JEF-CR 53-07.45
JEF County · est $0.8M
Bid dateThursday, April 15—
JEF County · est $0.8M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Dennison Bridge INC | R5Craig Edward Susany INC | R6Suburban Maintenance & Construction | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 2,903 FT | $57.50 | $42.00 | $56.00 | $65.00 | $79.00 | $75.00 | 32% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 1,270 FT | $71.00 | $82.00 | $78.00 | $75.00 | $107 | $139 | 17% |
| 507E00400 STEEL PILES, MISC.: W21x93 STEEL BEAMS, FURNISHED | 4,470 FT | $17.00 | $54.50 |
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Dennison Bridge INC | R5Craig Edward Susany INC | R6Suburban Maintenance & Construction |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,600 | $2,000 | $5,600 | $1,000 | $1,000 | $15,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 51 FT | $19.00 | $20.00 | $3.50 | $10.00 | $20.00 | $30.00 |
| 204E10000 SUBGRADE COMPACTION | 250 SY | $3.50 | $5.00 | $7.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $53.50 |
| $60.00 |
| $55.00 |
| $67.00 |
| 14% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 1,220 FT | $57.00 | $65.00 | $65.00 | $75.00 | $79.00 | $75.00 | 13% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (68 CY | $282 | $180 | $246 | $192 | $220 | $260 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 49 CY | $344 | $200 | $296 | $201 | $220 | $260 | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 375 FT | $39.50 | $29.00 | $32.00 | $32.00 | $32.00 | $35.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $20,000 | $20,000 | $20,000 | $10,000 | $30,000 | 3% |
| 304E20000 AGGREGATE BASE | 99 CY | $130 | $84.00 | $125 | $110 | $120 | $70.00 | 2% |
| 611E07200 18" CONDUIT, TYPE A, 706.01, 706.02, 707.33, OR 70 | 51 FT | $235 | $107 | $150 | $125 | $110 | $145 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 3" | 1,388 SY | $5.50 | $5.00 | $6.00 | $4.00 | $8.00 | $12.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $1,200 | $8,500 | $2,500 | $4,000 | $10,000 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 25 CY | $186 | $250 | $286 | $350 | $230 | $260 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,900 | $8,000 | $4,852 | $10,000 | $25,000 | $18,000 | 1% |
| 202E38000 GUARDRAIL REMOVED | 400 FT | $6.50 | $4.00 | $3.00 | $2.00 | $2.00 | $2.00 | 0% |
| 602E20000 CONCRETE MASONRY | 0.7 CY | $3,100 | $1,000 | $2,000 | $2,250 | $1,500 | $2,500 | 0% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $2,100 | $1,300 | $1,670 | $1,300 | $1,300 | $1,800 | 0% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $2,000 | $3,800 | $3,200 | $1,500 | $4,000 | $15,000 | 0% |
| 202E23000 PAVEMENT REMOVED | 223 SY | $8.00 | $14.00 | $14.00 | $22.00 | $20.00 | $12.00 | 0% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 667 SY | $2.50 | $4.00 | $3.25 | $3.00 | $4.00 | $5.00 | 0% |
| $3.00 |
| $6.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 605E98300 UNDERDRAINS, MISC.: DRAIN EXTENSION THROUGH WALL | 4 EACH | $401 | $50.00 | $150 | $250 | $100 | $25.00 |
| 407E10000 TACK COAT | 166 GAL | $3.00 | $6.00 | $2.00 | $3.00 | $3.00 | $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 102 GAL | $7.50 | $7.00 | $8.00 | $8.00 | $8.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $16.00 | $7.50 | $13.00 | $10.00 | $10.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.23 MILE | $5,600 | $4,000 | $3,850 | $3,800 | $3,500 | $10,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $7,400 | $7,000 | $6,975 | $6,500 | $3,500 | $10,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 2,903 FT | $57.5 | $167k | 31% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 1,270 FT | $71 | $90k | 17% |
| 507E00400 STEEL PILES, MISC.: W21x93 STEEL BEAMS, FURNISHED | 4,470 FT | $17 | $76k | 14% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 1,220 FT | $57 | $70k | 13% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (68 CY | $282 | $19k | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 49 CY | $344 | $17k | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 375 FT | $39.5 | $15k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $14k | 3% |
| 304E20000 AGGREGATE BASE | 99 CY | $130 | $13k | 2% |
| 611E07200 18" CONDUIT, TYPE A, 706.01, 706.02, 707.33, OR 70 | 51 FT | $235 | $12k | 2% |