ATB-SIGN FY2022 (Systematic)
ATB County · est $0.5M
Bid dateThursday, August 26—
ATB County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 13 more items below.
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Trafftech INC | R3Lake Erie Construction Company | R4M P Dory CO | % of bid |
|---|---|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 17,397 FT | $7.41 | $9.50 | $10.00 | $12.50 | 29% |
| 630E80100 SIGN, FLAT SHEET | 9,708 SF | $10.60 | $12.50 | $12.50 | $16.50 | 23% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $20,600 | $20,300 | $22,375 | $20,750 | 9% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,950 | $300 | $375 | $1,000 | 5% |
| Item | Quantity | R1Cleveland Barricading Systems LLC | R2Trafftech INC | R3Lake Erie Construction Company | R4M P Dory CO |
|---|---|---|---|---|---|
| 201E11001 CLEARING AND GRUBBING, AS PER PLAN | 1 LS | $1,600 | $1,500 | $1,150 | $5,000 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E32000 GROUND ROD | 2 EACH | $400 | $215 | $325 | $500 |
| 630E08600 SIGN POST REFLECTOR (YELLOW) | 124 EACH | $13.70 | $25.00 | $32.00 | $42.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,300 | $7,500 | $6,150 | $50,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $19,000 | $15,000 | $6,550 | $50,000 | 4% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,857 EACH | $9.80 | $15.00 | $10.00 | $15.00 | 4% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,544 EACH | $10.85 | $20.00 | $15.00 | $15.00 | 4% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 664 SF | $22.70 | $17.50 | $19.00 | $23.00 | 3% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 2 EACH | $7,100 | $5,200 | $5,750 | $7,250 | 3% |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 326 SF | $33.75 | $19.00 | $20.00 | $25.00 | 2% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 80 EACH | $84.25 | $45.00 | $115 | $150 | 1% |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 12 EACH | $525 | $750 | $595 | $625 | 1% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 870 FT | $6.45 | $8.50 | $9.00 | $12.50 | 1% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 21 EACH | $220 | $65.00 | $285 | $300 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $94.00 | $75.00 | $22.00 | $50.00 | 1% |
| 630E08600 SIGN POST REFLECTOR (RED) | 259 EACH | $13.70 | $25.00 | $32.00 | $42.00 | 1% |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 29 EACH | $101 | $55.00 | $55.00 | $45.00 | 1% |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, C | 49 FT | $46.00 | $24.00 | $25.00 | $20.00 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,250 | $2,500 | $3,150 | $5,000 | 0% |
| 7 EACH |
| $270 |
| $175 |
| $320 |
| $500 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 4 EACH | $348 | $185 | $345 | $500 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 6 EACH | $83.00 | $95.00 | $100 | $175 |
| 630E80101 SIGN, FLAT SHEET, AS PER PLAN | 18 SF | $17.90 | $16.00 | $21.00 | $25.00 |
| 630E85001 REMOVAL OF GROUND MOUNTED SIGN AND STORAGE, AS PER | 7 EACH | $47.00 | $25.00 | $20.00 | $60.00 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 11 EACH | $133 | $75.00 | $65.00 | $50.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 7 EACH | $320 | $200 | $165 | $115 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 83 EACH | $23.00 | $15.00 | $15.00 | $15.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,897 | $1,800 | $2,525 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 17,397 FT | $7.41 | $129k | 28% |
| 630E80100 SIGN, FLAT SHEET | 9,708 SF | $10.6 | $103k | 22% |
| 630E72320 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 6 | 2 EACH | $20,600 | $41k | 9% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $3,950 | $24k | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,300 | $22k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $19,000 | $19k | 4% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1,857 EACH | $9.8 | $18k | 4% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,544 EACH | $10.85 | $17k | 4% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 664 SF | $22.7 | $15k | 3% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 2 EACH | $7,100 | $14k | 3% |