JEF-SR 7-10.37 Ramp B
JEF County · est $0.2M
Bid dateThursday, December 16—
JEF County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 7 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Litman Excavating INC | R5Suburban Maintenance & Construction | R6INC Dot Construction CORP | R7Craig Edward Susany INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: STEEL PILES W14X68, FURNISHED | 1,190 FT | $60.00 | $50.00 | $60.00 | $58.00 | $62.00 | $60.00 | $68.00 | 38% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 733 FT | $35.00 | $37.00 | $39.00 | $44.00 | $50.00 | $100 | $125 | 14% |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Litman Excavating INC | R5Suburban Maintenance & Construction | R6INC Dot Construction CORP | R7Craig Edward Susany INC |
|---|---|---|---|---|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 39 SY | $35.00 | $20.00 | $18.00 | $49.00 | $8.50 | $50.00 | $50.00 |
| 204E10000 SUBGRADE COMPACTION | 301 SY | $2.50 | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 | $5.00 |
| 832E30000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER |
| 340 FT |
| $51.00 |
| $70.00 |
| $59.00 |
| $44.00 |
| $90.00 |
| $100 |
| $125 |
| 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 70 CY | $210 | $298 | $298 | $326 | $300 | $298 | $400 | 8% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 45 CY | $200 | $160 | $175 | $300 | $250 | $200 | $250 | 5% |
| 304E20000 AGGREGATE BASE | 49 CY | $135 | $100 | $115 | $69.00 | $95.00 | $100 | $200 | 3% |
| 202E23000 PAVEMENT REMOVED | 272 SY | $24.00 | $15.00 | $10.00 | $49.50 | $10.00 | $50.00 | $50.00 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $1,700 | $2,100 | $1,600 | $1,700 | $2,300 | $1,050 | $1,800 | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 18 CY | $265 | $588 | $588 | $642 | $600 | $588 | $660 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $20,000 | $10,000 | $2,500 | $15,000 | $20,000 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $2,000 | $2,200 | $10,936 | $5,000 | $2,500 | $11,000 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (13 CY | $265 | $328 | $328 | $358 | $400 | $328 | $450 | 2% |
| 614E12420 DETOUR SIGNING | 1 LS | $2,600 | $4,000 | $2,500 | $2,250 | $7,000 | $4,830 | $10,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,600 | $5,000 | $2,500 | $2,750 | $10,000 | $10,000 | $4,000 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $800 | $500 | $3,850 | $1,140 | $100 | $1,000 | $3,000 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.25") | 234 SY | $10.00 | $28.00 | $28.00 | $30.00 | $32.00 | $28.00 | $65.00 | 1% |
| 646E10010 EDGE LINE, 6" | 0.07 MILE | $30,000 | $26,900 | $26,900 | $4,250 | $10,000 | $64,000 | $20,000 | 1% |
| 203E10000 EXCAVATION | 52 CY | $35.00 | $36.00 | $25.00 | $49.00 | $10.00 | $50.00 | $125 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,700 | $2,000 | $1,800 | $1,000 | $5,000 | $2,500 | $100 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $4,000 | $4,500 | $2,500 | $4,000 | $2,000 | $4,000 | 1% |
| 1,000 EACH |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| $1.00 |
| 407E10000 TACK COAT | 65 GAL | $6.00 | $2.00 | $2.00 | $2.40 | $2.50 | $2.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 16 GAL | $20.00 | $39.00 | $39.00 | $42.50 | $40.00 | $39.00 | $40.00 |
| 617E10100 COMPACTED AGGREGATE | 9 CY | $145 | $220 | $130 | $75.00 | $100 | $100 | $330 |
| 616E10000 WATER | 10 MGAL | $10.00 | $0.10 | $40.00 | $60.00 | $1.00 | $1.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: STEEL PILES W14X68, FURNISHED | 1,190 FT | $60 | $71k | 37% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 733 FT | $35 | $26k | 13% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 340 FT | $51 | $17k | 9% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 70 CY | $210 | $15k | 8% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 45 CY | $200 | $9k | 5% |
| 304E20000 AGGREGATE BASE | 49 CY | $135 | $7k | 3% |
| 202E23000 PAVEMENT REMOVED | 272 SY | $24 | $7k | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 3 SNMT | $1,700 | $5k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 18 CY | $265 | $5k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 2% |