STA-TR 211-01.97 (Fulton Dr)
STA County · est $2.0M
Bid dateThursday, March 17—
STA County · est $2.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 113 more items below.
| Item | Quantity | R1Stanley Miller Construction Company | R2Lockhart Concrete CO | R3Beaver Excavating Company | R4Black Horse Bridge Construction INC | % of bid |
|---|---|---|---|---|---|---|
| 611E96455 16' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN(3"-1 | 95 FT | $2,215 | $1,800 | $2,225 | $3,645 | 14% |
| 203E10000 EXCAVATION | 9,599 CY | $20.00 | $20.00 | $16.00 | $19.00 | 12% |
| 507E00400 STEEL PILES, MISC.:W18 PILES, GALVANIZED, FURNISHE | 993 FT | $157 | $200 | $180 | $160 | 10% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 676 FT | $213 | $250 | $200 | $155 |
| Item | Quantity | R1Stanley Miller Construction Company | R2Lockhart Concrete CO | R3Beaver Excavating Company | R4Black Horse Bridge Construction INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,722 | $25,000 | $42,500 | $2,600 |
| 202E23000 PAVEMENT REMOVED | 1,055 SY | $12.11 | $10.00 | $6.25 | $8.00 |
| 202E30000 WALK REMOVED | 1,173 SF | $1.14 | $1.00 | $2.00 | $1.00 |
| 202E32000 CURB REMOVED | 356 FT | $3.75 | $4.00 | $3.00 | $4.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 9% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 172 CY | $715 | $600 | $1,535 | $1,150 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $118,961 | $25,071 | $100,000 | $100,000 | 8% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $74,333 | $20,000 | $11,500 | $20,000 | 5% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 40,887 LB | $1.78 | $1.83 | $1.85 | $2.00 | 5% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 318 FT | $200 | $200 | $100 | $150 | 4% |
| 611E97400 CONDUIT, MISC.:14-INCH FORCE MAIN, DIP CLASS 52, M | 236 FT | $225 | $165 | $322 | $262 | 3% |
| 512E75010 SPECIAL - SEALING: STAINING OF CONCRETE SURFACES | 4,168 SF | $11.67 | $9.50 | $5.35 | $13.00 | 3% |
| 511E46512 CLASS QC1 CONCRETE WITH QC/QA, FOOTING | 154 CY | $299 | $1,000 | $365 | $425 | 3% |
| 530E51020 SPECIAL - RETAINING WALL, TIMBER LAGGING | 1,730 SF | $22.00 | $20.00 | $30.00 | $16.00 | 2% |
| 611E99690 MANHOLE, MISC.: SANITARY SEWER AIR RELEASE & AIR V | 1 EACH | $33,156 | $7,600 | $36,000 | $36,299 | 2% |
| 503E21100 UNCLASSIFIED EXCAVATION | 1,507 CY | $21.00 | $50.00 | $36.00 | $20.00 | 2% |
| 304E20000 AGGREGATE BASE | 348 CY | $81.00 | $67.00 | $93.00 | $110 | 2% |
| 517E74501 RAILING, CONCRETE, AS PER PLAN | 175 FT | $157 | $116 | $320 | $200 | 2% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 88 CY | $300 | $324 | $270 | $270 | 2% |
| 607E98000 FENCE, MISC.: WOOD RAILING | 185 FT | $138 | $125 | $125 | $125 | 2% |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN(PERMANEN | 693 SY | $35.50 | $32.00 | $26.50 | $20.00 | 2% |
| 500 FT |
| $9.00 |
| $5.00 |
| $15.00 |
| $32.00 |
| 202E58701 MANHOLE ABANDONED, AS PER PLAN | 2 EACH | $330 | $1,000 | $2,000 | $851 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 150 FT | $16.30 | $6.00 | $5.00 | $23.00 |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 300 FT | $8.15 | $10.00 | $10.00 | $23.00 |
| 202E98100 REMOVAL MISC.: PARK BENCH | 2 EACH | $67.00 | $250 | $150 | $250 |
| 202E98700 ABANDON MISC.: PIPE ABANDONED, 30" | 113 FT | $5.56 | $27.00 | $22.00 | $40.00 |
| 202E98700 ABANDON MISC.: PIPE ABANDONED, SCSED | 168 FT | $10.60 | $10.00 | $3.00 | $15.50 |
| 203E20000 EMBANKMENT | 329 CY | $10.65 | $15.00 | $10.00 | $35.00 |
| 203E35120 GRANULAR MATERIAL, TYPE C-703.16 | 40 CY | $75.00 | $50.00 | $65.00 | $87.00 |
| 204E10000 SUBGRADE COMPACTION | 2,087 SY | $1.00 | $2.00 | $4.00 | $5.50 |
| 204E45000 PROOF ROLLING | 1 HOUR | $100 | $150 | $200 | $165 |
| 204E50000 GEOTEXTILE FABRIC | 118 SY | $4.50 | $4.00 | $7.00 | $12.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 237.5 FT | $33.00 | $29.75 | $24.40 | $30.00 |
| 606E17350 GUARDRAIL, TYPE MGS, 25' LONG-SPAN | 25 FT | $42.75 | $38.50 | $28.00 | $39.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH | 1 EACH | $3,778 | $3,400 | $3,180 | $3,400 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $3,416 | $3,075 | $1,560 | $3,075 |
| 608E10000 4" CONCRETE WALK | 1,411 SF | $6.10 | $5.65 | $7.50 | $5.70 |
| 608E52000 CURB RAMP | 334 SF | $17.00 | $17.00 | $17.50 | $15.70 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $107 | $250 | $100 | $200 |
| 659E00300 TOPSOIL | 521 CY | $22.25 | $40.00 | $20.00 | $40.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 4,692 SY | $2.45 | $2.00 | $1.25 | $1.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 235 SY | $0.76 | $1.85 | $1.25 | $1.00 |
| 659E15000 INTER-SEEDING | 235 SY | $0.76 | $1.85 | $1.25 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.65 TON | $724 | $800 | $800 | $1,200 |
| 659E31000 LIME | 0.97 ACRE | $173 | $825 | $80.00 | $100 |
| 659E35000 WATER | 26 MGAL | $1.00 | $105 | $1.00 | $1.00 |
| 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E | 3,200 SY | $1.55 | $5.00 | $1.90 | $2.50 |
| 670E00750 DITCH EROSION PROTECTION MAT, TYPE E | 716 SY | $1.32 | $5.00 | $2.25 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,639 | $1,500 | $3,000 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $4,933 | $5,000 | $10,500 | $6,500 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,114 | $6,000 | $10,000 | $9,000 |
| 832E30001 EROSION CONTROL, AS PER PLAN | 15,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.25 CY | $1,173 | $2,100 | $2,100 | $1,748 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $3.00 | $25.00 | $20.00 | $14.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 356 FT | $20.00 | $18.00 | $15.00 | $14.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 50 FT | $25.00 | $18.00 | $25.00 | $15.00 |
| 611E04600 12" CONDUIT, TYPE C | 46 FT | $87.00 | $40.00 | $88.00 | $89.00 |
| 611E04900 12" CONDUIT, TYPE D | 60 FT | $82.00 | $40.00 | $67.00 | $77.00 |
| 611E13600 30" CONDUIT, TYPE C | 120 FT | $161 | $125 | $330 | $350 |
| 611E13600 30" CONDUIT, TYPE C, 706.02 | 20 FT | $161 | $125 | $270 | $1,035 |
| 611E13900 30" CONDUIT, TYPE D | 24 FT | $161 | $125 | $280 | $305 |
| 611E98470 CATCH BASIN, NO. 2-2B | 3 EACH | $1,405 | $1,900 | $1,300 | $1,761 |
| 611E98510 CATCH BASIN, NO. 2-3 | 2 EACH | $2,292 | $2,515 | $2,400 | $2,470 |
| 611E99574 MANHOLE, NO. 3 | 5 EACH | $4,845 | $4,606 | $7,300 | $9,843 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $310 | $280 | $430 | $307 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" DEPTH | 535 SY | $5.56 | $8.25 | $5.00 | $5.00 |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 127 CY | $167 | $161 | $150 | $150 |
| 407E10000 TACK COAT | 297 GAL | $2.23 | $2.25 | $2.00 | $2.00 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (87 CY | $256 | $324 | $230 | $230 |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 326 FT | $38.50 | $32.00 | $37.00 | $35.00 |
| 609E26000 CURB, TYPE 6 | 91 FT | $41.00 | $26.50 | $40.00 | $37.50 |
| 611E97300 CONDUIT, MISC.: 8-INCH SANITARY SEWER VIDEO RECORD | 1 LS | $2,111 | $2,500 | $3,000 | $737 |
| 611E97300 CONDUIT, MISC.: MAINTAING SANITARY FLOW DURING CON | 1 LS | $9,111 | $5,000 | $40,000 | $8,045 |
| 611E97400 CONDUIT, MISC.: 8-INCH SANITARY SEWER, SCSED | 268 FT | $54.00 | $82.00 | $90.00 | $170 |
| 611E99690 MANHOLE, MISC.:SANITARY SEWER MANHOLE SHALLOW PREC | 1 EACH | $3,500 | $4,100 | $4,000 | $4,818 |
| 611E99690 MANHOLE, MISC.:SANITARY SEWER MANHOLE TYPE A, SCSE | 1 EACH | $4,504 | $4,100 | $5,000 | $5,726 |
| 625E00450 CONNECTION, FUSED PULL APART | 6 EACH | $161 | $145 | $145 | $145 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 12 EACH | $161 | $145 | $145 | $145 |
| 625E10503 LIGHT POLE (INSTALLATION ONLY), AS PER PLAN | 2 EACH | $444 | $400 | $400 | $400 |
| 625E23302 NO. 6 AWG 2400 VOLT DISTRIBUTION CABLE | 1,119 FT | $4.17 | $3.75 | $3.75 | $4.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 72 FT | $2.33 | $2.10 | $2.10 | $2.50 |
| 625E24321 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 116 FT | $27.80 | $25.00 | $25.00 | $25.00 |
| 625E25300 CONDUIT, 1-1/2", 725.04 | 238 FT | $20.00 | $18.00 | $18.00 | $18.00 |
| 625E25500 CONDUIT, 3", 725.04 | 65 FT | $42.25 | $38.00 | $38.00 | $38.00 |
| 625E27503 LUMINAIRE, UNDERPASS, SOLID STATE (LED), AS PER PL | 6 EACH | $1,055 | $950 | $950 | $950 |
| 625E27561 LUMINAIRE, INSTALLATION ONLY, AS PER PLAN | 2 EACH | $222 | $200 | $200 | $200 |
| 625E29002 TRENCH, 24" DEEP | 399 FT | $1.33 | $12.00 | $12.00 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 7 EACH | $1,055 | $950 | $950 | $950 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $333 | $300 | $300 | $300 |
| 625E32000 GROUND ROD | 2 EACH | $361 | $325 | $325 | $325 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,889 | $6,200 | $6,200 | $6,200 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 399 FT | $2.78 | $2.50 | $2.50 | $3.00 |
| 625E37101 SERVICE TO UNDERPASS LIGHTING, AS PER PLAN | 1 EACH | $4,667 | $4,200 | $4,200 | $4,200 |
| 625E75800 DISCONNECT CIRCUIT | 3 EACH | $278 | $250 | $250 | $250 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, (CC-'F') | 1 EACH | $1,333 | $1,200 | $1,200 | $1,200 |
| 625E98000 LIGHTING, MISC.: LIGHT POLE FOUNDATION, 20" X 5' D | 2 EACH | $1,222 | $1,100 | $1,100 | $1,100 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 26 FT | $13.34 | $12.00 | $12.00 | $12.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 31 FT | $15.56 | $14.00 | $14.00 | $14.00 |
| 630E80100 SIGN, FLAT SHEET | 28.5 SF | $20.00 | $28.50 | $18.00 | $18.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $22.00 | $20.00 | $20.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $33.00 | $30.00 | $30.00 | $30.00 |
| 644E00100 EDGE LINE, 4" | 0.05 MILE | $16,667 | $3,800 | $15,000 | $15,000 |
| 644E00200 LANE LINE, 4" | 0.03 MILE | $12,223 | $2,800 | $11,000 | $11,000 |
| 644E00300 CENTER LINE | 0.03 MILE | $20,000 | $7,500 | $18,000 | $18,000 |
| 644E00400 CHANNELIZING LINE, 8" | 87 FT | $1.40 | $1.25 | $1.25 | $1.25 |
| 644E00620 CROSSWALK LINE, 12" | 235 FT | $3.61 | $3.25 | $3.25 | $3.25 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 6 FT | $7.25 | $6.50 | $6.50 | $6.50 |
| 644E01300 LANE ARROW | 1 EACH | $139 | $125 | $125 | $125 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $90.00 | $65.00 | $68.00 | $75.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $8,611 | $7,750 | $7,750 | $7,750 |
| 616E10000 WATER | 20 MGAL | $1.00 | $100 | $50.00 | $1.00 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $11,666 | $35,000 | $1.00 | $50,000 |
| 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT | 144 EACH | $35.00 | $16.00 | $30.00 | $20.00 |
| 511E46612 CLASS QC1 CONCRETE WITH QC/QA, HEADWALL | 10 CY | $857 | $1,200 | $1,725 | $1,100 |
| 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN(PERMANEN | 240 SY | $35.50 | $32.00 | $26.50 | $20.00 |
| 512E33000 TYPE 2 WATERPROOFING | 236 SY | $21.00 | $17.75 | $24.00 | $21.00 |
| 512E33010 TYPE 3 WATERPROOFING | 206 SY | $43.00 | $37.90 | $30.50 | $67.00 |
| 513E20000 WELDED STUD SHEAR CONNECTORS | 662 EACH | $6.65 | $18.75 | $21.00 | $8.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 105 SF | $1.90 | $12.50 | $5.00 | $5.00 |
| 518E20000 PREFABRICATED GEOCOMPOSITE DRAIN | 193 SY | $15.00 | $22.78 | $50.00 | $18.00 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 125 CY | $133 | $73.00 | $110 | $124 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 155 FT | $7.00 | $25.00 | $12.00 | $12.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 85 FT | $7.00 | $25.00 | $23.00 | $16.00 |
| 530E13000 SPECIAL - FORM LINER | 4,168 SF | $3.65 | $5.00 | $7.00 | $5.00 |
| 607E98000 FENCE, MISC.:ALUMINUM FENCE | 153 FT | $158 | $110 | $145 | $145 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $20,889 | $40,000 | $13,000 | $23,800 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,334 | $5,000 | $5,000 | $20,000 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,000 | $3,000 | $3,500 | $2,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION | 1 LS | $1,000 | $2,500 | $3,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96455 16' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN(3"-1 | 95 FT | $2,215 | $210k | 10% |
| 203E10000 EXCAVATION | 9,599 CY | $20 | $192k | 9% |
| 507E00400 STEEL PILES, MISC.:W18 PILES, GALVANIZED, FURNISHE | 993 FT | $157.4 | $156k | 8% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 676 FT | $213 | $144k | 7% |
| 511E46012 CLASS QC1 CONCRETE WITH QC/QA, RETAINING/WINGWALL | 172 CY | $715 | $123k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $118,961 | $119k | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $74,333 | $74k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 40,887 LB | $1.78 | $73k | 4% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 318 FT | $200 | $64k | 3% |
| 611E97400 CONDUIT, MISC.:14-INCH FORCE MAIN, DIP CLASS 52, M | 236 FT | $225 | $53k | 3% |