ALL-Beaverdam Lighting
ALL County · est $0.4M
Bid dateThursday, August 26—
ALL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
| Item | Qty | Unit price |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 17items by winning bid’s extended amount.
| Item | Quantity | R1U S Utility Contractor Company | R2Complete General Construction Company | R3Perram Electric INC | R4Miller Cable Company | R5J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|---|---|
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 27,196 FT | $2.76 | $2.25 | $2.45 | $2.75 | $2.75 | 26% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051: 2" | 3,679 FT | $16.18 | $16.00 | $17.38 | $20.00 | $21.00 | 20% |
| AA1 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 29 EACH | $1,770 | $1,820 | $1,683 | $1,425 | $2,250 | 17% |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 29 EACH |
| $1,067 |
| $1,200 |
| $1,077 |
| $965 |
| $1,275 |
| 11% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 29 EACH | $985 | $1,200 | $1,475 | $1,520 | $1,275 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $6,400 | $10,000 | $10,000 | $10,000 | $20,000 | 2% |
| 625E32000 GROUND ROD | 29 EACH | $220 | $300 | $260 | $265 | $250 | 2% |
| 625E00460 CONNECTION, UNFUSED PULL APART | 58 EACH | $104 | $100 | $82.40 | $85.00 | $120 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,550 | $8,000 | $9,386 | $8,800 | $11,250 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 58 EACH | $89.30 | $110 | $87.40 | $85.00 | $100 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,550 | $2,000 | $3,700 | $400 | $45,275 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,450 | $1,500 | $100 | $478 | $10,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,000 | $2,000 | $4,840 | $2,735 | $20,000 | 1% |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,595 FT | $1.87 | $1.50 | $0.65 | $1.40 | $1.50 | 1% |
| 659E10000 SEEDING AND MULCHING | 860 SY | $2.53 | $5.00 | $1.05 | $1.00 | $3.50 | 1% |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $880 | $1,200 | $1,250 | $1,250 | $1,000 | 1% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 14 EACH | $92.75 | $130 | $110 | $85.00 | $120 | 0% |
| Extended |
|---|
| % |
|---|
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 27,196 FT | $2.76 | $75k | 26% |
| 625E25906 CONDUIT, JACKED OR DRILLED, 725.051: 2" | 3,679 FT | $16.18 | $60k | 20% |
| AA1 625E10481 LIGHT POLE, DECORATIVE, AS PER PLAN | 29 EACH | $1,770 | $51k | 17% |
| 625E27551 LUMINAIRE, DECORATIVE, AS PER PLAN (STERNBERG D650 | 29 EACH | $1,067 | $31k | 11% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 29 EACH | $985 | $29k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $6,400 | $6k | 2% |
| 625E32000 GROUND ROD | 29 EACH | $220 | $6k | 2% |
| 625E00460 CONNECTION, UNFUSED PULL APART | 58 EACH | $104.25 | $6k | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $5,550 | $6k | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 58 EACH | $89.3 | $5k | 2% |