ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 107 more items below.
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company | R3John R Jurgensen Company | % of bid |
|---|---|---|---|---|---|
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 139 CY | $320 | $305 | $305 | 10% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,500 | $7,100 | $7,760 | 9% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,150 | $6,800 | $7,410 | 8% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $18,200 | $25,000 | $18,200 | 8% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 453 FT |
| Item | Quantity | R1Bansal Construction INC | R2Complete General Construction Company | R3John R Jurgensen Company |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 383 SY | $18.90 | $36.00 | $64.12 |
| 202E30800 TRAFFIC ISLAND REMOVED | 168 SY | $18.90 | $25.00 | $91.71 |
| 202E32000 CURB REMOVED | 15 FT | $10.50 | $22.00 | $47.75 |
| 202E32500 CURB AND GUTTER REMOVED | 649 FT | $10.50 | $10.00 | $11.44 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $420 | $380 | $1,506 |
| 203E10000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $75.00 |
| $100 |
| $75.00 |
| 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 8" | 111 CY | $268 | $255 | $255 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $35,000 | $154,053 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | 4% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 573 FT | $33.60 | $43.00 | $38.38 | 4% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 26 CY | $700 | $667 | $667 | 4% |
| 608E52000 CURB RAMP | 792 SF | $21.00 | $16.00 | $19.92 | 4% |
| 608E10000 4" CONCRETE WALK | 2,418 SF | $6.83 | $11.00 | $9.61 | 4% |
| 659E00300 TOPSOIL | 332 CY | $48.30 | $43.00 | $5.00 | 4% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 200 HOUR | $75.00 | $80.00 | $151 | 3% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $14,980 | $15,250 | $14,980 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 15 EACH | $990 | $765 | $990 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 2,778 SY | $5.25 | $5.00 | $5.00 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $13,025 | $11,700 | $13,025 | 3% |
| 609E54000 6" CONCRETE TRAFFIC ISLAND | 142 SY | $78.75 | $84.00 | $69.00 | 3% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 147 SY | $73.50 | $125 | $106 | 2% |
| 169 CY |
| $28.35 |
| $47.00 |
| $80.56 |
| 203E20000 EMBANKMENT | 17 CY | $52.50 | $39.00 | $71.42 |
| 204E10000 SUBGRADE COMPACTION | 769 SY | $4.20 | $4.00 | $9.99 |
| 204E45000 PROOF ROLLING | 1 HOUR | $158 | $315 | $315 |
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $210 | $200 | $200 |
| 659E10000 SEEDING AND MULCHING | 2,984 SY | $2.10 | $7.25 | $2.45 |
| 659E14000 REPAIR SEEDING AND MULCHING | 2,984 SY | $1.05 | $1.00 | $1.00 |
| 659E15000 INTER-SEEDING | 2,984 SY | $0.01 | $1.00 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.16 TON | $525 | $850 | $500 |
| 659E31000 LIME | 0.9 ACRE | $420 | $150 | $200 |
| 659E35000 WATER | 1.9 MGAL | $78.75 | $3.00 | $1.00 |
| 659E40000 MOWING | 29 MSF | $10.50 | $200 | $1.00 |
| 690E98800 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 32 TON | $184 | $265 | $36.50 |
| 611E04400 12" CONDUIT, TYPE B | 11 FT | $147 | $207 | $216 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $4,410 | $6,700 | $5,094 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 946 FT | $3.15 | $2.50 | $1.89 |
| 304E20000 AGGREGATE BASE, 6" | 71 CY | $89.25 | $98.00 | $226 |
| 407E10000 TACK COAT | 296 GAL | $5.25 | $5.00 | $5.00 |
| 605E05100 4" SHALLOW PIPE UNDERDRAINS | 296 FT | $15.75 | $16.50 | $48.50 |
| 609E26000 CURB, TYPE 6 | 15 FT | $42.00 | $66.00 | $49.92 |
| 613E41200 LOW STRENGTH MORTAR BACKFILL | 79 CY | $105 | $128 | $310 |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 2 EACH | $341 | $325 | $575 |
| 630E79101 SIGN HANGER ASSEMBLY, MAST ARM, AS PER PLAN | 1 EACH | $368 | $350 | $645 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 4 EACH | $131 | $125 | $175 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 5 EACH | $446 | $425 | $295 |
| 630E80100 SIGN, FLAT SHEET | 36 SF | $31.50 | $30.00 | $25.00 |
| 630E80500 SIGN, DOUBLE FACED, STREET NAME | 4 EACH | $410 | $390 | $225 |
| 630E80501 SIGN, DOUBLE FACED, STREET NAME, AS PER PLAN | 1 EACH | $567 | $540 | $245 |
| 630E83000 COVERING OF SIGN | 56 SF | $10.50 | $10.00 | $4.05 |
| 630E87000 REMOVAL OF OVERHEAD MOUNTED SIGN AND STORAGE | 4 EACH | $131 | $125 | $215 |
| 644E00104 EDGE LINE, 6" | 0.1 MILE | $8,694 | $8,280 | $6,600 |
| 644E00204 LANE LINE, 6" | 0.07 MILE | $6,662 | $6,345 | $4,000 |
| 644E00300 CENTER LINE | 0.09 MILE | $9,534 | $9,080 | $8,800 |
| 644E00400 CHANNELIZING LINE, 8" | 750 FT | $2.36 | $2.25 | $1.75 |
| 644E00500 STOP LINE | 212 FT | $6.30 | $6.00 | $6.34 |
| 644E00600 CROSSWALK LINE | 490 FT | $4.20 | $4.00 | $3.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 50 FT | $6.04 | $5.75 | $7.00 |
| 644E01300 LANE ARROW | 15 EACH | $131 | $125 | $95.00 |
| 644E01514 DOTTED LINE, 8" | 400 FT | $2.31 | $2.20 | $2.25 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 366 FT | $2.94 | $2.80 | $1.57 |
| 644E50300 PAVEMENT MARKING, MISC.:REMOVAL, AS PER PLAN | 1,030 FT | $2.94 | $2.80 | $1.57 |
| 646E10110 LANE LINE, 6" | 0.07 MILE | $24,119 | $22,970 | $12,639 |
| 646E10200 CENTER LINE | 0.07 MILE | $25,804 | $24,575 | $25,278 |
| 646E10300 CHANNELIZING LINE, 8" | 145 FT | $6.09 | $5.80 | $6.90 |
| 646E10620 CHEVRON MARKING | 30 FT | $14.75 | $14.05 | $28.90 |
| 625E00450 CONNECTION, FUSED PULL APART | 10 EACH | $100 | $111 | $100 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 13 EACH | $115 | $105 | $115 |
| 625E10490 LIGHT POLE, CONVENTIONAL, 24', TRUSS ARM HIGH RISE | 3 EACH | $2,525 | $2,325 | $2,525 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 1 EACH | $1,500 | $1,950 | $1,500 |
| 625E14600 LIGHT POLE FOUNDATION, MISC.: LIGHT POLE FOUNDATIO | 2 EACH | $1,750 | $2,200 | $1,750 |
| 625E18200 BRACKET ARM, 15' | 5 EACH | $640 | $975 | $640 |
| 625E18501 BRACKET ARM, 25', AS PER PLAN | 2 EACH | $2,475 | $1,650 | $2,475 |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 2,120 FT | $3.20 | $6.00 | $3.20 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,110 FT | $1.70 | $3.00 | $1.70 |
| 625E25400 CONDUIT, 2", 725.04 | 95 FT | $15.50 | $40.00 | $15.50 |
| 625E25500 CONDUIT, 3", 725.04 | 36 FT | $30.25 | $68.00 | $30.25 |
| 625E25600 CONDUIT, 4", 725.04 | 101 FT | $41.50 | $75.00 | $41.50 |
| 625E27521 REMOVAL OF LUMINAIRE AND REERECTION, AS PER PLAN | 7 EACH | $500 | $150 | $350 |
| 625E29000 TRENCH | 214 FT | $10.50 | $8.00 | $10.50 |
| 625E30700 PULL BOX, 725.08, 18" | 2 EACH | $800 | $1,100 | $800 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 1 EACH | $2,380 | $2,600 | $2,380 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,030 | $1,320 | $1,030 |
| 625E30707 PULL BOX, 725.08, 24", AS PER PLAN | 2 EACH | $2,810 | $2,895 | $2,810 |
| 625E31510 PULL BOX REMOVED | 11 EACH | $150 | $150 | $150 |
| 625E32000 GROUND ROD | 7 EACH | $290 | $250 | $290 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 214 FT | $0.40 | $2.00 | $0.40 |
| 625E75400 LIGHT POLE REMOVED | 4 EACH | $750 | $325 | $750 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,480 | $1,195 | $1,480 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 4 EACH | $550 | $585 | $550 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $50.00 | $35.00 | $50.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 4 EACH | $50.00 | $30.00 | $50.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 4 EACH | $225 | $275 | $225 |
| 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG | 401 FT | $1.80 | $2.25 | $1.80 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 1,465 FT | $2.00 | $3.00 | $2.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 444 FT | $2.25 | $3.75 | $2.25 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 1 EACH | $7,000 | $7,000 | $5,500 |
| 632E64011 SIGNAL SUPPORT FOUNDATION, AS PER PLAN | 1 EACH | $7,500 | $7,000 | $5,750 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $1,250 | $1,850 | $1,250 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 60 FT | $3.00 | $5.50 | $3.00 |
| 632E69320 POWER CABLE, 3 CONDUCTOR, NO. 2 AWG | 30 FT | $6.80 | $13.15 | $6.80 |
| 632E69700 SERVICE CABLE, 3 CONDUCTOR, NO. 8 AWG | 40 FT | $2.90 | $7.00 | $2.90 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $4,500 | $2,600 | $4,500 |
| 632E89251 POLE ENTRANCE FITTING, AS PER PLAN | 1 EACH | $565 | $500 | $565 |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 1 EACH | $1,175 | $925 | $1,175 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: STRA | 1 EACH | $1,175 | $995 | $1,175 |
| 632E90020 REMOVAL OF MISCELLANEOUS TRAFFIC SIGNAL ITEM: WOOD | 1 EACH | $750 | $400 | $750 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $5,000 | $3,000 | $5,000 |
| 632E90209 REUSE OF STRAIN POLE, AS PER PLAN | 4 EACH | $2,500 | $1,200 | $1,500 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,425 | $2,900 | $1,425 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $850 | $1,500 | $850 |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN | 1 EACH | $7,800 | $6,600 | $7,800 |
| 804E30011 FAN-OUT KIT, 12 FIBER, AS PER PLAN | 1 EACH | $75.00 | $130 | $75.00 |
| 804E32011 DROP CABLE, 12 FIBER, AS PER PLAN | 1 EACH | $1,500 | $1,450 | $1,500 |
| 804E35001 FUSION SPLICE, AS PER PLAN | 4 EACH | $100 | $210 | $100 |
| 804E37001 SPLICE ENCLOSURE, AS PER PLAN | 1 EACH | $900 | $1,400 | $900 |
| 804E37501 FIBER OPTIC CONNECTOR, AS PER PLAN | 8 EACH | $100 | $175 | $100 |
| 804E98000 FIBER OPTIC CABLE, MISC.:SLACK INSTALLATION, 12 FI | 100 FT | $25.00 | $7.00 | $25.00 |
| 809E60001 CCTV IP-CAMERA SYSTEM, DOME-TYPE, AS PER PLAN | 1 EACH | $5,560 | $9,250 | $5,560 |
| 809E69123 ATC CONTROLLER, AS PER PLAN | 1 EACH | $4,650 | $4,500 | $4,650 |
| 616E10000 WATER | 1 MGAL | $75.00 | $1,050 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,917 | $4,300 | $8,720 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $8,000 | $15,333 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 442E10500 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4 | 139 CY | $320.25 | $45k | 6% |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,500 | $38k | 5% |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 4 EACH | $9,150 | $37k | 5% |
| 632E79151 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 2 EACH | $18,200 | $36k | 5% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 453 FT | $75 | $34k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22, 8" | 111 CY | $267.75 | $30k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 573 FT | $33.6 | $19k | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 26 CY | $700.35 | $18k | 3% |