D05-FY 2022 Signal Upgrade
D05 County · est $1.0M
Bid dateThursday, May 12—
D05 County · est $1.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 59 more items below.
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3M P Dory CO | R4Shelly Company | % of bid |
|---|---|---|---|---|---|---|
| 632E64000 STRAIN POLE FOUNDATION | 22 EACH | $6,550 | $7,500 | $6,300 | $7,850 | 18% |
| 632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 10 EACH | $9,645 | $10,000 | $10,420 | $12,900 | 12% |
| 809E69000 ADVANCE RADAR DETECTION | 11 EACH | $7,300 | $7,000 | $7,800 | $7,400 | 10% |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 8 EACH | $9,455 | $10,000 | $10,230 | $12,500 | 9% |
| 809E69100 STOP LINE RADAR DETECTION | 8 EACH | $6,855 | $6,800 | $7,500 | $7,100 | 7% |
| 632E70001 POWER SERVICE, AS PER PLAN | 9 EACH | $5,145 | $6,000 | $4,680 | $5,000 |
| Item | Quantity | R1Perram Electric INC | R2Complete General Construction Company | R3M P Dory CO | R4Shelly Company |
|---|---|---|---|---|---|
| 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A | 1 EACH | $1,650 | $365 | $400 | $365 |
| 202E98200 REMOVAL MISC.: PRIVATE FENCE | 60 FT | $6.45 | $15.00 | $5.00 | $22.50 |
| 203E10000 EXCAVATION | 39 CY | $246 | $70.00 | $125 | $200 |
| 203E20000 EMBANKMENT | 56 CY | $35.80 | $20.00 | $125 | $78.00 |
| 204E10000 SUBGRADE COMPACTION |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,725 | $20,000 | $5,000 | $135,500 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40,000 | $42,500 | $60,000 | 5% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 9 EACH | $3,930 | $3,000 | $3,300 | $9,000 | 4% |
| 632E30300 MESSENGER WIRE, 7 STRAND, 7/16" DIAMETER WITH ACCE | 1,962 FT | $14.55 | $19.00 | $14.25 | $25.00 | 3% |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 1,962 FT | $13.60 | $23.00 | $16.50 | $26.00 | 3% |
| 632E87140 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 2 EACH | $11,670 | $10,900 | $12,500 | $13,985 | 3% |
| 632E86140 STRAIN POLE, TYPE TC-81.11, DESIGN 12 | 2 EACH | $11,070 | $10,900 | $11,900 | $14,000 | 3% |
| 632E04803 VEHICULAR SIGNAL HEAD, (LED), 1-SECTION, 12" LENS, | 40 EACH | $463 | $600 | $580 | $900 | 2% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 22 EACH | $810 | $800 | $870 | $1,100 | 2% |
| 632E67300 POWER CABLE, 3 CONDUCTOR, NO. 8 AWG | 2,611 FT | $5.90 | $6.20 | $3.50 | $1.50 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $14,259 | $9,000 | $6,500 | $10,000 | 2% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 200 CY | $69.75 | $35.00 | $30.00 | $112 | 2% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 4 EACH | $3,270 | $3,300 | $3,800 | $2,750 | 2% |
| 632E79300 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22 DESIGN 4 | 1 EACH | $12,815 | $15,750 | $14,900 | $15,920 | 2% |
| 216 SY |
| $4.35 |
| $11.00 |
| $20.00 |
| $30.00 |
| 304E20000 AGGREGATE BASE | 36 CY | $355 | $110 | $260 | $300 |
| 606E15050 GUARDRAIL, TYPE MGS | 212.5 FT | $39.75 | $27.60 | $32.00 | $27.60 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(NCHRP 350 OR MASH 2016 | 1 EACH | $4,100 | $3,420 | $2,850 | $3,420 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,000 SY | $2.00 | $2.95 | $2.00 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.27 TON | $100 | $1,055 | $1,000 | $900 |
| 659E35000 WATER | 0.11 MGAL | $45.45 | $1.36 | $10.00 | $1,000 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E00450 CONNECTION, FUSED PULL APART | 14 EACH | $128 | $115 | $170 | $265 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 14 EACH | $128 | $110 | $170 | $245 |
| 625E18200 BRACKET ARM, 15' | 2 EACH | $665 | $1,000 | $960 | $930 |
| 625E18400 BRACKET ARM, 20' | 6 EACH | $965 | $1,400 | $1,490 | $1,350 |
| 625E18510 BRACKET ARM, 30' | 6 EACH | $1,850 | $2,100 | $2,600 | $1,700 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 14 EACH | $560 | $500 | $625 | $595 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (ONE-WAY) | 4 EACH | $18.00 | $10.00 | $8.50 | $10.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 28 FT | $19.40 | $18.00 | $20.00 | $18.00 |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 38.1 FT | $49.20 | $70.00 | $35.00 | $70.00 |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 2 EACH | $435 | $625 | $385 | $625 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 19 EACH | $141 | $235 | $150 | $235 |
| 630E80100 SIGN, FLAT SHEET | 73.2 SF | $23.15 | $20.00 | $28.00 | $20.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 27 SF | $43.55 | $30.00 | $28.00 | $30.00 |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 2 EACH | $1,185 | $975 | $650 | $975 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 11 EACH | $31.35 | $15.00 | $20.00 | $15.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 3 EACH | $345 | $75.00 | $75.00 | $75.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 1 EACH | $185 | $265 | $125 | $265 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $86.00 | $20.00 | $20.00 | $20.00 |
| 630E86010 REMOVAL OF GROUND MOUNTED POST SUPPORT AND REERECT | 2 EACH | $260 | $95.00 | $200 | $95.00 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 2 EACH | $520 | $285 | $300 | $285 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 13 EACH | $86.25 | $20.00 | $20.00 | $20.00 |
| 644E00500 STOP LINE | 250 FT | $16.00 | $16.00 | $16.00 | $20.00 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 250 FT | $16.00 | $16.00 | $16.00 | $10.00 |
| 625E25402 CONDUIT, 2", 725.05 | 142 FT | $13.40 | $22.00 | $16.00 | $9.50 |
| 625E25602 CONDUIT, 4", 725.05 | 113 FT | $21.15 | $35.00 | $28.00 | $17.50 |
| 625E29002 TRENCH, 24" DEEP | 245 FT | $11.95 | $9.00 | $9.50 | $10.60 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $1,265 | $1,250 | $2,100 | $1,075 |
| 625E31510 PULL BOX REMOVED | 29 EACH | $173 | $150 | $350 | $210 |
| 625E32000 GROUND ROD | 28 EACH | $283 | $250 | $400 | $950 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(LOCATION 1) | 1 EACH | $2,500 | $1,700 | $2,500 | $2,000 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(LOCATION 2) | 1 EACH | $2,500 | $1,700 | $2,500 | $2,000 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(LOCATION 3) | 1 EACH | $2,500 | $1,700 | $2,500 | $2,000 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL(LOCATION 8) | 1 EACH | $2,500 | $1,700 | $2,500 | $2,000 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 4 EACH | $1,410 | $1,250 | $1,570 | $1,400 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 66 EACH | $10.00 | $35.00 | $90.00 | $1,180 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 965 FT | $3.50 | $3.00 | $3.80 | $11.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 3,066 FT | $4.10 | $4.00 | $4.70 | $4.65 |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $5,285 | $7,000 | $5,200 | $8,500 |
| 632E79110 COMBINATION SIGNAL SUPPORT, TYPE TC-81.22, DESIGN | 1 EACH | $12,195 | $11,800 | $13,990 | $14,755 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 4 EACH | $940 | $1,500 | $500 | $250 |
| 633E71000 FLASHER CONTROLLER | 5 EACH | $1,115 | $2,295 | $1,500 | $590 |
| 633E99000 CONTROLLER ITEM, MISC.:CABINET, TYPE 332, INSTALLA | 4 EACH | $1,035 | $2,200 | $3,340 | $210 |
| 633E99000 CONTROLLER ITEM, MISC.:UNINTERRUPTIBLE POWER SUPPL | 4 EACH | $1,035 | $950 | $890 | $210 |
| 809E69123 ATC CONTROLLER, AS PER PLAN (INSTALLATION ONLY) | 4 EACH | $86.25 | $400 | $3,300 | $75.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 150 HOUR | $70.00 | $81.00 | $80.00 | $65.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $950 | $950 | $300 | $750 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $9,100 | $4,000 | $22,800 | $70,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 632E64000 STRAIN POLE FOUNDATION | 22 EACH | $6,550 | $144k | 14% |
| 632E87130 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 10 EACH | $9,645 | $96k | 9% |
| 809E69000 ADVANCE RADAR DETECTION | 11 EACH | $7,300 | $80k | 8% |
| 632E86130 STRAIN POLE, TYPE TC-81.11, DESIGN 10 | 8 EACH | $9,455 | $76k | 7% |
| 809E69100 STOP LINE RADAR DETECTION | 8 EACH | $6,855 | $55k | 5% |
| 632E70001 POWER SERVICE, AS PER PLAN | 9 EACH | $5,145 | $46k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $41,725 | $42k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $40,000 | $40k | 4% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 9 EACH | $3,930 | $35k | 3% |
| 632E30300 MESSENGER WIRE, 7 STRAND, 7/16" DIAMETER WITH ACCE | 1,962 FT | $14.55 | $29k | 3% |