WAY-US 30-20.15
WAY County · est $0.8M
Bid dateThursday, May 13—
WAY County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 95 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2S E T INC | R3Eclipse CO LLC | % of bid |
|---|---|---|---|---|---|
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,350 CY | $56.00 | $68.00 | $56.45 | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 433 CY | $152 | $189 | $200 | 10% |
| 304E20000 AGGREGATE BASE | 718 CY | $68.00 | $68.00 | $55.39 | 8% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 234 CY | $208 | $189 | $300 | 8% |
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 4 EACH | $10,600 | $9,700 | $10,200 | 7% |
| 203E10000 EXCAVATION | 1,173 CY | $34.00 | $22.00 | $25.88 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $70,000 |
| Item | Quantity | R1Shelly & Sands INC | R2S E T INC | R3Eclipse CO LLC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $20,000 | $2,026 |
| 202E23000 PAVEMENT REMOVED | 667 SY | $15.00 | $15.00 | $13.35 |
| 203E20000 EMBANKMENT | 132 CY | $11.00 | $21.00 | $20.67 |
| 204E10000 SUBGRADE COMPACTION | 2,067 SY | $5.00 | $1.00 | $2.02 |
| 204E45000 PROOF ROLLING | 2 HOUR | $218 | $200 | $213 |
| 204E50000 GEOTEXTILE FABRIC | 2,025 SY | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $85,000 |
| 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 175 CY | $187 | $210 | $472 | 5% |
| 619E16010 FIELD OFFICE, TYPE B | 11 MNTH | $2,700 | $800 | $800 | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,900 | $7,500 | $7,500 | 4% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,350 CY | $19.00 | $22.00 | $27.15 | 4% |
| 832E30000 EROSION CONTROL | 25,000 EACH | $1.00 | $1.00 | $1.00 | 4% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,158 FT | $20.00 | $26.00 | $15.07 | 4% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 3 EACH | $7,400 | $8,000 | $7,750 | 3% |
| 632E64000 STRAIN POLE FOUNDATION | 4 EACH | $5,300 | $5,500 | $6,800 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $100,000 | $49,050 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.5" | 432 SY | $39.00 | $21.00 | $16.06 | 3% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $12,000 | $11,000 | $12,084 | 2% |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $11,600 | $3,800 | $3,213 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,000 | $8,000 | $19,500 | 2% |
| $1.60 |
| $1.30 |
| 204E51000 GEOGRID | 2,025 SY | $1.00 | $2.00 | $1.72 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 2 EACH | $370 | $260 | $804 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 10.8 SY | $235 | $110 | $85.30 |
| 616E10000 WATER | 3 MGAL | $135 | $50.00 | $38.34 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $105 | $200 | $111 |
| 659E00300 TOPSOIL | 118 CY | $63.00 | $48.00 | $61.54 |
| 659E10000 SEEDING AND MULCHING | 1,111 SY | $2.00 | $2.00 | $3.38 |
| 659E14000 REPAIR SEEDING AND MULCHING | 80 SY | $1.00 | $1.00 | $3.38 |
| 659E15000 INTER-SEEDING | 80 SY | $1.00 | $1.00 | $3.38 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $680 | $1,000 | $676 |
| 659E31000 LIME | 0.33 ACRE | $111 | $500 | $88.64 |
| 659E35000 WATER | 9 MGAL | $1.00 | $10.00 | $1.11 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,600 | $2,000 | $2,437 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,000 | $3,500 | $4,986 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 387 FT | $14.00 | $10.00 | $9.15 |
| 605E06000 4" BASE PIPE UNDERDRAINS | 778 FT | $12.00 | $10.00 | $9.15 |
| 605E31100 AGGREGATE DRAINS | 30 FT | $15.00 | $12.00 | $10.76 |
| 611E00406 4" CONDUIT, TYPE F | 30 FT | $18.00 | $16.00 | $21.54 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 60 FT | $31.00 | $16.00 | $17.10 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 6 EACH | $335 | $250 | $606 |
| 407E10000 TACK COAT | 2 GAL | $2.00 | $105 | $5.40 |
| 407E20000 NON-TRACKING TACK COAT | 468 GAL | $3.00 | $3.00 | $2.00 |
| 408E10000 PRIME COAT | 103 GAL | $3.00 | $4.00 | $6.00 |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3 CY | $495 | $420 | $525 |
| 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE) | 124 FT | $27.00 | $53.00 | $41.55 |
| 621E00300 RPM REFLECTOR, 1-WAY, WHITE | 16 EACH | $53.00 | $90.00 | $55.40 |
| 621E00300 RPM REFLECTOR, 2-WAY, WHITE/RED | 31 EACH | $53.00 | $93.00 | $55.40 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 183 FT | $8.00 | $8.00 | $16.62 |
| 630E08600 SIGN POST REFLECTOR | 4 EACH | $67.00 | $67.00 | $55.40 |
| 630E80100 SIGN, FLAT SHEET | 104.55 SF | $17.00 | $20.00 | $19.94 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 25.3 SF | $87.00 | $90.00 | $74.23 |
| 630E85000 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE | 11 EACH | $33.00 | $33.00 | $25.48 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 15 EACH | $50.00 | $50.00 | $22.16 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 422 FT | $8.00 | $8.00 | $6.96 |
| 644E00104 EDGE LINE, 6" | 0.28 MILE | $4,800 | $4,800 | $12,308 |
| 644E00204 LANE LINE, 6" | 0.11 MILE | $2,115 | $2,100 | $4,941 |
| 644E00400 CHANNELIZING LINE, 8" | 930 FT | $2.00 | $2.00 | $2.04 |
| 644E00500 STOP LINE | 123 FT | $8.00 | $8.00 | $12.65 |
| 644E00720 CHEVRON MARKING | 34 FT | $6.00 | $6.00 | $8.32 |
| 644E01300 LANE ARROW | 11 EACH | $95.00 | $95.00 | $120 |
| 625E25604 CONDUIT, 4", 725.051 | 81 FT | $11.00 | $18.00 | $17.73 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 1,507 FT | $1.00 | $2.00 | $0.55 |
| 625E25920 CONDUIT, MISC.:, CABLES REMOVED AND CONDUIT ABANDO | 428 FT | $1.00 | $1.00 | $0.55 |
| 625E29000 TRENCH | 66 FT | $11.00 | $9.00 | $16.07 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,600 | $900 | $1,219 |
| 625E31510 PULL BOX REMOVED | 6 EACH | $106 | $160 | $194 |
| 625E32000 GROUND ROD | 5 EACH | $211 | $250 | $294 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 66 FT | $2.00 | $1.00 | $0.72 |
| 625E39520 PULL BOX CLEANED | 15 EACH | $160 | $100 | $44.32 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL - POWER SUPPLY AN | 1 EACH | $1,060 | $1,500 | $2,437 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $900 | $850 | $1,330 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,300 | $1,500 | $1,750 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 21 EACH | $37.00 | $50.00 | $44.32 |
| 632E30400 MESSENGER WIRE, 7 STRAND, 1/2" DIAMETER WITH ACCES | 464 FT | $16.00 | $6.00 | $23.00 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 464 FT | $16.00 | $6.00 | $22.50 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,389 FT | $4.00 | $3.00 | $3.55 |
| 632E42300 SIGNAL CABLE, 3 CONDUCTOR, NO. 12 AWG | 2,024 FT | $3.00 | $2.50 | $3.05 |
| 632E69200 POWER CABLE, 2 CONDUCTOR, NO. 4 AWG | 500 FT | $5.00 | $5.00 | $4.43 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 10 FT | $6.00 | $20.00 | $5.54 |
| 632E70000 POWER SERVICE | 1 EACH | $1,900 | $3,200 | $1,828 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $530 | $500 | $499 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $10,600 | $12,200 | $10,500 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,115 | $2,500 | $3,213 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $530 | $500 | $554 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 3 EACH | $2,115 | $2,000 | $1,883 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,400 | $6,500 | $6,980 |
| 633E99300 CONTROLLER ITEM, MISC.: REMOVAL AND INSTALLATION O | 1 LS | $1,600 | $200 | $565 |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 1 EACH | $9,000 | $10,200 | $10,858 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 186 FT | $3.00 | $3.00 | $4.21 |
| 809E69123 ATC V6.24 CONTROLLER, AS PER PLAN | 1 EACH | $4,300 | $5,200 | $4,321 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $70.00 | $65.00 | $72.02 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,158 FT | $3.00 | $3.00 | $2.77 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,000 | $2,000 | $2,172 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,080 | $2,000 | $2,194 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, 1-WAY | 30 EACH | $8.00 | $16.00 | $16.62 |
| 614E13350 OBJECT MARKER, ONE WAY | 30 EACH | $13.00 | $16.00 | $16.62 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 10 SNMT | $1,000 | $1,000 | $1,163 |
| 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT | 0.19 MILE | $1,300 | $1,500 | $648 |
| 614E21600 WORK ZONE CENTER LINE, CLASS II, 740.06, TYPE I | 0.1 MILE | $9,000 | $9,000 | $14,960 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.81 MILE | $7,400 | $7,400 | $981 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.22 MILE | $5,000 | $5,000 | $864 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 560 FT | $4.00 | $4.00 | $0.90 |
| 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P | 560 FT | $1.00 | $1.00 | $0.85 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 74 FT | $7.00 | $7.00 | $4.58 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 54 FT | $4.00 | $5.00 | $4.91 |
| 614E30000 WORK ZONE ARROW, CLASS I | 7 EACH | $275 | $280 | $116 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 7 EACH | $27.00 | $30.00 | $110 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.:COVER EXISTING P | 1,090 FT | $2.00 | $3.00 | $7.87 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,000 | $10,000 | $16,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 204E30010 GRANULAR MATERIAL, TYPE B | 1,350 CY | $56 | $76k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 433 CY | $152 | $66k | 7% |
| 304E20000 AGGREGATE BASE | 718 CY | $68 | $49k | 6% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 234 CY | $208 | $49k | 5% |
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 4 EACH | $10,600 | $42k | 5% |
| 203E10000 EXCAVATION | 1,173 CY | $34 | $40k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $35,000 | $35k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 175 CY | $187 | $33k | 4% |
| 619E16010 FIELD OFFICE, TYPE B | 11 MNTH | $2,700 | $30k | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $6,900 | $28k | 3% |