MEG-US 33-09.40
MEG County · est $0.6M
Bid dateThursday, May 26—
MEG County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Complete General Construction Company | R2Perram Electric INC | R3Miller Cable Company | R4M P Dory CO | R5Jess Howard Electric CO | % of bid |
|---|---|---|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 15,234 FT | $12.00 | $11.10 | $10.80 | $12.20 | $12.33 | 29% |
| 625E29002 TRENCH, 24" DEEP | 14,547 FT | $8.50 | $8.24 | $11.00 | $8.00 | $8.97 | 20% |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B35 | 19 EACH | $2,500 | $2,908 | $3,600 | $2,840 | $3,327 | 8% |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 33 EACH | $1,050 | $1,895 | $1,300 | $1,950 | $1,783 | 5% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 19 EACH | $1,500 | $2,075 | $2,300 | $1,790 | $2,159 | 5% |
| 625E36010 |
| Item | Quantity | R1Complete General Construction Company | R2Perram Electric INC | R3Miller Cable Company | R4M P Dory CO | R5Jess Howard Electric CO |
|---|---|---|---|---|---|---|
| 659E10000 SEEDING AND MULCHING | 1,000 SY | $6.20 | $1.70 | $3.50 | $4.00 | $5.43 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $1,140 | $610 | $500 | $1,000 | $3,729 |
| 659E31000 LIME | 0.3 ACRE | $50.00 | $120 | $40.00 | $100 | $1,184 |
| 659E35000 WATER | 6 MGAL | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 14,547 FT |
| $1.75 |
| $1.18 |
| $1.90 |
| $1.20 |
| $0.41 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $20,000 | $20,000 | $45,556 | 3% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 147 EACH | $135 | $140 | $95.00 | $140 | $103 | 3% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 5,526 FT | $3.30 | $2.85 | $3.00 | $3.00 | $3.49 | 3% |
| 625E02501 TRANSFORMER BASE, TYPE AT-A, AS PER PLAN | 25 EACH | $700 | $906 | $500 | $1,420 | $493 | 3% |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 7,539 FT | $2.00 | $0.91 | $1.30 | $1.80 | $1.24 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 12 EACH | $1,125 | $1,110 | $1,150 | $1,220 | $1,537 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 92 EACH | $140 | $139 | $95.00 | $140 | $103 | 2% |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 20 EACH | $600 | $450 | $200 | $500 | $535 | 2% |
| 625E32000 GROUND ROD | 46 EACH | $250 | $305 | $275 | $420 | $394 | 2% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 24 EACH | $450 | $510 | $460 | $730 | $573 | 2% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 22 EACH | $450 | $510 | $460 | $730 | $573 | 2% |
| 625E25500 CONDUIT, 3", 725.04 | 138 FT | $71.00 | $34.90 | $48.00 | $72.00 | $95.58 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $9,150 | $11,130 | $6,900 | $12,100 | $11,294 | 1% |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 14,852 FT | $0.60 | $0.36 | $0.20 | $2.90 | $1.71 | 1% |
| $6.00 |
| $1.00 |
| $10.00 |
| $1,146 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 625E00460 CONNECTION, UNFUSED PULL APART | 46 EACH | $131 | $137 | $95.00 | $140 | $115 |
| 625E25910 CONDUIT CLEANED AND CABLES REMOVED | 1,638 FT | $0.60 | $0.35 | $0.25 | $2.30 | $3.49 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,525 | $1,300 | $1,550 | $1,550 | $2,025 |
| 625E31510 PULL BOX REMOVED | 3 EACH | $150 | $320 | $75.00 | $460 | $469 |
| 625E35010 REMOVE AND REERECT EXISTING LIGHT POLE | 1 EACH | $750 | $540 | $2,850 | $1,400 | $687 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $600 | $540 | $550 | $1,400 | $2,497 |
| 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN | 20 EACH | $350 | $360 | $200 | $500 | $804 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $85.00 | $65.00 | $66.00 | $85.00 | $90.89 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 | $9,536 | $6,034 | $4,800 | $3,778 |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $3,000 | $9,500 | $9,632 | $2,400 | $19,670 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,000 | $500 | $5,500 | $2,400 | $10,491 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 15,234 FT | $12 | $183k | 27% |
| 625E29002 TRENCH, 24" DEEP | 14,547 FT | $8.5 | $124k | 18% |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT15B35 | 19 EACH | $2,500 | $48k | 7% |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 33 EACH | $1,050 | $35k | 5% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 19 EACH | $1,500 | $29k | 4% |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 14,547 FT | $1.75 | $25k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 147 EACH | $135 | $20k | 3% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 5,526 FT | $3.3 | $18k | 3% |
| 625E02501 TRANSFORMER BASE, TYPE AT-A, AS PER PLAN | 25 EACH | $700 | $18k | 3% |