D10-Extrusheet Sign FY2023
D10 County · est $1.4M
Bid dateThursday, December 15—
D10 County · est $1.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 32 more items below.
| Item | Quantity | R1M P Dory CO | R2Lake Erie Construction Company | % of bid |
|---|---|---|---|---|
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 3 EACH | $82,000 | $83,850 | 22% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 8,344 SF | $19.70 | $20.00 | 15% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 216 EACH | $725 | $595 | 14% |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 186 EACH | $425 | $385 | 7% |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 2 EACH | $36,000 | $41,250 | 7% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 8 EACH | $8,850 | $9,280 | 6% |
| 630E80225 SIGN, OVERHEAD EXTRUSHEET, AS PER PLAN | 2,580 SF | $20.50 | $21.50 | 5% |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 |
| Item | Quantity | R1M P Dory CO | R2Lake Erie Construction Company |
|---|---|---|---|
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 16 SY | $35.00 | $45.00 |
| 202E38000 GUARDRAIL REMOVED | 787.5 FT | $1.80 | $2.00 |
| 511E71300 CONCRETE, MISC.:CONCRETE REPAIR | 15 SY | $110 | $145 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 5 EACH | $1,200 | $1,295 |
| 621E90000 RPM, MISC.:REFLECTOR REMOVAL | 13 EACH | $20.00 | $17.00 |
| 625E32000 GROUND ROD | 8 EACH | $400 | $295 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 426 FT | $10.00 | $9.75 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 948.8 FT |
| $53.50 |
| $54.00 |
| 5% |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 168 EACH | $150 | $245 | 2% |
| 645E00117 EDGE LINE, 6", TYPE A3, AS PER PLAN | 0.7 MILE | $34,700 | $33,865 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,000 FT | $19.50 | $18.60 | 2% |
| 630E07600 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X12 | 839.8 FT | $23.00 | $26.00 | 2% |
| 645E00417 CHANNELIZING LINE, 12", TYPE A3, AS PER PLAN | 1,529 FT | $11.75 | $11.50 | 2% |
| 630E06400 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, S4X7.7 | 1,020 FT | $16.50 | $19.50 | 2% |
| 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22 | 416.4 FT | $40.00 | $41.50 | 2% |
| 630E06500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W6X9 | 863.1 FT | $17.50 | $21.00 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $20,000 | 1% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 5 EACH | $2,500 | $2,580 | 1% |
| 630E75001 SIGN ATTACHMENT ASSEMBLY, AS PER PLAN | 9 EACH | $1,350 | $1,025 | 1% |
| 630E07000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W8X18 | 320.8 FT | $32.50 | $35.00 | 1% |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 110 FT | $12.50 | $11.40 |
| 630E09001 BREAKAWAY STRUCTURAL BEAM CONNECTION, AS PER PLAN | 4 EACH | $1,050 | $1,175 |
| 630E79501 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN | 2 EACH | $150 | $225 |
| 630E80100 SIGN, FLAT SHEET | 330.7 SF | $13.00 | $15.00 |
| 630E80201 SIGN, GROUND MOUNTED EXTRUSHEET, AS PER PLAN | 80 SF | $20.50 | $22.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 70 EACH | $10.00 | $10.00 |
| 630E85400 REMOVAL OF GROUND MOUNTED MAJOR SIGN AND DISPOSAL | 82 EACH | $100 | $95.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 26 EACH | $12.00 | $15.00 |
| 630E86292 REMOVAL OF GROUND MOUNTED WOODEN BOX BEAM SUPPORT | 22 EACH | $150 | $215 |
| 630E87100 REMOVAL OF OVERHEAD MOUNTED SIGN AND REERECTION | 1 EACH | $1,000 | $525 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 19 EACH | $250 | $145 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $25.00 | $20.00 |
| 630E89706 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 1 EACH | $1,500 | $2,000 |
| 630E89802 REMOVAL OF OVERHEAD SIGN SUPPORT AND DISPOSAL, TYP | 4 EACH | $2,200 | $2,750 |
| 631E97700 SIGN LIGHTING MISC.:REMOVAL OF SIGN LIGHTING | 9 EACH | $1,000 | $485 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 125 FT | $10.50 | $10.25 |
| 644E00720 CHEVRON MARKING | 110 FT | $10.50 | $10.25 |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 1,300 FT | $1.85 | $1.80 |
| 645E00217 LANE LINE, 6", TYPE A3, AS PER PLAN | 0.34 MILE | $26,250 | $25,640 |
| 645E01520 DOTTED LINE, 6", TYPE A3 | 375 FT | $5.25 | $5.10 |
| 850E10110 GROOVING FOR 6" RECESSED PAVEMENT MARKING | — | $0.70 | $0.65 |
| 850E10130 GROOVING FOR 12" RECESSED PAVEMENT MARKING | — | $1.85 | $1.80 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 6 HOUR | $75.00 | $75.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $6,050 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $5,595 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E72420 OVERHEAD SIGN SUPPORT, TYPE TC-15.116, DESIGN 2 | 3 EACH | $82,000 | $246k | 21% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 8,344 SF | $19.7 | $164k | 14% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 216 EACH | $725 | $157k | 13% |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 186 EACH | $425 | $79k | 7% |
| 630E72340 OVERHEAD SIGN SUPPORT, TYPE TC-12.31, DESIGN 12 | 2 EACH | $36,000 | $72k | 6% |
| 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION | 8 EACH | $8,850 | $71k | 6% |
| 630E80225 SIGN, OVERHEAD EXTRUSHEET, AS PER PLAN | 2,580 SF | $20.5 | $53k | 4% |
| 630E08000 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W12X30 | 948.8 FT | $53.5 | $51k | 4% |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 168 EACH | $150 | $25k | 2% |
| 645E00117 EDGE LINE, 6", TYPE A3, AS PER PLAN | 0.7 MILE | $34,700 | $24k | 2% |