D04-GR FY2023 (Systematic)
D04 County · est $0.6M
Bid dateThursday, September 15—
D04 County · est $0.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | % of bid |
|---|---|---|---|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,146 FT | $20.20 | $21.00 | 32% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 75 EACH | $2,420 | $2,600 | 26% |
| AA1 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 450 FT | $120 | $128 | 8% |
| AB1 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 375 FT | $112 | $128 | 6% |
| AA1 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,013 FT | $20.20 | $21.00 | 6% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 26 EACH | $1,120 | $1,250 | 4% |
| 202E38000 GUARDRAIL REMOVED | 15,763 FT | $1.60 | $2.50 | 4% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING |
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO |
|---|---|---|---|
| 202E48001 CABLE BARRIER REMOVED, AS PER PLAN | 325 FT | $7.00 | $5.00 |
| 202E98100 REMOVAL MISC.: CABLE BARRIER ANCHOR REMOVED | 1 EACH | $250 | $575 |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $840 | $750 |
| 606E50000 SPECIAL - RESHAPING BERM | 15,763 FT | $0.08 | $0.25 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 236 EACH | $8.00 | $8.50 |
| AA1 606E50000 SPECIAL - RESHAPING BERM | 3,750 FT | $0.10 | $0.25 |
| AA1 614E11000 MAINTAINING TRAFFIC (ATB-6/TRU-534) | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 125 FT |
| $120 |
| $128 |
| 2% |
| AB1 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 638 FT | $20.20 | $21.00 | 2% |
| AA1 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 12 EACH | $840 | $750 | 1% |
| AA1 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 5 EACH | $1,980 | $2,050 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $20,000 | 1% |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 317 FT | $22.00 | $26.50 | 1% |
| AA1 202E38000 GUARDRAIL REMOVED | 3,750 FT | $1.60 | $2.50 | 1% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 180 HOUR | $33.00 | $75.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,200 | $10,000 | 1% |
| AB1 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 2 EACH | $2,420 | $2,600 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,800 | $5,000 | 1% |
| AA1 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 4 EACH | $1,120 | $1,250 | 1% |
| 606E55150 SPECIAL - CABLE BARRIER, ANCHOR ASSEMBLY | 1 EACH | $3,750 | $5,000 | 1% |
| $800 |
| $1,250 |
| AA1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 10 HOUR | $33.00 | $75.00 |
| AA1 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 53 EACH | $8.00 | $8.50 |
| AB1 202E38000 GUARDRAIL REMOVED | 1,263 FT | $1.60 | $2.50 |
| AB1 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,980 | $2,050 |
| AB1 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,120 | $1,250 |
| AB1 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 4 EACH | $840 | $750 |
| AB1 606E50000 SPECIAL - RESHAPING BERM | 1,263 FT | $0.08 | $0.25 |
| AB1 614E11000 MAINTAINING TRAFFIC (SR-82) | 1 LS | $300 | $1,250 |
| AB1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 12 HOUR | $32.50 | $75.00 |
| AB1 626E00110 BARRIER REFLECTOR, TYPE 2, 1-WAY | 4 EACH | $8.00 | $8.50 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,009 | $5,000 |
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,146 FT | $20.2 | $225k | 31% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E(MASH 2016) | 75 EACH | $2,420 | $182k | 25% |
| AA1 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 450 FT | $120 | $54k | 8% |
| AB1 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 375 FT | $112 | $42k | 6% |
| AA1 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 2,013 FT | $20.2 | $41k | 6% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 26 EACH | $1,120 | $29k | 4% |
| 202E38000 GUARDRAIL REMOVED | 15,763 FT | $1.6 | $25k | 4% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 125 FT | $120 | $15k | 2% |
| AB1 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 638 FT | $20.2 | $13k | 2% |
| AA1 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 12 EACH | $840 | $10k | 1% |