ATH-US 33-18.48
ATH County · est $2.7M
Bid dateThursday, August 12—
ATH County · est $2.7M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1George J Igel & CO INC | R2Alan Stone CO INC | R3Allard Excavation LLC | R4Kanawha Stone Company Incorporated | R5Eclipse CO LLC | R6D G M INC | R7Beaver Excavating Company | R8Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 18,068 CY | $51.00 | $52.00 | $64.20 | $69.62 | $50.50 | $57.50 | $51.00 | $63.00 | 42% |
| 203E10000 EXCAVATION | 67,018 CY | $6.50 | $7.40 | $7.54 | $8.42 | $10.25 | $10.00 |
| Item | Quantity | R1George J Igel & CO INC | R2Alan Stone CO INC | R3Allard Excavation LLC | R4Kanawha Stone Company Incorporated | R5Eclipse CO LLC | R6D G M INC | R7Beaver Excavating Company | R8Shelly & Sands INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E20010 HEADWALL REMOVED | 1 EACH | $600 | $750 | $741 | $1,584 | $784 | $500 | $1,000 | $200 |
| 202E35200 PIPE REMOVED, OVER 24" | 50 FT | $12.00 | $40.00 | $29.65 | $64.43 | $29.50 | $50.00 | $65.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $8.50 |
| $11.00 |
| 20% |
| 690E98100 SPECIAL - HORIZONTAL DRILLED HOLES | 3,950 FT | $32.00 | $38.00 | $34.00 | $49.93 | $38.50 | $45.00 | $40.00 | $40.00 | 6% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN (NO. 8 AGGREGATE) | 1,496 CY | $84.00 | $65.00 | $61.37 | $95.40 | $81.50 | $80.00 | $90.00 | $58.00 | 6% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 1,609 CY | $68.00 | $68.00 | $58.07 | $68.00 | $62.50 | $70.00 | $60.00 | $64.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $95,000 | $230,000 | $70,508 | $100,000 | $100,000 | $100,000 | $100,000 | 5% |
| 203E20000 EMBANKMENT | 43,556 CY | $2.25 | $5.50 | $4.27 | $1.82 | $8.75 | $8.00 | $13.00 | $11.00 | 4% |
| 611E22201 54" CONDUIT, TYPE A, AS PER PLAN, 707.01 WITH CONC | 81 FT | $535 | $590 | $363 | $725 | $333 | $650 | $650 | $425 | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 553 CY | $74.00 | $90.00 | $58.14 | $75.54 | $79.00 | $75.00 | $95.00 | $115 | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $38,200 | $25,000 | $4,500 | $4,911 | $122,845 | $40,000 | $50,000 | $50,000 | 2% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $29,500 | $45,000 | $15,000 | $22,943 | $24,000 | $35,000 | $135,000 | $82,000 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $22,000 | $20,000 | $8,500 | $62,000 | $32,500 | $20,000 | $13,000 | $49,700 | 1% |
| 690E98100 SPECIAL - HORIZONTAL DRAIN PIPE | 3,950 FT | $5.10 | $4.00 | $3.50 | $3.70 | $5.50 | $10.00 | $11.00 | $5.10 | 1% |
| 611E01500 6" CONDUIT, TYPE F, 707.33 | 432 FT | $28.00 | $4.50 | $7.95 | $30.63 | $10.50 | $15.00 | $17.00 | $25.00 | 1% |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC, 712.09, TYPE A | 4,784 SY | $2.50 | $2.00 | $1.00 | $2.70 | $3.00 | $1.25 | $1.85 | $1.00 | 1% |
| 203E98000 ROADWAY, MISC.: EMBANKMENT (NO. 57 AGGREGATE) | 175 CY | $67.00 | $69.00 | $71.15 | $147 | $70.50 | $100 | $135 | $100 | 1% |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 118 CY | $98.00 | $145 | $69.00 | $134 | $98.50 | $120 | $175 | $255 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,000 | $15,000 | $19,000 | $15,850 | $42,500 | $25,000 | $20,000 | $21,000 | 0% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $10,990 | $12,000 | $11,000 | $11,601 | $12,000 | $12,000 | $11,000 | $11,000 | 0% |
| $18.00 |
| 659E10000 SEEDING AND MULCHING | 15,628 SY | $0.70 | $0.80 | $0.92 | $1.27 | $0.70 | $1.20 | $0.69 | $0.70 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,667 SY | $1.40 | $3.00 | $0.05 | $1.27 | $0.70 | $1.00 | $0.69 | $0.70 |
| 659E20000 COMMERCIAL FERTILIZER | 1.5 TON | $520 | $3,000 | $500 | $655 | $250 | $600 | $250 | $250 |
| 659E31000 LIME | 3.3 ACRE | $230 | $800 | $500 | $84.50 | $25.00 | $80.00 | $25.00 | $25.00 |
| 659E35000 WATER | 85 MGAL | $5.00 | $115 | $1.00 | $1.06 | $1.00 | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,450 | $3,000 | $1,450 | $1,056 | $3,500 | $3,000 | $1,500 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $8,160 | $9,000 | $10,000 | $8,999 | $11,000 | $10,000 | $2,400 | $9,000 |
| 602E20000 CONCRETE MASONRY | 1.4 CY | $1,800 | $350 | $3,800 | $4,035 | $1,226 | $2,000 | $3,000 | $2,500 |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (PERFORATED) | 1,325 FT | $4.75 | $3.00 | $3.65 | $25.35 | $7.00 | $12.50 | $5.00 | $3.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 5 EACH | $239 | $200 | $185 | $547 | $285 | $200 | $365 | $300 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 18,068 CY | $51 | $921k | 41% |
| 203E10000 EXCAVATION | 67,018 CY | $6.5 | $436k | 19% |
| 690E98100 SPECIAL - HORIZONTAL DRILLED HOLES | 3,950 FT | $32 | $126k | 6% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN (NO. 8 AGGREGATE) | 1,496 CY | $84 | $126k | 6% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 1,609 CY | $68 | $109k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 203E20000 EMBANKMENT | 43,556 CY | $2.25 | $98k | 4% |
| 611E22201 54" CONDUIT, TYPE A, AS PER PLAN, 707.01 WITH CONC | 81 FT | $535 | $43k | 2% |
| 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 553 CY | $74 | $41k | 2% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $38,200 | $38k | 2% |