TRU-SR 5-06.41/06.63
TRU County · est $0.6M
Bid dateThursday, December 16—
TRU County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Shook Company LLC | R3Jet Excavating Company | % of bid |
|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 6,512 CY | $17.25 | $20.00 | $25.00 | 22% |
| 203E10000 EXCAVATION | 5,940 CY | $12.30 | $20.00 | $18.00 | 14% |
| 203E35000 GRANULAR EMBANKMENT, (NO. 57 STONE) | 577 CY | $81.00 | $80.00 | $85.00 | 9% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,010 FT | $35.00 | $10.00 | $18.00 | 7% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 310 CY | $73.00 | $70.00 | $110 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $20,000 | $25,000 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $21,118 | $20,000 | $21,000 |
| Item | Quantity | R1Eclipse CO LLC | R2Shook Company LLC | R3Jet Excavating Company |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 239 SY | $9.00 | $25.00 | $25.00 |
| 202E38000 GUARDRAIL REMOVED | 650 FT | $2.00 | $2.00 | $2.50 |
| 204E10000 SUBGRADE COMPACTION | 306 SY | $2.00 | $2.00 | $3.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $255 | $100 | $50.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE A | 3,654 SY | $1.00 | $7.00 | $1.75 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 39 CY | $528 | $285 | $475 | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 650 FT | $28.00 | $24.00 | $28.50 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $15,000 | $10,000 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 41 CY | $425 | $375 | $425 | 3% |
| 659E00300 TOPSOIL | 395 CY | $44.00 | $40.00 | $40.00 | 3% |
| 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY | 1 LS | $15,000 | $1,000 | $4,000 | 3% |
| 832E30000 EROSION CONTROL | 12,000 EACH | $1.00 | $1.00 | $1.00 | 2% |
| 441E50700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (19 CY | $577 | $425 | $600 | 2% |
| 671E15040 EROSION CONTROL MAT, TYPE E | 3,557 SY | $3.00 | $5.00 | $2.00 | 2% |
| 611E01500 6" CONDUIT, TYPE F, 707.41 (PERFORATED) | 1,000 FT | $10.00 | $15.00 | $8.00 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $15,000 | $10,000 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $66.00 | $50.00 | $70.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,500 | $15,153 | $15,000 | 2% |
| 6 SY |
| $239 |
| $300 |
| $175 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $26.00 | $10.00 | $50.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 178 SY | $3.00 | $2.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.48 TON | $263 | $1,000 | $750 |
| 659E31000 LIME | 0.73 ACRE | $26.00 | $1,000 | $250 |
| 659E35000 WATER | 19 MGAL | $1.00 | $1.00 | $1.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,250 | $2,500 | $1,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $6,800 | $2,500 | $4,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,250 | $1,000 | $6,500 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 20 FT | $22.00 | $10.00 | $20.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 500 FT | $18.00 | $10.00 | $16.00 |
| 605E31100 AGGREGATE DRAINS | 20 FT | $12.50 | $20.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 97 FT | $25.00 | $15.00 | $18.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $93.00 | $250 | $300 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 245 SY | $32.00 | $30.00 | $19.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 519 FT | $2.00 | $5.00 | $2.00 |
| 304E20000 AGGREGATE BASE | 45 CY | $83.00 | $60.00 | $125 |
| 407E20000 NON-TRACKING TACK COAT | 85 GAL | $12.25 | $3.00 | $10.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,080 | $1,800 | $2,875 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $247 | $100 | $150 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 63 EACH | $16.25 | $10.00 | $15.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 21 EACH | $20.25 | $7.00 | $20.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 4 SNMT | $1,040 | $1,000 | $950 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 1.34 MILE | $1,405 | $1,000 | $1,100 |
| 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT | 1,320 FT | $0.55 | $1.00 | $0.60 |
| 616E10000 WATER | 1 MGAL | $115 | $1.00 | $1.00 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $650 | $1,300 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 6,512 CY | $17.25 | $112k | 19% |
| 203E10000 EXCAVATION | 5,940 CY | $12.3 | $73k | 13% |
| 203E35000 GRANULAR EMBANKMENT, (NO. 57 STONE) | 577 CY | $81 | $47k | 8% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,010 FT | $35 | $35k | 6% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 310 CY | $73 | $23k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $22,500 | $23k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $21,118 | $21k | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 39 CY | $528 | $21k | 4% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 650 FT | $28 | $18k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $18,000 | $18k | 3% |