| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 224 CY | $83.00 | $95.00 | $120 | 16% |
| 203E10000 EXCAVATION | 320 CY | $49.00 | $30.00 | $50.00 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15,000 | $12,500 | 13% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 89 SY | $119 | $160 | $155 | 9% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 59 CY | $165 | $150 | $155 | 8% |
| 601E28001 DUMPED ROCK FILL, TYPE D, AS PER PLAN | 78 CY | $94.00 | $130 | $135 | 6% |
| 602E20000 CONCRETE MASONRY | 0.79 CY | $7,000 | $5,000 |
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Axis Civil Construction LLC |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 85 SY | $6.50 | $30.00 | $40.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 16 FT | $22.00 | $32.00 | $60.00 |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 125 FT | $3.00 | $10.00 | $10.00 |
| 203E20000 EMBANKMENT | 18 CY | $29.00 | $20.00 | $36.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.03 TON | $1,200 | $1,400 | $1,000 |
| 659E31000 LIME | 0.06 ACRE |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $5,000 |
| 5% |
| 304E20000 AGGREGATE BASE | 52 CY | $93.00 | $150 | $150 | 4% |
| 606E16001 GUARDRAIL REBUILT, AS PER PLAN | 125 FT | $37.25 | $62.00 | $43.50 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $10,000 | $14,000 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,400 | $5,000 | $4,200 | 4% |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 157 FT | $25.50 | $55.00 | $35.00 | 3% |
| 203E35121 GRANULAR MATERIAL, TYPE C, AS PER PLAN | 40 CY | $91.00 | $163 | $158 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,200 | $3,000 | $2,500 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $5,500 | $5,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 249 SY | $7.50 | $5.00 | $7.00 | 2% |
| 832E30000 EROSION CONTROL | 1,500 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 601E32300 ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 8 CY | $125 | $220 | $185 | 1% |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $14,400 | $21,000 | $14,400 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.11 MILE | $7,660 | $11,000 | $7,660 | 1% |
| $1,200 |
| $1,000 |
| $650 |
| 659E35000 WATER | 2 MGAL | $1.00 | $0.01 | $1.00 |
| 616E10000 WATER | 5 MGAL | $1.00 | $1.00 | $1.00 |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC, 712.09, TYPE B | 251 SY | $2.60 | $5.00 | $4.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 224 CY | $83 | $19k | 15% |
| 203E10000 EXCAVATION | 320 CY | $49 | $16k | 13% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 12% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 89 SY | $119 | $11k | 9% |
| 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2) | 59 CY | $165 | $10k | 8% |
| 601E28001 DUMPED ROCK FILL, TYPE D, AS PER PLAN | 78 CY | $94 | $7k | 6% |
| 602E20000 CONCRETE MASONRY | 0.79 CY | $7,000 | $6k | 5% |
| 304E20000 AGGREGATE BASE | 52 CY | $93 | $5k | 4% |
| 606E16001 GUARDRAIL REBUILT, AS PER PLAN | 125 FT | $37.25 | $5k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,500 | $5k | 4% |