | $3.50 | $3.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,050 FT | $1.20 | $1.75 | $1.20 | $1.20 | $1.65 | $1.00 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 2,531 FT | $7.80 | $9.60 | $7.80 | $7.80 | $9.50 | $8.90 |
| 625E25500 CONDUIT, 3", 725.04 | 191 FT | $46.80 | $32.50 | $46.80 | $46.80 | $30.00 | $33.00 |
| 625E25900 CONDUIT, JACKED OR DRILLED: "3" | 164 FT | $59.60 | $50.00 | $59.60 | $59.60 | $48.00 | $104 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: LED, 240 VOL | 6 EACH | $460 | $475 | $460 | $460 | $450 | $416 |
| 625E29002 TRENCH, 24" DEEP | 2,632 FT | $4.30 | $10.50 | $4.30 | $4.30 | $10.00 | $4.00 |
| 625E30700 PULL BOX, 725.08, 18" | 6 EACH | $852 | $875 | $852 | $852 | $850 | $1,112 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,013 | $1,075 | $1,013 | $1,013 | $1,025 | $1,226 |
| 625E32000 GROUND ROD | 6 EACH | $269 | $275 | $269 | $269 | $265 | $202 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,490 | $7,500 | $6,490 | $6,490 | $2,436 | $13,149 |
| 621E00100 RPM | 108 EACH | $47.50 | $60.00 | $39.15 | $39.15 | $39.15 | $60.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 1,432.3 FT | $10.00 | $12.00 | $10.00 | $10.00 | $10.00 | $11.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 137.6 FT | $29.50 | $30.00 | $29.50 | $29.50 | $29.50 | $32.00 |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 90 FT | $49.50 | $50.00 | $49.50 | $49.50 | $49.50 | $53.00 |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 84 FT | $34.00 | $37.50 | $34.00 | $34.00 | $34.00 | $37.00 |
| 630E08600 SIGN POST REFLECTOR | 44 EACH | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 | $47.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 16 EACH | $335 | $450 | $335 | $335 | $335 | $369 |
| 630E80100 SIGN, FLAT SHEET | 629 SF | $14.20 | $35.00 | $14.20 | $14.20 | $14.20 | $17.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 470 SF | $18.50 | $25.00 | $18.50 | $18.50 | $18.50 | $20.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 16 EACH | $835 | $925 | $835 | $835 | $835 | $923 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 75 EACH | $10.00 | $20.00 | $10.00 | $10.00 | $10.00 | $11.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 97 EACH | $15.00 | $25.00 | $15.00 | $15.00 | $15.00 | $16.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.12 MILE | $650 | $700 | $650 | $650 | $650 | $654 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 3.3 MILE | $700 | $890 | $700 | $700 | $700 | $914 |
| 642E00204 LANE LINE, 6", TYPE 1 | 1.6 MILE | $500 | $375 | $500 | $500 | $500 | $360 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $2,000 | $1,400 | $2,000 | $2,000 | $2,000 | $1,342 |
| 642E00404 CHANNELIZING LINE, 12", TYPE 1 | 3,382 FT | $0.50 | $1.20 | $0.50 | $0.50 | $0.50 | $1.00 |
| 642E00500 STOP LINE, TYPE 1 | 85 FT | $3.00 | $3.50 | $3.00 | $3.00 | $3.00 | $3.00 |
| 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1 | 850 FT | $2.00 | $5.75 | $2.00 | $2.00 | $2.00 | $5.00 |
| 642E00720 CHEVRON MARKING, TYPE 1 | 259 FT | $3.00 | $3.90 | $3.00 | $3.00 | $3.00 | $4.00 |
| 642E01300 LANE ARROW, TYPE 1 | 32 EACH | $32.00 | $75.00 | $32.00 | $32.00 | $32.00 | $72.00 |
| 642E01510 DOTTED LINE, 6", TYPE 1 | 350 FT | $1.00 | $0.70 | $1.00 | $1.00 | $1.00 | $1.00 |
| 642E20802 YIELD LINE, TYPE 1 | 36 FT | $2.00 | $15.00 | $2.00 | $2.00 | $2.00 | $14.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 80 HOUR | $70.00 | $100 | $70.00 | $70.00 | $80.00 | $67.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 6,220 FT | $0.50 | $3.00 | $0.50 | $0.50 | $2.00 | $3.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $1,885 | $2,100 | $1,885 | $2,000 | $2,500 | $1,957 |
| 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN | 204 EACH | $6.00 | $7.50 | $6.00 | $37.00 | $8.91 | $6.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 10 SNMT | $1,000 | $1,200 | $1,000 | $1,000 | $1,000 | $1,082 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.11 MILE | $1,000 | $1,100 | $1,000 | $1,000 | $1,000 | $1,628 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,680 FT | $1.00 | $0.75 | $1.00 | $1.00 | $1.00 | $1.00 |
| 614E30200 WORK ZONE ARROW, CLASS I, 642 PAINT | 2 EACH | $30.00 | $80.00 | $30.00 | $30.00 | $30.00 | $81.00 |
| 616E10000 WATER | 1 MGAL | $1,000 | $100 | $100 | $10.00 | $50.00 | $146 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,000 | $50,000 | $15,000 | $20,000 | $30,000 | $33,500 |
| 619E16010 FIELD OFFICE, TYPE B | 3 MNTH | $1,800 | $3,500 | $850 | $1,500 | $2,350 | $1,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $12,500 | $6,000 | $10,500 | $25,000 | $27,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 3,498 CY | $142 | $497k | 22% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 3,474 CY | $42 | $146k | 6% |
| 304E20000 AGGREGATE BASE | 2,611 CY | $55 | $144k | 6% |
| 203E10000 EXCAVATION | 7,104 CY | $18 | $128k | 6% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 536 CY | $190 | $102k | 4% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 459 CY | $220 | $101k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 6,220 FT | $15 | $93k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 3,100 CY | $22 | $68k | 3% |
| 832E30000 EROSION CONTROL | 50,510 EACH | $1 | $51k | 2% |