LUC-SIGN FY2022
LUC County · est $1.0M
Bid dateThursday, February 17—
LUC County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1Lake Erie Construction Company | % of bid |
|---|---|---|---|
| 630E80100 SIGN, FLAT SHEET | 19,191 SF | $11.50 | 22% |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 24,284 FT | $8.50 | 20% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1,500 EACH | $110 | 16% |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 1,200 EACH | $85.00 | 10% |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 150 EACH | $345 | 5% |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2,120 EACH | $20.00 | 4% |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,803 EACH | $20.00 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,820 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $26,500 | 3% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,594 EACH | $10.00 | 3% |
| 630E97900 SIGNING, MISC.:6" X 8" WOOD POST | 671 FT | $30.00 | 2% |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 886 EACH | $20.00 | 2% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 37 EACH | $465 | 2% |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 40 EACH | $295 | 1% |
| 630E87520 REMOVAL OF POLE MOUNTED SIGN AND REERECTION | 76 EACH | $145 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $10,515 | 1% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 112 EACH | $35.00 | 0% |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 40 EACH | $60.00 | 0% |
| 630E97900 SIGNING, MISC.:4" X 6" WOOD POST | 77 FT | $25.00 | 0% |
| 630E89702 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL | 1 EACH | $1,850 | 0% |
| Item | Quantity | R1Lake Erie Construction Company |
|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 188 FT | $2.50 |
| 630E81021 CONCRETE MEDIAN BARRIER SIGN BRACKET, AS PER PLAN | 1 EACH | $1,175 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 29 EACH | $15.00 |
| 631E94250 REMOVAL OF LUMINAIRE | 1 EACH | $100 |
| 631E94406 REMOVAL OF SIGNS WIRED | 1 EACH | $400 |
| 631E94470 REMOVAL OF SIGN SERVICE | 1 EACH | $525 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E80100 SIGN, FLAT SHEET | 19,191 SF | $11.5 | $221k | 22% |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 24,284 FT | $8.5 | $206k | 20% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 1,500 EACH | $110 | $165k | 16% |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 1,200 EACH | $85 | $102k | 10% |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 150 EACH | $345 | $52k | 5% |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2,120 EACH | $20 | $42k | 4% |
| 630E86003 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,803 EACH | $20 | $36k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,820 | $34k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $26,500 | $27k | 3% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,594 EACH | $10 | $26k | 3% |