LOG-SR 47/SR 235-05.23/08.18
LOG County · est $2.2M
Bid dateThursday, March 31—
LOG County · est $2.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 84 more items below.
| Item | Quantity | R1Trucco Construction CO INC | R2Wolf Creek Contracting Company LLC | R3Shelly Company | % of bid |
|---|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 8,594 SY | $77.18 | $75.06 | $54.00 | 30% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,349 CY | $160 | $180 | $160 | 10% |
| 452E19250 NON-REINFORCED CONCRETE PAVEMENT, MISC.: CONCRETE, | 14,192 SF | $13.75 | $7.75 | $11.50 | 9% |
| 203E10000 EXCAVATION | 3,633 CY | $38.00 | $11.06 | $34.00 | 6% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,687 CY | $46.10 | $74.86 |
| Item | Quantity | R1Trucco Construction CO INC | R2Wolf Creek Contracting Company LLC | R3Shelly Company |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $17,476 | $3,305 | $80,000 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 226 FT | $20.25 | $37.95 | $40.00 |
| 202E75001 FENCE REMOVED, AS PER PLAN | 937 FT | $4.00 | $2.75 | $3.00 |
| 202E98100 REMOVAL MISC.: POST REMOVED | 3 EACH | $66.31 | $28.50 | $100 |
| 202E98100 REMOVAL MISC.: WOODEN POST-MOUNTED SIGN REMOVED | 1 EACH | $634 | $380 | $300 |
| 203E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $62.00 |
| 6% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $117,000 | $101,002 | $240,000 | 5% |
| 304E20000 AGGREGATE BASE | 1,572 CY | $67.00 | $104 | $70.00 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $129,103 | $150,000 | 5% |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 333 CY | $236 | $260 | $236 | 4% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 285 CY | $236 | $260 | $236 | 3% |
| 204E13000 EXCAVATION OF SUBGRADE | 2,307 CY | $27.50 | $17.42 | $34.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $56,400 | $78,149 | $250,000 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 3,306 FT | $14.50 | $16.98 | $16.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 5,064 SY | $8.00 | $4.23 | $8.00 | 2% |
| 601E32305 ROCK CHANNEL PROTECTION, TYPE D WITH GEOTEXTILE FA | 217 CY | $138 | $73.53 | $130 | 1% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 2,365 FT | $12.35 | $32.37 | $20.00 | 1% |
| 832E30000 EROSION CONTROL | 29,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 614E12420 DETOUR SIGNING | 1 LS | $28,000 | $30,800 | $28,000 | 1% |
| 202E67000 REGULATED UNDERGROUND STORAGE TANK REMOVED | 2 EACH | $12,758 | $4,917 | $10,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $24,807 | $1,650 | $25,000 | 1% |
| 1,417 CY |
| $3.00 |
| $18.50 |
| $15.00 |
| 204E10000 SUBGRADE COMPACTION | 7,965 SY | $2.25 | $1.29 | $1.50 |
| 204E45000 PROOF ROLLING | 20 HOUR | $225 | $185 | $150 |
| 204E50000 GEOTEXTILE FABRIC | 8,055 SY | $1.80 | $1.75 | $1.50 |
| 607E30001 FENCE, SNOW, AS PER PLAN | 840 FT | $2.00 | $16.23 | $3.00 |
| 623E38500 MONUMENT ASSEMBLY | 4 EACH | $1,273 | $696 | $2,000 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 88 SY | $117 | $52.55 | $120 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $50.00 | $165 | $70.00 |
| 659E00300 TOPSOIL | 1,436 CY | $9.90 | $71.50 | $18.00 |
| 659E10000 SEEDING AND MULCHING | 12,500 SY | $1.25 | $2.04 | $1.03 |
| 659E14000 REPAIR SEEDING AND MULCHING | 625 SY | $0.60 | $44.00 | $1.03 |
| 659E15000 INTER-SEEDING | 625 SY | $0.30 | $11.00 | $0.50 |
| 659E20000 COMMERCIAL FERTILIZER | 1.87 TON | $600 | $743 | $650 |
| 659E31000 LIME | 2.67 ACRE | $5.00 | $82.50 | $35.00 |
| 659E35000 WATER | 37 MGAL | $15.00 | $1.10 | $1.00 |
| 660E30000 SODDING UNSTAKED | 64 SY | $30.00 | $16.23 | $10.00 |
| 670E00700 DITCH EROSION PROTECTION | 1,120 SY | $2.20 | $3.25 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,575 | $4,917 | $1,575 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $3,475 | $4,917 | $10,425 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $16,926 | $4,917 | $12,000 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 331 FT | $26.00 | $16.89 | $16.00 |
| 611E00900 6" CONDUIT, TYPE B | 200 FT | $15.70 | $28.78 | $20.00 |
| 611E01400 6" CONDUIT, TYPE E | 200 FT | $13.00 | $29.65 | $10.00 |
| 611E01500 6" CONDUIT, TYPE F | 200 FT | $15.35 | $29.65 | $10.00 |
| 611E04900 12" CONDUIT, TYPE D | 239 FT | $32.40 | $41.37 | $70.00 |
| 611E07900 18" CONDUIT, TYPE D | 35 FT | $52.50 | $85.64 | $105 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 13 EACH | $190 | $321 | $450 |
| 407E20000 NON-TRACKING TACK COAT | 419 GAL | $2.50 | $2.75 | $2.50 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 97 SY | $124 | $84.47 | $80.00 |
| 609E18000 COMBINATION CURB AND GUTTER, TYPE 3 | 741 FT | $24.15 | $33.28 | $25.00 |
| 609E22000 CURB, TYPE 3-B | 1,752 FT | $12.00 | $34.39 | $14.00 |
| 609E26000 CURB, TYPE 6 | 225 FT | $16.30 | $31.56 | $17.00 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN | 317 FT | $15.91 | $48.16 | $21.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 16 EACH | $79.28 | $138 | $150 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 8 EACH | $83.25 | $154 | $150 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 18 EACH | $102 | $110 | $175 |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B30 | 8 EACH | $2,696 | $4,125 | $3,000 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 8 EACH | $1,232 | $1,980 | $1,200 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 2,619 FT | $3.08 | $3.52 | $3.25 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,320 FT | $2.12 | $1.10 | $2.00 |
| 625E25408 CONDUIT, 2", 725.051 | 387 FT | $9.35 | $6.60 | $13.00 |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 4" | 384 FT | $25.43 | $24.20 | $42.00 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), 240V, | 8 EACH | $563 | $935 | $525 |
| 625E29002 TRENCH, 24" DEEP | 339 FT | $8.36 | $13.20 | $10.00 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 6 EACH | $924 | $825 | $1,200 |
| 625E30707 PULL BOX, 725.08, 24", AS PER PLAN | 1 EACH | $1,068 | $1,980 | $1,300 |
| 625E32000 GROUND ROD | 9 EACH | $366 | $187 | $325 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,257 | $6,380 | $12,000 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 771 FT | $1.07 | $0.66 | $1.20 |
| 625E98000 LIGHTING, MISC.: TEMPORARY LIGHTING SYSTEM | 1 EACH | $7,723 | $11,000 | $6,000 |
| 621E00100 RPM | 20 EACH | $180 | $209 | $105 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 23 EACH | $20.05 | $6.43 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 971 FT | $13.00 | $15.40 | $13.00 |
| 630E80100 SIGN, FLAT SHEET | 488 SF | $25.00 | $21.45 | $25.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 47 EACH | $20.00 | $11.00 | $20.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 31 EACH | $20.00 | $16.50 | $20.00 |
| 644E00104 EDGE LINE, 6" | 0.85 MILE | $6,620 | $7,363 | $8,000 |
| 644E00300 CENTER LINE | 0.26 MILE | $9,160 | $11,156 | $9,000 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 300 FT | $8.60 | $10.03 | $8.00 |
| 644E01514 DOTTED LINE, 8" | 153 FT | $2.20 | $3.34 | $4.00 |
| 644E20800 YIELD LINE | 56 FT | $12.65 | $33.55 | $30.00 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,100 | $3,080 | $1,000 |
| 410E10000 TRAFFIC COMPACTED SURFACE, TYPE A | 89 CY | $92.00 | $70.38 | $35.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 48 HOUR | $80.00 | $93.50 | $65.00 |
| 614E12380 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,200 | $2,464 | $2,240 |
| 614E12600 REPLACEMENT DRUM | 50 EACH | $64.00 | $70.40 | $64.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 97 EACH | $20.00 | $13.20 | $12.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 1.61 MILE | $2,500 | $3,003 | $2,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 4.37 MILE | $1,500 | $2,027 | $900 |
| 614E24614 WORK ZONE DOTTED LINE, CLASS III, 8", 642 PAINT | 135 FT | $3.00 | $1.27 | $3.00 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 65 FT | $4.00 | $5.52 | $6.00 |
| 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT | 3 EACH | $35.00 | $38.50 | $125 |
| 614E98100 WORK ZONE PAVEMENT MARKING, MISC.: YIELD LINE | 56 FT | $5.00 | $12.80 | $25.00 |
| 616E10000 WATER | 15 MGAL | $73.00 | $1.10 | $30.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1, 1WAY | 97 EACH | $8.00 | $8.80 | $6.00 |
| 690E65016 SPECIAL - WORK INVOLVING PETROLEUM CONTAMINATED SO | 19 TON | $168 | $4,917 | $65.00 |
| 690E65300 SPECIAL - GROUND WATER MONITORING WELL ABANDONMENT | 1 EACH | $1,532 | $4,917 | $5,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,523 | $24,041 | $10,000 |
| 619E16010 FIELD OFFICE, TYPE B | 5 MNTH | $2,500 | $2,186 | $2,200 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A | 8,594 SY | $77.18 | $663k | 25% |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 1,349 CY | $160 | $216k | 8% |
| 452E19250 NON-REINFORCED CONCRETE PAVEMENT, MISC.: CONCRETE, | 14,192 SF | $13.75 | $195k | 7% |
| 203E10000 EXCAVATION | 3,633 CY | $38 | $138k | 5% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 2,687 CY | $46.1 | $124k | 5% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $117,000 | $117k | 4% |
| 304E20000 AGGREGATE BASE | 1,572 CY | $67 | $105k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 4% |
| 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 333 CY | $236 | $79k | 3% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 285 CY | $236 | $67k | 3% |