TUS-SR 800-27.11
TUS County · est $0.2M
Bid dateThursday, January 28—
TUS County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 9 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Suburban Maintenance & Construction | R4INC Craig Edward Susany INC | R5Alan Stone CO INC | R6Shelly & Sands INC | R7Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,410 FT | $28.80 | $30.00 | $27.00 | $37.75 | $30.00 | $29.00 | $34.00 | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $28,331 | $19,000 | $26,000 | $29,000 | $38,000 | $30,000 | $21,100 | 14% |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Suburban Maintenance & Construction | R4INC Craig Edward Susany INC | R5Alan Stone CO INC | R6Shelly & Sands INC | R7Rudzik Excavating INC |
|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 175 FT | $3.00 | $2.00 | $2.00 | $2.00 | $3.50 | $2.50 | $3.00 |
| 204E10000 SUBGRADE COMPACTION | 101 SY | $4.50 | $8.00 | $5.00 | $3.00 | $2.00 | $3.50 | $2.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 564 FT |
| $46.50 |
| $60.00 |
| $65.00 |
| $65.00 |
| $57.00 |
| $57.00 |
| $63.03 |
| 13% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 752 FT | $32.00 | $50.00 | $44.00 | $35.00 | $51.00 | $43.00 | $63.03 | 12% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 24" DIAMETER, UNR | 552 FT | $36.00 | $50.00 | $41.00 | $35.00 | $50.00 | $48.00 | $71.61 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $10,000 | $16,000 | $10,000 | $10,000 | $10,000 | $22,517 | 10% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 162.5 FT | $34.00 | $34.00 | $36.00 | $32.00 | $32.00 | $32.00 | $37.00 | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $435 | $120 | $200 | $400 | $350 | $150 | $50.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,950 | $100 | $5,200 | $1.00 | $2,100 | $5,296 | $6,750 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $326 | $400 | $355 | $450 | $400 | $1,000 | $375 | 2% |
| 202E23000 PAVEMENT REMOVED | 67 SY | $55.50 | $18.00 | $5.00 | $10.00 | $12.00 | $20.00 | $8.00 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 13 CY | $231 | $300 | $517 | $400 | $525 | $900 | $540 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,935 | $3,000 | $5,000 | $7,000 | $1,500 | $2,198 | $6,800 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 1 EACH | $2,835 | $2,800 | $5,000 | $2,200 | $2,600 | $2,200 | $3,100 | 1% |
| 621E00100 RPM | 6 EACH | $462 | $175 | $500 | $450 | $450 | $450 | $600 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 417 SY | $5.50 | $5.00 | $2.50 | $3.00 | $1.50 | $5.90 | $4.00 | 1% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" DEPTH | 268 SY | $8.50 | $14.00 | $14.00 | $27.00 | $15.00 | $25.00 | $15.00 | 1% |
| 304E20000 AGGREGATE BASE | 15 CY | $75.50 | $130 | $65.00 | $150 | $136 | $175 | $92.75 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 50 FT | $22.50 | $24.00 | $17.00 | $23.00 | $22.00 | $20.00 | $25.00 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 207 FT |
| $3.00 |
| $5.00 |
| $2.00 |
| $3.00 |
| $5.50 |
| $3.00 |
| $2.00 |
| 407E10000 TACK COAT | 34 GAL | $2.00 | $2.50 | $2.25 | $5.00 | $4.50 | $3.00 | $3.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 6 EACH | $17.50 | $20.00 | $75.00 | $10.00 | $48.00 | $30.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, (BIDIRECTIONAL) | 3 EACH | $13.50 | $20.00 | $10.00 | $10.00 | $16.50 | $10.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.04 MILE | $17,875 | $14,000 | $20,000 | $18,000 | $7,600 | $17,400 | $14,300 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $18,100 | $20,000 | $20,000 | $18,000 | $13,000 | $17,600 | $20,350 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $800 | $1,500 | $2,500 | $1,000 | $3,000 | $4,000 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,410 FT | $28.8 | $41k | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $28,331 | $28k | 14% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 564 FT | $46.5 | $26k | 13% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 752 FT | $32 | $24k | 12% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 24" DIAMETER, UNR | 552 FT | $36 | $20k | 10% |
| 624E10000 MOBILIZATION | 1 LS | $19,500 | $20k | 10% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 162.5 FT | $34 | $6k | 3% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $435 | $4k | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,950 | $4k | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 12 CY | $326 | $4k | 2% |