STA-SR 687-03.03
STA County · est $1.2M
Bid dateThursday, September 16—
STA County · est $1.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 139 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Eclipse CO LLC | R3S E T INC | R4Lockhart Concrete CO | R5Karvo Companies INC | R6Wenger Excavating INC | R7Shelly Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (391 CY | $156 | $185 | $226 | $216 | $178 | $202 | $165 | 10% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 281 CY | $197 | $194 | $275 | $262 | $230 | $212 | $225 | 9% |
| 624E10000 MOBILIZATION | 1 LS |
| Item | Quantity | R1Shelly & Sands INC | R2Eclipse CO LLC | R3S E T INC | R4Lockhart Concrete CO | R5Karvo Companies INC | R6Wenger Excavating INC | R7Shelly Company |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,300 | $4,500 | $10,000 | $19,000 | $3,500 | $14,269 | $2,500 |
| 202E11004 STRUCTURE REMOVED, (SIGN) | 1 EACH | $945 | $1,682 | $1,500 | $200 | $1,000 | $597 | $2,700 |
| 202E23000 PAVEMENT REMOVED | 138 SY | $35.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $40,000 |
| $58,597 |
| $40,000 |
| $49,000 |
| $72,500 |
| $88,637 |
| $40,000 |
| 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 174 CY | $215 | $250 | $242 | $231 | $250 | $192 | $250 | 6% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $3,000 | $1,050 | $300 | $1,000 | $2,000 | $1,779 | $2,500 | 6% |
| 632E79130 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $17,000 | $16,761 | $17,500 | $14,500 | $15,174 | $19,772 | $15,000 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $34,000 | $72,039 | $100,000 | $97,000 | $55,000 | $159,732 | $300,000 | 6% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,400 | $7,641 | $8,000 | $8,500 | $6,918 | $7,444 | $6,500 | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,200 | $7,280 | $7,600 | $7,500 | $6,591 | $7,000 | $6,200 | 5% |
| 203E10000 EXCAVATION | 818 CY | $34.00 | $29.50 | $25.00 | $20.00 | $36.00 | $46.60 | $35.00 | 5% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 644 FT | $42.00 | $36.00 | $36.00 | $50.00 | $40.00 | $40.00 | $32.05 | 4% |
| 638E20168 SPECIAL - 12" WATER MAIN DIP CLASS 52 MECHANICAL J | 179 FT | $147 | $187 | $146 | $150 | $325 | $227 | $135 | 4% |
| 611E07400 18" CONDUIT, TYPE B | 236 FT | $100 | $91.50 | $130 | $100 | $200 | $151 | $120 | 4% |
| 895E10030 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 3 | 1 EACH | $22,500 | $25,745 | $30,000 | $19,000 | $23,500 | $17,607 | $32,000 | 4% |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $4,400 | $5,540 | $4,200 | $3,500 | $6,000 | $4,878 | $4,400 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3.0" | 7,283 SY | $3.00 | $3.00 | $5.00 | $4.50 | $4.25 | $4.00 | $5.00 | 4% |
| 611E13400 30" CONDUIT, TYPE B | 145 FT | $140 | $141 | $220 | $150 | $185 | $200 | $270 | 3% |
| 632E72150 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 14 | 1 EACH | $20,000 | $19,410 | $20,000 | $17,200 | $17,572 | $18,047 | $18,000 | 3% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 304 FT | $63.00 | $81.50 | $78.00 | $105 | $73.80 | $94.00 | $68.00 | 3% |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 4 EACH | $4,700 | $3,476 | $5,600 | $5,400 | $3,147 | $3,400 | $3,800 | 3% |
| $45.25 |
| $35.00 |
| $20.00 |
| $45.00 |
| $12.90 |
| $45.00 |
| 202E30000 WALK REMOVED | 641 SF | $2.00 | $2.00 | $2.00 | $0.25 | $10.00 | $4.50 | $4.75 |
| 202E32500 CURB AND GUTTER REMOVED | 825 FT | $4.00 | $4.50 | $7.00 | $12.00 | $12.00 | $9.70 | $19.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 177 FT | $9.00 | $11.00 | $30.00 | $15.00 | $15.00 | $16.50 | $50.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 219 FT | $45.00 | $57.75 | $58.00 | $30.00 | $95.00 | $33.50 | $150 |
| 202E58000 MANHOLE REMOVED | 3 EACH | $720 | $1,117 | $500 | $1,000 | $2,200 | $769 | $500 |
| 202E58100 CATCH BASIN REMOVED | 4 EACH | $408 | $552 | $300 | $500 | $575 | $702 | $600 |
| 202E98100 REMOVAL MISC.:MANUFACTURED WATER QUALITY STRUCTURE | 1 EACH | $1,800 | $4,690 | $2,500 | $19,000 | $2,175 | $2,986 | $3,000 |
| 203E20000 EMBANKMENT | 50 CY | $16.00 | $14.00 | $47.00 | $50.00 | $40.00 | $44.00 | $40.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 15 CY | $24.00 | $38.00 | $70.00 | $50.00 | $50.00 | $48.20 | $50.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 15 CY | $112 | $78.25 | $85.00 | $75.00 | $125 | $88.60 | $50.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $215 | $219 | $200 | $150 | $150 | $298 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 45 SY | $1.00 | $3.75 | $14.00 | $10.00 | $3.00 | $5.00 | $10.00 |
| 608E10000 4" CONCRETE WALK | 436 SF | $11.00 | $15.00 | $15.00 | $9.00 | $10.00 | $14.80 | $12.00 |
| 608E52000 CURB RAMP | 1,331 SF | $10.00 | $15.25 | $15.00 | $10.00 | $15.00 | $15.60 | $12.10 |
| 608E53020 DETECTABLE WARNING | 61 SF | $44.00 | $32.50 | $30.00 | $50.00 | $30.00 | $36.80 | $29.50 |
| 609E26000 CURB, TYPE 6 | 290 FT | $46.00 | $48.00 | $45.00 | $40.00 | $45.00 | $48.00 | $40.05 |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 60 SY | $93.00 | $124 | $115 | $100 | $70.00 | $127 | $109 |
| 659E00300 TOPSOIL | 220 CY | $54.00 | $72.50 | $70.00 | $50.00 | $50.00 | $24.00 | $67.75 |
| 659E10000 SEEDING AND MULCHING | 1,982 SY | $1.00 | $2.25 | $3.50 | $5.00 | $0.93 | $3.80 | $5.29 |
| 659E14000 REPAIR SEEDING AND MULCHING | 100 SY | $1.00 | $2.25 | $0.50 | $1.00 | $1.00 | $2.00 | $1.35 |
| 659E15000 INTER-SEEDING | 100 SY | $1.00 | $2.25 | $0.10 | $1.00 | $0.10 | $2.00 | $1.35 |
| 659E20000 COMMERCIAL FERTILIZER | 0.28 TON | $675 | $773 | $500 | $1,500 | $1,000 | $612 | $1,500 |
| 659E31000 LIME | 0.41 ACRE | $160 | $94.00 | $100 | $400 | $5.00 | $400 | $397 |
| 659E35000 WATER | 11 MGAL | $1.00 | $1.00 | $1.00 | $50.00 | $0.25 | $2.00 | $50.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 404 FT | $20.00 | $11.50 | $15.00 | $20.00 | $22.00 | $14.20 | $25.00 |
| 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS | 292 FT | $20.00 | $11.50 | $15.00 | $22.00 | $25.00 | $14.20 | $25.00 |
| 611E00900 6" CONDUIT, TYPE B, FOR DRAINAGE CONNECTION | 50 FT | $20.00 | $24.00 | $45.00 | $40.00 | $21.00 | $18.00 | $15.00 |
| 611E01100 6" CONDUIT, TYPE C, FOR DRAINAGE CONNECTION | 50 FT | $20.00 | $21.25 | $22.00 | $30.00 | $18.00 | $17.00 | $15.00 |
| 611E01400 6" CONDUIT, TYPE E, FOR DRAINAGE CONNECTION | 50 FT | $20.00 | $15.50 | $22.00 | $30.00 | $17.00 | $17.00 | $15.00 |
| 611E01500 6" CONDUIT, TYPE F | 73 FT | $40.00 | $20.50 | $22.00 | $35.00 | $26.00 | $17.00 | $80.00 |
| 611E01500 6" CONDUIT, TYPE F, FOR DRAINAGE CONNECTION | 50 FT | $20.00 | $15.50 | $22.00 | $32.00 | $16.00 | $17.00 | $15.00 |
| 611E04400 12" CONDUIT, TYPE B | 27 FT | $130 | $106 | $96.00 | $80.00 | $225 | $150 | $175 |
| 611E04401 12" CONDUIT, TYPE B, AS PER PLAN | 22 FT | $250 | $209 | $100 | $100 | $575 | $157 | $950 |
| 611E04600 12" CONDUIT, TYPE C | 16 FT | $120 | $74.00 | $76.00 | $68.00 | $160 | $148 | $255 |
| 611E13401 30" CONDUIT, TYPE B, AS PER PLAN | 40 FT | $216 | $245 | $220 | $200 | $275 | $211 | $415 |
| 611E13600 30" CONDUIT, TYPE C | 8 FT | $160 | $453 | $250 | $150 | $715 | $189 | $475 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $3,800 | $5,820 | $3,000 | $3,000 | $4,300 | $5,020 | $4,700 |
| 611E98180 CATCH BASIN, NO. 3A | 2 EACH | $3,300 | $4,597 | $2,200 | $2,500 | $3,000 | $4,343 | $3,000 |
| 611E98300 CATCH BASIN, NO. 5 | 1 EACH | $4,000 | $6,062 | $3,000 | $3,500 | $3,150 | $4,562 | $7,500 |
| 611E99575 MANHOLE, NO. 3, AS PER PLAN | 1 EACH | $5,000 | $6,028 | $4,400 | $4,000 | $6,500 | $8,997 | $9,000 |
| 611E99584 MANHOLE, NO. 3 WITH 96" BASE I.D. AND 9" WEIR | 1 EACH | $10,000 | $16,038 | $8,600 | $9,000 | $15,000 | $12,032 | $7,300 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN | 3 EACH | $2,100 | $1,657 | $1,200 | $500 | $1,500 | $828 | $1,350 |
| 204E10000 SUBGRADE COMPACTION | 893 SY | $6.00 | $3.50 | $2.00 | $5.00 | $1.25 | $6.40 | $1.00 |
| 251E01000 PARTIAL DEPTH PAVEMENT REPAIR (441) | 100 SY | $108 | $84.00 | $38.00 | $36.00 | $110 | $68.00 | $110 |
| 253E01000 PAVEMENT REPAIR | 100 SY | $165 | $124 | $85.00 | $81.00 | $135 | $97.00 | $120 |
| 304E20000 AGGREGATE BASE | 162 CY | $88.00 | $75.25 | $75.00 | $55.00 | $115 | $90.80 | $150 |
| 407E20000 NON-TRACKING TACK COAT | 736 GAL | $3.00 | $2.75 | $3.50 | $3.10 | $2.25 | $3.00 | $2.00 |
| 690E98100 SPECIAL - REINFORCEMENT MESH FOR SAW CUT JOINTS | 754 FT | $16.00 | $7.00 | $16.00 | $4.00 | $16.00 | $17.80 | $15.55 |
| 202E34900 PIPE REMOVED (12" WATER MAIN) | 158 FT | $34.00 | $37.25 | $14.00 | $40.00 | $78.00 | $32.00 | $65.00 |
| 638E20500 SPECIAL - VALVE BOX ADJUSTED TO GRADE (AQUA) | 3 EACH | $755 | $650 | $500 | $100 | $1,200 | $168 | $1,000 |
| 638E20712 SPECIAL - 12" X 12" TAPPING SLEEVE, VALVE AND VALV | 2 EACH | $9,240 | $8,544 | $8,700 | $9,000 | $8,000 | $8,787 | $8,700 |
| 638E20754 SPECIAL - FIRE HYDRANT REMOVED AND RESET (AQUA) | 1 EACH | $3,600 | $1,110 | $2,500 | $8,000 | $3,000 | $3,323 | $3,200 |
| 638E20786 SPECIAL - RETAP AND RECONNECT WATER SERVICE CONNEC | 12 FT | $285 | $232 | $200 | $149 | $200 | $68.00 | $600 |
| 638E20884 SPECIAL - CUT AND PLUG EXISTING 12" WATER LINE(AQU | 2 EACH | $1,300 | $591 | $1,000 | $1,000 | $1,550 | $1,414 | $3,000 |
| 638E20904 SPECIAL - SERVICE BOX REMOVE, (AQUA) | 1 EACH | $1,040 | $536 | $500 | $100 | $80.00 | $200 | $2,400 |
| 638E20914 SPECIAL - 1 1/2" CURB VALVE AND BOX (AQUA) | 2 EACH | $1,400 | $1,178 | $1,000 | $1,900 | $725 | $1,472 | $3,200 |
| 611E99655 MANHOLE ADJUSTED TO GRADE, AS PER PLAN (SANITARY) | 5 EACH | $2,530 | $1,657 | $1,200 | $950 | $1,500 | $870 | $2,500 |
| 621E00100 RPM | 14 EACH | $240 | $260 | $270 | $200 | $235 | $333 | $225 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $7.00 | $9.00 | $20.00 | $10.00 | $1.00 | $78.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 52 FT | $16.00 | $16.50 | $12.50 | $12.00 | $15.00 | $15.00 | $12.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $53.00 | $66.25 | $27.00 | $25.00 | $60.00 | $112 | $25.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 4 EACH | $26.00 | $16.50 | $31.50 | $30.00 | $15.00 | $89.00 | $30.00 |
| 646E10010 EDGE LINE, 6" | 0.4 MILE | $3,200 | $11,902 | $5,040 | $4,800 | $30,000 | $33,000 | $4,800 |
| 646E10110 LANE LINE, 6" | 0.3 MILE | $7,000 | $10,102 | $2,620 | $2,500 | $6,500 | $7,878 | $2,500 |
| 646E10200 CENTER LINE | 0.13 MILE | $16,000 | $16,072 | $6,200 | $5,900 | $15,000 | $16,222 | $5,900 |
| 646E10300 CHANNELIZING LINE, 8" | 1,017 FT | $3.00 | $2.00 | $2.00 | $2.20 | $2.75 | $3.60 | $2.20 |
| 646E10310 CHANNELIZING LINE, 12" | 492 FT | $4.00 | $2.25 | $2.50 | $2.50 | $3.50 | $5.00 | $2.50 |
| 646E10400 STOP LINE | 228 FT | $13.00 | $11.50 | $14.00 | $13.00 | $12.00 | $13.40 | $13.00 |
| 646E10500 CROSSWALK LINE | 372 FT | $8.00 | $7.25 | $6.00 | $5.00 | $7.25 | $11.00 | $5.00 |
| 646E20300 LANE ARROW | 16 EACH | $207 | $193 | $170 | $155 | $195 | $279 | $155 |
| 611E00406 4" CONDUIT, TYPE F | 28 FT | $5.00 | $4.00 | $15.00 | $8.00 | $3.54 | $5.00 | $50.00 |
| 625E18100 BRACKET ARM, 12' | 2 EACH | $690 | $935 | $1,100 | $1,100 | $847 | $908 | $1,000 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 368 FT | $3.00 | $4.00 | $3.50 | $5.50 | $3.54 | $4.00 | $6.00 |
| 625E23306 NO. 10 AWG 600 VOLT DISTRIBUTION CABLE | 1,396 FT | $2.00 | $1.25 | $2.50 | $1.80 | $1.23 | $1.60 | $3.00 |
| 625E25400 CONDUIT, 2", 725.04 | 159 FT | $21.00 | $24.25 | $25.00 | $18.00 | $21.90 | $24.90 | $18.00 |
| 625E25500 CONDUIT, 3", 725.04 | 10 FT | $37.00 | $48.50 | $77.00 | $38.00 | $43.80 | $46.40 | $93.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 2" | 44 FT | $37.00 | $43.50 | $50.00 | $68.00 | $39.36 | $52.00 | $82.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 265 FT | $53.00 | $69.50 | $60.00 | $88.00 | $62.85 | $79.00 | $60.00 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), 200 WA | 2 EACH | $634 | $521 | $550 | $650 | $472 | $552 | $560 |
| 625E29000 TRENCH | 197 FT | $6.00 | $6.00 | $12.00 | $12.00 | $5.48 | $16.20 | $25.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $1,050 | $999 | $750 | $950 | $905 | $940 | $545 |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,300 | $1,195 | $850 | $1,050 | $1,082 | $1,212 | $655 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 100 FT | $2.00 | $0.50 | $2.00 | $1.00 | $0.49 | $2.00 | $3.45 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL (SR 687 / DRESSLE | 1 EACH | $800 | $1,899 | $1,500 | $1,500 | $1,719 | $2,200 | $2,100 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 12 EACH | $265 | $414 | $300 | $285 | $375 | $448 | $285 |
| 630E80100 SIGN, FLAT SHEET | 70 SF | $26.00 | $23.75 | $16.00 | $15.00 | $21.50 | $26.00 | $15.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 4 EACH | $1,060 | $149 | $180 | $165 | $135 | $288 | $164 |
| 632E05006 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $950 | $839 | $750 | $700 | $760 | $812 | $1,100 |
| 632E05086 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 8 EACH | $1,400 | $1,302 | $1,200 | $1,250 | $1,179 | $1,414 | $1,300 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 12 EACH | $700 | $515 | $500 | $555 | $466 | $509 | $560 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 15 EACH | $37.00 | $13.75 | $50.00 | $40.00 | $12.45 | $18.00 | $22.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 12 EACH | $37.00 | $13.75 | $40.00 | $40.00 | $12.45 | $18.00 | $24.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 12 EACH | $370 | $361 | $270 | $275 | $327 | $366 | $230 |
| 632E40200 SIGNAL CABLE, 2 CONDUCTOR, NO. 14 AWG | 1,983 FT | $2.00 | $2.25 | $3.00 | $1.75 | $1.97 | $3.70 | $2.25 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 2,706 FT | $2.00 | $2.50 | $3.00 | $2.65 | $2.18 | $5.80 | $2.35 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 2,382 FT | $3.00 | $3.25 | $3.00 | $3.15 | $2.96 | $6.40 | $2.80 |
| 632E64020 PEDESTAL FOUNDATION | 6 EACH | $1,000 | $1,231 | $800 | $950 | $1,115 | $1,377 | $930 |
| 632E69300 POWER CABLE, 3 CONDUCTOR, NO. 4 AWG | 100 FT | $13.00 | $9.75 | $8.00 | $8.00 | $8.82 | $9.40 | $4.00 |
| 632E69900 SERVICE CABLE, 3 CONDUCTOR, NO. 4 AWG | 215 FT | $13.00 | $9.75 | $8.00 | $8.00 | $8.82 | $9.60 | $1.75 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,900 | $2,853 | $3,000 | $6,200 | $2,583 | $2,979 | $4,200 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $530 | $533 | $500 | $425 | $482 | $550 | $335 |
| 632E72110 SIGNAL SUPPORT, TYPE TC-81.22, DESIGN 4 | 1 EACH | $12,000 | $14,676 | $12,800 | $11,000 | $13,286 | $18,024 | $12,000 |
| 632E89300 WOOD POLE | 1 EACH | $1,600 | $1,158 | $1,800 | $2,500 | $1,049 | $1,768 | $4,200 |
| 632E89800 PEDESTAL, 3', TRANSFORMER BASE | 2 EACH | $846 | $761 | $800 | $600 | $689 | $757 | $350 |
| 632E89904 PEDESTAL, 10', TRANSFORMER BASE | 4 EACH | $1,600 | $1,594 | $1,700 | $750 | $1,443 | $1,717 | $650 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $2,100 | $3,924 | $5,000 | $3,500 | $3,552 | $3,948 | $3,600 |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $11,100 | $11,908 | $12,500 | $11,025 | $10,780 | $14,332 | $10,500 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $2,100 | $2,346 | $2,500 | $3,400 | $2,124 | $2,323 | $2,000 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $530 | $579 | $500 | $950 | $524 | $777 | $200 |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $2,100 | $2,058 | $2,200 | $2,900 | $1,863 | $2,121 | $2,000 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $6,800 | $7,191 | $7,400 | $7,500 | $6,510 | $7,000 | $6,000 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $5,000 | $4,677 | $7,000 | $4,850 | $4,234 | $4,748 | $4,500 |
| 809E69201 EMERGENCY VEHICLE PREEMPTION, AS PER PLAN | 1 EACH | $2,600 | $898 | $750 | $3,500 | $813 | $862 | $3,000 |
| 809E69211 PREEMPT RECEIVING UNIT, AS PER PLAN | 4 EACH | $1,100 | $693 | $650 | $750 | $627 | $774 | $640 |
| 809E69221 PREEMPT DETECTOR CABLE, AS PER PLAN | 302 FT | $2.00 | $2.00 | $2.50 | $1.95 | $1.70 | $2.40 | $2.35 |
| 809E69231 PREEMPT PHASE SELECTOR, AS PER PLAN | 4 EACH | $2,100 | $1,745 | $20.00 | $500 | $1,580 | $1,917 | $1,600 |
| 809E69241 PREEMPT CONFIRMATION LIGHT, AS PER PLAN | 4 EACH | $630 | $486 | $450 | $725 | $440 | $593 | $335 |
| 625E32000 GROUND ROD | 11 EACH | $240 | $213 | $260 | $500 | $913 | $178 | $75.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 160 HOUR | $69.00 | $71.75 | $65.00 | $60.00 | $75.00 | $118 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $2,300 | $9,500 | $5,000 | $3,950 | $2,200 | $18,774 | $2,200 |
| 614E12460 WORK ZONE MARKING SIGN | 10 EACH | $80.00 | $190 | $210 | $200 | $75.00 | $247 | $75.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $1,121 | $780 | $750 | $900 | $1,164 | $900 |
| 614E20010 WORK ZONE LANE LINE, CLASS I, 6" | 0.03 MILE | $2,600 | $13,962 | $1,800 | $1,800 | $2,500 | $4,958 | $1,800 |
| 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT | 0.1 MILE | $4,200 | $2,905 | $1,200 | $1,100 | $4,000 | $4,433 | $1,100 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.03 MILE | $8,500 | $14,537 | $11,000 | $10,500 | $8,000 | $8,548 | $10,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.1 MILE | $6,300 | $3,209 | $5,800 | $5,500 | $6,000 | $7,764 | $5,500 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.27 MILE | $2,600 | $14,332 | $7,200 | $6,800 | $2,500 | $3,767 | $6,800 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.2 MILE | $2,600 | $3,016 | $3,000 | $2,800 | $2,500 | $3,436 | $2,800 |
| 614E23010 WORK ZONE CHANNELIZING LINE, CLASS I, 12" | 958 FT | $1.00 | $0.75 | $2.50 | $2.20 | $0.75 | $2.40 | $2.20 |
| 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA | 150 FT | $1.00 | $0.75 | $1.00 | $0.95 | $1.00 | $2.00 | $0.95 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 50 FT | $5.00 | $3.25 | $4.50 | $4.00 | $5.00 | $7.90 | $4.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 4 EACH | $31.00 | $82.75 | $63.00 | $60.00 | $30.00 | $110 | $60.00 |
| 616E10000 WATER | 4 MGAL | $240 | $29.75 | $63.00 | $50.00 | $5.00 | $8.00 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,300 | $21,000 | $15,000 | $29,900 | $5,500 | $27,622 | $5,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $16,000 | $32,500 | $22,000 | $40,000 | $12,000 | $27,221 | $30,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (391 CY | $156 | $61k | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 281 CY | $197 | $55k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 174 CY | $215 | $37k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 12 MNTH | $3,000 | $36k | 3% |
| 632E79130 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $17,000 | $34k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $34,000 | $34k | 3% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,400 | $30k | 3% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $7,200 | $29k | 3% |
| 203E10000 EXCAVATION | 818 CY | $34 | $28k | 2% |