BEL-CR 214-06.58
BEL County · est $0.2M
Bid dateThursday, March 11—
BEL County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Litman Excavating INC | R4Shelly & Sands INC | R5Alan Stone CO INC | R6Skeens Excavating INC | R7Rudzik Excavating INC | R8R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: HP12x63, FURNISHED | 930 FT | $33.50 | $37.00 | $36.00 | $40.00 | $52.00 | $40.00 | $40.00 | $65.00 | 22% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 620 FT | $30.50 | $50.00 | $44.50 | $61.00 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Litman Excavating INC | R4Shelly & Sands INC | R5Alan Stone CO INC | R6Skeens Excavating INC | R7Rudzik Excavating INC | R8R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 163 FT | $3.00 | $2.00 | $15.00 | $2.50 | $4.00 | $5.00 | $3.00 | $5.00 |
| 203E20000 EMBANKMENT | 5 CY | $62.00 | $30.00 | $238 | $100 | $16.00 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $52.50 |
| $100 |
| $120 |
| $125 |
| 13% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 310 FT | $52.00 | $80.00 | $60.00 | $95.00 | $214 | $100 | $120 | $125 | 11% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER, UN | 290 FT | $46.00 | $50.00 | $59.00 | $61.00 | $57.50 | $100 | $136 | $100 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $12,800 | $10,500 | $5,000 | $4,000 | $17,000 | $39,500 | $19,852 | $15,000 | 9% |
| 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 162.5 FT | $44.00 | $46.00 | $83.00 | $42.40 | $61.50 | $45.00 | $51.00 | $55.00 | 5% |
| 611E07201 18" CONDUIT, TYPE A, AS PER PLAN, 707.33 | 38 FT | $170 | $225 | $116 | $200 | $221 | $120 | $165 | $195 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 19 CY | $290 | $400 | $394 | $435 | $655 | $520 | $426 | $375 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $1,000 | $4,500 | $4,500 | $1,200 | $3,000 | $10,000 | $2,500 | 4% |
| 304E20000 AGGREGATE BASE | 49 CY | $90.00 | $130 | $50.00 | $100 | $149 | $50.00 | $89.00 | $100 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,500 | $5,000 | $3,450 | $6,500 | $4,400 | $4,000 | $10,800 | $25,000 | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 7 CY | $425 | $500 | $605 | $655 | $800 | $520 | $545 | $750 | 2% |
| 204E30010 GRANULAR MATERIAL, TYPE B | 19 CY | $130 | $110 | $163 | $70.00 | $158 | $50.00 | $70.00 | $100 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $2,500 | $1,500 | $1,899 | $2,000 | $3,000 | $3,300 | $9,500 | 1% |
| 202E23000 PAVEMENT REMOVED | 147 SY | $12.00 | $18.00 | $32.65 | $14.00 | $6.00 | $30.00 | $10.00 | $20.00 | 1% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 4 CY | $395 | $300 | $582 | $180 | $183 | $150 | $375 | $100 | 1% |
| 203E10000 EXCAVATION | 49 CY | $31.00 | $25.00 | $103 | $30.00 | $18.00 | $50.00 | $100 | $20.00 | 1% |
| 204E30040 GRANULAR MATERIAL, TYPE E | 19 CY | $78.00 | $110 | $163 | $70.00 | $145 | $50.00 | $60.00 | $100 | 1% |
| 602E20000 CONCRETE MASONRY | 0.4 CY | $3,500 | $1,500 | $350 | $1,500 | $1,800 | $2,500 | $3,000 | $1,500 | 1% |
| $100 |
| $25.00 |
| 204E10000 SUBGRADE COMPACTION | 272 SY | $4.00 | $3.00 | $1.50 | $7.00 | $3.00 | $2.00 | $3.00 | $2.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 38 CY | $19.00 | $25.00 | $92.00 | $30.00 | $23.50 | $20.00 | $60.00 | $25.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $365 | $100 | $3,058 | $175 | $320 | $500 | $200 | $25.00 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 147 SY | $8.00 | $12.00 | $5.00 | $11.50 | $11.50 | $20.00 | $5.50 | $10.00 |
| 407E10000 TACK COAT | 9 GAL | $35.00 | $3.00 | $3.00 | $2.00 | $3.50 | $5.00 | $4.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 12 GAL | $27.00 | $55.00 | $14.00 | $48.00 | $58.00 | $5.00 | $74.00 | $10.00 |
| 423E00204 CRACK SEALING, TYPE II | 6 SY | $43.00 | $150 | $69.00 | $410 | $295 | $100 | $200 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 5 EACH | $10.00 | $10.00 | $15.00 | $7.50 | $11.00 | $20.00 | $10.00 | $25.00 |
| 642E00100 EDGE LINE, 4", TYPE 1 | 0.02 MILE | $26,500 | $25,000 | $29,500 | $25,650 | $37,000 | $40,000 | $28,250 | $25,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $27,500 | $25,000 | $30,500 | $26,500 | $39,000 | $40,000 | $29,150 | $25,000 |
| 616E10000 WATER | 5 MGAL | $2.00 | $10.00 | $1.00 | $25.00 | $0.30 | $10.00 | $5.00 | $1.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $2,000 | $4,500 | $4,500 | $4,500 | $4,000 | $2,000 | $12,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: HP12x63, FURNISHED | 930 FT | $33.5 | $31k | 21% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 620 FT | $30.5 | $19k | 13% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 310 FT | $52 | $16k | 11% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 24" DIAMETER, UN | 290 FT | $46 | $13k | 9% |
| 624E10000 MOBILIZATION | 1 LS | $12,800 | $13k | 9% |
| 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 162.5 FT | $44 | $7k | 5% |
| 611E07201 18" CONDUIT, TYPE A, AS PER PLAN, 707.33 | 38 FT | $170 | $6k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 19 CY | $290 | $6k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $5k | 3% |
| 304E20000 AGGREGATE BASE | 49 CY | $90 | $4k | 3% |