D10-General System GR FY2023
D10 County · est $2.1M
Bid dateThursday, November 3—
D10 County · est $2.1M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 69,325 FT | $16.14 | $1.12M |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 3 more items below.
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO | % of bid |
|---|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 69,325 FT | $16.14 | $16.00 | $18.50 | 65% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 52 EACH | $2,260 | $2,310 | $2,450 | 7% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 53 EACH | $1,980 | $1,950 | $2,000 | 6% |
| 202E38000 GUARDRAIL REMOVED | 62,644 FT | $1.30 | $1.20 | $1.60 | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 53 EACH | $1,100 | $1,120 | $1,150 | 3% |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 2,012.5 FT | $26.54 | $31.20 | $35.00 | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 20 EACH | $1,900 |
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO |
|---|---|---|---|---|
| 202E38500 BRIDGE RAILING REMOVED | 287.5 FT | $1.60 | $2.40 | $3.50 |
| 202E47800 IMPACT ATTENUATOR REMOVED | 8 EACH | $125 | $150 | $175 |
| 606E17500 POST END ANCHOR (OR CONCRETE BLOCK END ANCHOR) | 1 EACH | $1,400 | $1,260 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $2,100 |
| $2,450 |
| 2% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $4,000 | $5,825 | $6,250 | 2% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 12,500 FT | $1.80 | $2.00 | $2.50 | 1% |
| 517E72307 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 287.5 FT | $61.00 | $69.72 | $80.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $17,000 | $21,000 | $25,000 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 1,661 EACH | $8.50 | $7.76 | $8.50 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $9,300 | $17,000 | $50,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $8,900 | $8,447 | $12,850 | 1% |
| 606E50000 SPECIAL - RESHAPING BERM | 77,408.5 FT | $0.10 | $0.04 | $0.20 | 0% |
| 202E38300 GUARDRAIL REMOVED, BARRIER DESIGN | 2,012.5 FT | $2.00 | $2.00 | $3.00 | 0% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 5 EACH | $600 | $700 | $850 | 0% |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 10 EACH | $280 | $375 | $450 | 0% |
| 606E15400 MGS GUARDRAIL, TYPE 8 | 87.5 FT | $25.80 | $33.60 | $35.00 | 0% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,560 | $1,340 | $1,700 | 0% |
| 65% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 52 EACH | $2,260 | $118k | 7% |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 53 EACH | $1,980 | $105k | 6% |
| 202E38000 GUARDRAIL REMOVED | 62,644 FT | $1.3 | $81k | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 53 EACH | $1,100 | $58k | 3% |
| 606E15550 GUARDRAIL, BARRIER DESIGN, TYPE MGS | 2,012.5 FT | $26.54 | $53k | 3% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 20 EACH | $1,900 | $38k | 2% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 8 EACH | $4,000 | $32k | 2% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 12,500 FT | $1.8 | $23k | 1% |
| 517E72307 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 287.5 FT | $61 | $18k | 1% |